Difference between revisions of "Grand Canyon Monitoring and Research Center (GCMRC)"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 38: | Line 38: | ||
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | |class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | ||
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | {|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | ||
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;"> | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;">Grand Canyon Monitoring and Research Center (GCMRC)</h2> |
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
− | The | + | =='''2016 LTEMP ROD'''== |
+ | The GCMRC will continue as one of the elements of GCDAMP, consistent with and for the purposes of the 1992 GCPA. The GCMRC will continue to function as a long-term monitoring and research center as was envisioned with its establishment in 1995 to provide scientific advice to GCDAMP, including the Secretary of the Interior, his/her designee, DOI managers, and AMWG. The Assistant Secretary for Water and Science or his/her designee, the Director of USGS or his/her designee, the Commissioner of Reclamation and his/her designee, and the Director of the NPS and his/her designee shall continue to provide policy and programmatic guidance to the GCMRC Chief and review the policies and protocols that govern the operations of GCMRC at least every 5 years. The GCRMC leads the coordination of the monitoring and research of the CRE and facilitates communication and information exchange between GCDAMP, including scientists, DOI, AMWG, Technical Working Group (TWG), and the Science Advisors Program. The GCMRC will be independent from any single stakeholder within the AMWG. The GCMRC will continue conducting monitoring and research activities as guided by the LTEMP FEIS and ROD priorities and commitments. The administrative responsibilities of GCMRC will continue to include managing resource data, reporting monitoring and research results, administering contracts and developing annual research and monitoring reports, and providing technical resource advice related to the GCPA. [https://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf] | ||
− | + | =='''2008 Report from the Roles Ad Hoc Group [https://www.usbr.gov/uc/progact/amp/amwg/2010-02-03-amwg-meeting/Attach_04.pdf]'''== | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
'''GCMRC participation in Ad Hoc Groups''' | '''GCMRC participation in Ad Hoc Groups''' | ||
Line 357: | Line 298: | ||
all such activities, so they can be included in the BWP. Information about these activities will be | all such activities, so they can be included in the BWP. Information about these activities will be | ||
incorporated into the AMP work plan and budget development process. | incorporated into the AMP work plan and budget development process. | ||
+ | |||
+ | =='''2001 Strategic Science Plan'''== | ||
+ | The Grand Canyon Monitoring and Research Center leads the monitoring and research of the Colorado River ecosystem and facilitates communication and information exchange between scientists and members of the Technical Work Group and Adaptive Management Work Group. Other functions of the Grand Canyon Monitoring and Research Center are: | ||
+ | |||
+ | *Advocate quality, objective science, and the use of that science in the adaptive management decision process; | ||
+ | *Provide scientific information about resources in the Colorado River ecosystem; | ||
+ | *Support the Secretary of the Interior’s Designee and the Adaptive Management Work Group in a technical advisory role; | ||
+ | *Develop research designs and proposals for implementing (by the Grand Canyon Monitoring and Research Center or its contractors) monitoring and research activities in support of information needs; | ||
+ | *Coordinate review of the monitoring and research program with independent review panels; | ||
+ | *Coordinate, prepare, and distribute technical reports and documentation for review and as final products; | ||
+ | *Prepare and forward technical management recommendations and annual reports, as specified in Section 1804 of the Grand Canyon Protect Act, to the Technical Work Group; | ||
+ | *Manage data collected as part of the Adaptive Management Program and serve as a repository for other information about the Colorado River ecosystem; | ||
+ | *Administer research proposals through a competitive contract process, as appropriate; | ||
+ | *Develop, with the Technical Work Group, criteria and standards for monitoring and research programs; and | ||
+ | *Develop, with the Technical Work Group, resource management questions (i.e., information needs). | ||
+ | *Produce the State of the Colorado River Ecosystem Report. [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf] | ||
+ | |||
+ | |} | ||
+ | |||
+ | |||
+ | <!-- | ||
+ | |||
+ | --------------------------------ADDITIONAL-------------------------------> | ||
+ | |class="MainPageBG" style="width:45%; border:1px solid #cedff2; background:#f5faff; vertical-align:top;"| | ||
