Difference between revisions of "2006 Physical Resources PEP"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
</tr> | </tr> | ||
</table> | </table> | ||
+ | |||
+ | [[Image:SandGrain.jpg]] | ||
<!-- | <!-- | ||
Line 65: | Line 67: | ||
River gage. Specific suggestions from the panel include: | River gage. Specific suggestions from the panel include: | ||
− | + | • Greater attention to prioritization of proposed activities and associated budgeted items. | |
− | budgeted items. | + | |
− | + | • The SOW does not identify what fraction of the budget is support for any experimental flows that might occur during the budget period. Does the budget reflect the anticipation of an experimental flow, or would supplementary funds be required for such an event? | |
− | experimental flows that might occur during the budget period. Does the | + | |
− | budget reflect the anticipation of an experimental flow, or would | + | • The level of effort and analysis provided seems to warrant a full-time effort by the project chief, rather than 75% of his time. |
− | supplementary funds be required for such an event? | + | |
− | + | • The scope and sophistication of sediment and water quality measurements have undergone dramatic increase during the past 3-5 years. Although the document clearly identifies the techniques, protocols, and schedules to be | |
− | effort by the project chief, rather than 75% of his time. | + | used, there is less sense of the place of the work plan in the long-term evolution of sediment and water quality monitoring. For example, which of the activities are baseline monitoring that would be expected to occur |
− | + | many years into the future, and which are relatively short-term measurements primarily to be used for model calibration and then discontinued? | |
− | have undergone dramatic increase during the past 3-5 years. Although the | + | |
− | document clearly identifies the techniques, protocols, and schedules to be | + | • The monitoring could be strengthened in two ways to reflect the scientific |
− | used, there is less sense of the place of the work plan in the long-term | + | |
− | evolution of sediment and water quality monitoring. For example, which | + | |
− | of the activities are baseline monitoring that would be expected to occur | + | |
− | many years into the future, and which are relatively short-term | + | |
− | measurements primarily to be used for model calibration and then | + | |
− | discontinued? | + | |
− | + | ||
findings of the past few years. Two important discoveries are that bed | findings of the past few years. Two important discoveries are that bed | ||
sediment size and tributary (mainly Paria) sediment inputs exert first-order | sediment size and tributary (mainly Paria) sediment inputs exert first-order | ||
Line 102: | Line 97: | ||
the panel recommends reducing work downstream of the Grand Canyon | the panel recommends reducing work downstream of the Grand Canyon | ||
gage. | gage. | ||
− | + | ||
+ | • Instrumentation issues: A USGS series report thoroughly documenting | ||
instrument calibration and development of time series of cross-sectionally | instrument calibration and development of time series of cross-sectionally | ||
averaged velocity weighted suspended sediment concentrations (silt/clay | averaged velocity weighted suspended sediment concentrations (silt/clay | ||
Line 118: | Line 114: | ||
should be provided. A subset of this report should be published in the peer | should be provided. A subset of this report should be published in the peer | ||
reviewed literature. If possible, validation should also be presented. | reviewed literature. If possible, validation should also be presented. | ||
− | + | ||
+ | • The project should consider the cost of maintaining redundant systems as | ||
calibration and intercomparisons of data measurement techniques become | calibration and intercomparisons of data measurement techniques become | ||
sufficient. The LISSTs appear to be the instrument that requires the most | sufficient. The LISSTs appear to be the instrument that requires the most | ||
Line 126: | Line 123: | ||
infinity which, although having a larger initial cost, will likely reduce | infinity which, although having a larger initial cost, will likely reduce | ||
long-term maintenance | long-term maintenance | ||
− | + | ||
+ | • The project should evaluate servicing frequency because several | ||
instrument malfunctions developed during the preceding six-month | instrument malfunctions developed during the preceding six-month | ||
servicing interval, necessitating difficult and inefficient return trips by foot. | servicing interval, necessitating difficult and inefficient return trips by foot. | ||
Perhaps a four-month servicing interval would actually save the project | Perhaps a four-month servicing interval would actually save the project | ||
money and allow for more efficient use of staff time. | money and allow for more efficient use of staff time. | ||
− | + | ||
+ | • When instruments are not operating, the shifting rating curves presented | ||
by Scott Wright appear to be a potential method to fill data gaps, and the | by Scott Wright appear to be a potential method to fill data gaps, and the | ||
project should continue to investigate this method. It is important that | project should continue to investigate this method. It is important that | ||
these data be appropriately flagged in the database, however, as being | these data be appropriately flagged in the database, however, as being | ||
estimated. | estimated. | ||
− | + | ||
+ | • Does the proposed SOW include funding to WRD to maintain and develop | ||
the water discharge side of the data? | the water discharge side of the data? | ||
+ | |||
• Although Topping’s approach to characterizing the tributaries is the least | • Although Topping’s approach to characterizing the tributaries is the least | ||
expensive approach available, the accuracy of the siphon samplers is | expensive approach available, the accuracy of the siphon samplers is | ||
