Difference between revisions of "LTEMP Metrics"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 17: | Line 17: | ||
</table> | </table> | ||
| + | [[Image:Metrics.jpg|300px|link=Metrics]] | ||
<!-- | <!-- | ||
| Line 23: | Line 24: | ||
|style="width:60%; font-size:120%;"| | |style="width:60%; font-size:120%;"| | ||
| + | ==LTEMP Metrics== | ||
| + | Section 6.1 (c) of the 2016 LTEMP ROD states that “The DOI, in consultation with the Adaptive Management Working Group, will develop monitoring metrics for the goals and objectives using those in Appendix C of the FEIS as a starting point” (DOI, 2016b). Appendix C refers to a suite of “performance metrics” developed by Runge and others (2015) for evaluating the relative merits of the seven alternatives evaluated in the 2016 EIS. Those metrics were “intended to be objective measures of the performance of alternatives relative to goals for each affected resource being evaluated in the LTEMP EIS” (Runge and others, 2015). Comparisons of the performance of those metrics, among other considerations, ultimately led to selection of Alternative D as the preferred alternative. | ||
| + | |||
| + | The performance metrics developed by Runge and others (2015), while suitable for comparing draft alternatives, were not designed nor intended to measure resource outcomes based on empirical observations of resource condition following implementation of the LTEMP. In 2019, the DOI’s Assistant Secretary for Water and Science directed the Bureau of Reclamation Glen Canyon Dam Adaptive Management Program (GCDAMP) to identify a set of “metrics” for assessing how well the selected alternative was meeting the goals and objectives stated in the LTEMP (DOI, 2016b). In fiscal years 2021-2023, Reclamation coordinated with the U.S. Geological Survey (USGS) Grand Canyon Monitoring and Research Center (GCMRC) to work with GCDAMP stakeholders in developing a new set of performance metrics for tracking progress towards attaining the resource goals specified in the LTEMP, using the previous performance metrics as a starting point. [https://gcdamp.com/images_gcdamp_com/3/3b/USGS_GCMRC_Status_of_LTEMP_Metrics_Report_Dec11_2025-508Comp.pdf] | ||
|}<!-- | |}<!-- | ||
| Line 173: | Line 178: | ||
|style="color:#000;"| | |style="color:#000;"| | ||
| + | *[[Media:USGS GCMRC Status of LTEMP Metrics Report Dec11 2025-508Comp.pdf| 2025 LTEMP Metrics Report]] | ||
| + | *[https://gcdamp.com/index.php/GCDAMP_Planning GCDAMP Planning and Guiding Documents] | ||
| + | *[https://gcdamp.com/index.php/Long-term_Experimental_and_Management_Plan_(LTEMP) The Long-term Experimental and Management Plan (LTEMP)] | ||
|- | |- | ||
| Line 182: | Line 190: | ||
*[https://gcdamp.com/index.php/File:Goal_2_Natural_Processes_Metrics.jpg Natural Processes] | *[https://gcdamp.com/index.php/File:Goal_2_Natural_Processes_Metrics.jpg Natural Processes] | ||
*[https://gcdamp.com/images_gcdamp_com/2/2e/BAO_Approved_POSTER_Dzul_IP-186132_HBC_Metrics_2025_v3%2C1-28-2026.pdf Humpback Chub] | *[https://gcdamp.com/images_gcdamp_com/2/2e/BAO_Approved_POSTER_Dzul_IP-186132_HBC_Metrics_2025_v3%2C1-28-2026.pdf Humpback Chub] | ||
| − | *Hydropower and Energy | + | *[[Media:BAO_Approved-Hydropower_Metrics_Poster-MAnderson_20260122_1511.pdf|Hydropower and Energy]] |
*Other Native Fish | *Other Native Fish | ||
| − | *Recreational Experience | + | *[[Media:BAO_Approved-Recreation_Metrics_Poster-MAnderson_20260122.pdf|Recreational Experience]] |
*Sediment | *Sediment | ||
| − | *Tribal Perspectives | + | *[[Media:BAO_Approved-Tribal_MetricsPoster,MAnderson_20260128_1022.pdf|Tribal Perspectives]] |