+ | {| width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | ||
+ | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Links</h2> | ||
+ | |- | ||
+ | |style="color:#000;"| | ||
+ | |||
+ | *[https://www.gcmrc.gov/ Grand Canyon Research and Monitoring Center (GCMRC) homepage] | ||
+ | *[http://gcdamp.com/index.php?title=Portal:GCDAMP_Knowlege_Assessments Knowledge Assessments, Annual Reporting Meetings, and SCORE Reports Page] | ||
+ | |||
+ | |- | ||
+ | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Projects</h2> | ||
+ | |- | ||
+ | |style="color:#000;"| | ||
+ | |||
+ | |||
+ | |- | ||
+ | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Presentations and Papers</h2> | ||
+ | |- | ||
+ | |style="color:#000;"| | ||
+ | |||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2024-02-29-amwg-meeting/20240229-ManagingDataResourcesOnlineContentGCMRCandGCDAMP-508-UCRO.pdf Managing Data Resources and Online Content for GCMRC & GCDAMP ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2024-01-25-twg-meeting/20240125-AnnualReportingMeeting-ManagingDataResourcesOnlineContentGCMRCandGCDAMP-508-UCRO.pdf Managing Data Resources and Online Content for GCMRC & GCDAMP ] | ||
+ | *[[Media:TWG-ARM-FY22-ModernizingDataTelemetryColoradoRiver.pdf| Modernizing data telemetry efforts for important riparian resources in Grand Canyon]] | ||
+ | *[[Media:CDI_Workshop_2023_Poster_Thomas_SUBMITTED_-_Copy.pdf| Automating Sensor-to-Cloud Workflows for Riparian Resources in Grand Canyon]] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2022-06-16-twg-meeting/20220616-GCMRCCooperatorTribalRiverTripsFieldActivitiesOccurredPlannedFromJanuary-October2022-508-UCRO.pdf GCMRC, Cooperator, and Tribal River Trips and Field Activities Occurred or Planned From January 1 to the end of October 2022 ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2021-10-14-twg-meeting/20211014-RiverTripsFieldActivitiesOccurredPlannedForCalendarYear2021-508-UCRO.pdf GCMRC, Cooperator, and Tribal River Trips and Field Activities Occurred or Planned For Calendar Year 2021 ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2021-06-17-twg-meeting/20210617-GCMRCCooperatorTribalRiverTripsFieldActivitiesOccurredPlannedCalendarYear2021-508-UCRO.pdf GCMRC, Cooperator, and Tribal River Trips and Field Activities Occurred or Planned for Calendar Year 2021 ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2021-04-14-twg-meeting/20210414-GCMRCCooperatorTribalRiverTrips-508-UCRO.pdf GCMRC, Cooperator, and Tribal River Trips and Field Activities Occurred or Planned January 1 through June 2021 ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2020-10-15-twg-meeting/20201015-RiverTripsFieldActivitiesJan-Dec2020-Schedule-508-UCRO.pdf GCMRC, Cooperator, and Tribal River Trips and Field Activities, January-December 2020 ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2020-10-15-twg-meeting/20201015-RiverTripsFieldActivitiesPostponedCancelledApril-August2020-Schedule-508-UCRO.pdf GCMRC, Cooperator, and Tribal River Trips and Field Activities, Postponed or Cancelled April-August 2020 ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2020-06-24-twg-meeting/20200624-CancelledPostponedRiverTrips-508-UCRO.pdf GCMRC, Cooperator, and Tribal River Trips and Field Activities Cancelled or Postponed through June 2020 ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2020-06-24-twg-meeting/20200624-RiverTrips-June-Sept2020-508-UCRO.pdf GCMRC, Cooperator, and Tribal River Trips and Field Activities, June through September 2020 ] | ||
+ | *[https://doi.org/10.3133/fs20193041 Southwest Biological Science Center staff, 2019, The U.S. Geological Survey Southwest Biological Science Center—Sound science to serve the American southwest: U.S. Geological Survey Fact Sheet 2019-3041, 4 p.] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11oct20/Attach_06.pdf Memo from Dr. Jack Schmidt to the TWG Dated October 18, 2011, Subject: Thoughts about the GCDAMP and GCMRC's Role in That Program] <br> | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10nov15/Attach_12.xlsx Reports Tracking Update --> GCMRC Publications Fiscal Year 2010] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_22.pdf AIF: 1) GCMRC Updates; Proposed April 13-15, 2010 Integrated Modeling Workshop at Saguaro Lake Ranch, AZ ] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_23.pdf Final Agenda for the Integrated Modeling Workshop] | ||
+ | |||
|} | |} |
Latest revision as of 13:43, 25 September 2024
|
The Grand Canyon Research and Monitoring Center (GCMRC) was created to fulfill the mandate in the Grand Canyon Protection Act for the “establishment and implementation of a long-term monitoring and research program to ensure that Glen Canyon Dam is operated in a manner that protects the values for which the Grand Canyon National Park and the Glen Canyon National Recreation Area were created.” The Grand Canyon Monitoring and Research Center serves as the science center for the Glen Canyon Dam Adaptive Management Program. |
-- |
-- |
-- |
---|
|
|