uncertain. | uncertain. | ||
+ | |||
• The techniques developed and used in the Grand Canyon to monitor | • The techniques developed and used in the Grand Canyon to monitor | ||
suspended sediments should be fully developed and tested in other | suspended sediments should be fully developed and tested in other | ||
Line 148: | Line 150: | ||
research-oriented techniques. This could be important in any court | research-oriented techniques. This could be important in any court | ||
challenges to the scientific data produced. | challenges to the scientific data produced. | ||
+ | |||
• The management information needs are for monthly data, but continuous | • The management information needs are for monthly data, but continuous | ||
data are still needed because of the ephemeral nature of flows, especially | data are still needed because of the ephemeral nature of flows, especially | ||
from tributaries, and the daily variation of discharge. | from tributaries, and the daily variation of discharge. | ||
+ | |||
• Data reports: Given that the water-quality data collection is evolving from | • Data reports: Given that the water-quality data collection is evolving from | ||
a research activity to a monitoring activity, an annual USGS open-file | a research activity to a monitoring activity, an annual USGS open-file | ||
report summarizing suspended-sediment concentration data should be | report summarizing suspended-sediment concentration data should be | ||
written or the data should be included in Arizona’s Annual Data Report. | written or the data should be included in Arizona’s Annual Data Report. | ||
+ | |||
• Error estimates: The project personnel are commended for their | • Error estimates: The project personnel are commended for their | ||
recognition and concern for the errors associated with the field | recognition and concern for the errors associated with the field | ||
Line 164: | Line 169: | ||
long-term errors be consulted, and that a better representation of the | long-term errors be consulted, and that a better representation of the | ||
prediction errors be determined. | prediction errors be determined. | ||
− | + | ||
− | + | ===Modeling support linked to integrated quality-of-water core monitoring (Wright and others)=== | |
− | and others) | + | |
The goals of the modeling effort, as outlined in the statement of work, are | The goals of the modeling effort, as outlined in the statement of work, are | ||
appropriate and reasonable. The statement of work appears to place the modeling | appropriate and reasonable. The statement of work appears to place the modeling | ||
Line 180: | Line 185: | ||
Participation of Scott Wright in both programs is regarded as a positive step in this | Participation of Scott Wright in both programs is regarded as a positive step in this | ||
direction. | direction. | ||
− | Additional specific comments from the panel (see Appendix 3 for written suggestions or | + | |
− | recommendations provided by scientists) | + | ===Additional specific comments from the panel (see Appendix 3 for written suggestions or recommendations provided by scientists)=== |
+ | |||
• The statement that the model will be used to fill data gaps where instrument | • The statement that the model will be used to fill data gaps where instrument | ||
problems have occurred must be implemented carefully. Model simulations are | problems have occurred must be implemented carefully. Model simulations are | ||
not observed data and need to be clearly identified and represented as simulations. | not observed data and need to be clearly identified and represented as simulations. | ||
+ | |||
• The 1-d temperature model seems appropriate, but the combination of separate | • The 1-d temperature model seems appropriate, but the combination of separate | ||
FORTRAN codes that must be operated in sequence is awkward. Hopefully the | FORTRAN codes that must be operated in sequence is awkward. Hopefully the | ||
interface will automate and hide all of this from the operational user. | interface will automate and hide all of this from the operational user. | ||
+ | |||
• Although the integration of tributary sediment input into the Colorado River | • Although the integration of tributary sediment input into the Colorado River | ||
sediment transport model is important, the panel is not convinced that the | sediment transport model is important, the panel is not convinced that the | ||
Colorado River model is currently adequate. Also, the budget for the proposed | Colorado River model is currently adequate. Also, the budget for the proposed | ||
integration seems low, irrespective of the adequacy of the mainstem model. | integration seems low, irrespective of the adequacy of the mainstem model. | ||
+ | |||
• It is unfortunate that the proposal does not address improvements to the current | • It is unfortunate that the proposal does not address improvements to the current | ||
mainstem model. Presentations during the PEP by Peter Wilcock clearly showed | mainstem model. Presentations during the PEP by Peter Wilcock clearly showed | ||
Line 200: | Line 209: | ||
is needed to parameterize the eddy contributions to sediment management in the | is needed to parameterize the eddy contributions to sediment management in the | ||
model. | model. | ||
+ | |||
• A long-term sediment transport model is desperately needed to demonstrate to | • A long-term sediment transport model is desperately needed to demonstrate to | ||
stakeholders the potential results of various operational scenarios. This capability | stakeholders the potential results of various operational scenarios. This capability | ||
Line 208: | Line 218: | ||
condition of the model. The panel recommends that the current one-dimensional | condition of the model. The panel recommends that the current one-dimensional | ||
Colorado River model be critically reviewed by a small group that will be tasked | Colorado River model be critically reviewed by a small group that will be tasked | ||