*Rainbow Trout Fishery | *Rainbow Trout Fishery | ||
*Nonnative Invasive Species | *Nonnative Invasive Species | ||
*[https://gcdamp.com/index.php/File:Goal_11_Riparian_Vegetation.jpg Riparian Vegetation] | *[https://gcdamp.com/index.php/File:Goal_11_Riparian_Vegetation.jpg Riparian Vegetation] | ||
| − | |||
|- | |- | ||
| Line 197: | Line 204: | ||
|style="color:#000;"| | |style="color:#000;"| | ||
| + | *[https://www.usbr.gov/uc/progact/amp/twg/2025-12-11-twg-meeting/uc-gcdamp-twg-ltempmetrics-statusreport-508-20251211.pdf Status Report on the Long-Term Experimental & Management Plan (LTEMP) Metrics for the Glen Canyon Dam Adaptive Management Program] | ||
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2025-08-21-amwg-meeting/uc-gcdamp-amwg-monitoringmetricsfutureuse-508-20250821.pdf Monitoring Metrics Future Use] | ||
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2025-08-21-amwg-meeting/uc-gcdamp-amwg-draftperformancemetrics-508-20250821.pdf Final Draft Performance Metrics for the Long-Term Experimental & Management Plan] | ||
| + | *[https://www.usbr.gov/uc/progact/amp/twg/2025-04-10-twg-meeting/uc-gcdamp-twg-arm-monitoringmetricssummarytable-508-20250410.pdf Monitoring Metrics Summary Table] | ||
| + | *[https://www.usbr.gov/uc/progact/amp/twg/2025-04-10-twg-meeting/uc-gcdamp-twg-arm-goal1metrics-fy2024-508-20250410.pdf Update on the Status of Goal 1 Metrics for FY2024] | ||
| + | *[https://www.usbr.gov/uc/progact/amp/twg/2021-10-14-twg-meeting/20211014-ExampleMetricsLong-TermExperimentalManagementPlan-Presentation-508-UCRO.pdf Example Metrics for the Long-Term Experimental and Management Plan] | ||
| + | *[https://www.usbr.gov/uc/progact/amp/twg/2021-06-17-twg-meeting/20210617-MonitoringMetrics-DraftPlan-508-UCRO.pdf Monitoring Metrics Draft Plan ] | ||
|- | |- | ||
Latest revision as of 16:18, 8 September 2026
|
|
LTEMP MetricsSection 6.1 (c) of the 2016 LTEMP ROD states that “The DOI, in consultation with the Adaptive Management Working Group, will develop monitoring metrics for the goals and objectives using those in Appendix C of the FEIS as a starting point” (DOI, 2016b). Appendix C refers to a suite of “performance metrics” developed by Runge and others (2015) for evaluating the relative merits of the seven alternatives evaluated in the 2016 EIS. Those metrics were “intended to be objective measures of the performance of alternatives relative to goals for each affected resource being evaluated in the LTEMP EIS” (Runge and others, 2015). Comparisons of the performance of those metrics, among other considerations, ultimately led to selection of Alternative D as the preferred alternative. The performance metrics developed by Runge and others (2015), while suitable for comparing draft alternatives, were not designed nor intended to measure resource outcomes based on empirical observations of resource condition following implementation of the LTEMP. In 2019, the DOI’s Assistant Secretary for Water and Science directed the Bureau of Reclamation Glen Canyon Dam Adaptive Management Program (GCDAMP) to identify a set of “metrics” for assessing how well the selected alternative was meeting the goals and objectives stated in the LTEMP (DOI, 2016b). In fiscal years 2021-2023, Reclamation coordinated with the U.S. Geological Survey (USGS) Grand Canyon Monitoring and Research Center (GCMRC) to work with GCDAMP stakeholders in developing a new set of performance metrics for tracking progress towards attaining the resource goals specified in the LTEMP, using the previous performance metrics as a starting point. [1] |
| -- |
-- |
-- |
|---|
|
|