− | |||
with making recommendations to guide further development or re-development of | with making recommendations to guide further development or re-development of | ||
the model. | the model. | ||
+ | |||
• No detailed statements of work corresponding to that provided for the Topping et | • No detailed statements of work corresponding to that provided for the Topping et | ||
al. effort detail the efforts of Rubin and Wright. | al. effort detail the efforts of Rubin and Wright. | ||
+ | |||
• Although the document covers the new near-shore temperature monitoring (and | • Although the document covers the new near-shore temperature monitoring (and | ||
modeling?) effort, it is not clear who will be responsible for this program. | modeling?) effort, it is not clear who will be responsible for this program. | ||
+ | |||
• The largest single line item in the budget is “Outside USGS Contract Science | • The largest single line item in the budget is “Outside USGS Contract Science | ||
Labor (17% Burden Rate)” at $325K, but the dispersal of these funds is largely | Labor (17% Burden Rate)” at $325K, but the dispersal of these funds is largely | ||
Line 221: | Line 233: | ||
Effectiveness of current or proposed sediment core monitoring in meeting identified core | Effectiveness of current or proposed sediment core monitoring in meeting identified core | ||
information needs and answering strategic science questions | information needs and answering strategic science questions | ||
+ | |||
Need for a comprehensive structured approach. At the most fundamental level, | Need for a comprehensive structured approach. At the most fundamental level, | ||
the panel notes the lack of a comprehensive structured approach that can be used to | the panel notes the lack of a comprehensive structured approach that can be used to | ||
Line 229: | Line 242: | ||
model remains an envisioned endpoint of the GCMRC activities, because such a model | model remains an envisioned endpoint of the GCMRC activities, because such a model | ||
was not used as a framework to guide discussion of physical science research projects. | was not used as a framework to guide discussion of physical science research projects. | ||
− | + | ||
+ | As an example of the questions that arise in the absence of a structured approach, | ||
the panel remains uncertain how the efforts to model fine sediment dynamics (Steve | the panel remains uncertain how the efforts to model fine sediment dynamics (Steve | ||
Wiele and others) integrate with the efforts to model coarse sediment dynamics (Robert | Wiele and others) integrate with the efforts to model coarse sediment dynamics (Robert | ||
Line 239: | Line 253: | ||
framework on which all program scientists agree. A comprehensive structured approach | framework on which all program scientists agree. A comprehensive structured approach | ||
would improve program effectiveness by allowing (i) identification of gaps in existing | would improve program effectiveness by allowing (i) identification of gaps in existing | ||
− | monitoring and research efforts, (ii) identification of gaps in the current state-of- | + | monitoring and research efforts, (ii) identification of gaps in the current state-of-the knowledge |
of the overall system, (iii) evaluation of whether the balance among the effort | of the overall system, (iii) evaluation of whether the balance among the effort | ||
distribution in monitoring, applied studies, and modeling is appropriate, (iv) evaluation of | distribution in monitoring, applied studies, and modeling is appropriate, (iv) evaluation of | ||
Line 251: | Line 265: | ||
adaptive management cycle of experimentation, monitoring, evaluation, and | adaptive management cycle of experimentation, monitoring, evaluation, and | ||
implementation. | implementation. | ||
− | + | ||
− | Fine sediment modeling | + | ===Fine sediment modeling=== |
+ | |||
+ | The panel believes that more effective communication is | ||
required between scientists involved primarily in modeling (Steve Wiele and others) and | required between scientists involved primarily in modeling (Steve Wiele and others) and | ||
scientists focusing on data collection and analysis. Modeling must be a component of the | scientists focusing on data collection and analysis. Modeling must be a component of the | ||
Line 262: | Line 278: | ||
Topping and Steve Wiele reduces the effectiveness of the GCMRC physical resources | Topping and Steve Wiele reduces the effectiveness of the GCMRC physical resources | ||
program. | program. | ||
+ | |||
Scientists engaged in data collection and analysis should help guide model | Scientists engaged in data collection and analysis should help guide model | ||
development by prioritizing the critical questions to be addressed in simulations, as well | development by prioritizing the critical questions to be addressed in simulations, as well | ||
Line 289: | Line 306: | ||
at the stage of preliminary testing. Proposed calibration of the model using existing 2007 | at the stage of preliminary testing. Proposed calibration of the model using existing 2007 | ||
funds will presumably lead to future improvements. | funds will presumably lead to future improvements. | ||
+ | |||
The panel believes that the fine sediment model needs to have the capability to (i) | The panel believes that the fine sediment model needs to have the capability to (i) | ||
simulate a range of flow scenarios, (ii) account for eddy storage dynamics to at least a | simulate a range of flow scenarios, (ii) account for eddy storage dynamics to at least a | ||
Line 294: | Line 312: | ||
model needs to provide first-order estimates of the effects of different management | model needs to provide first-order estimates of the effects of different management | ||
scenarios, although in order to do this it may be necessary to run 2d or 3d models of | scenarios, although in order to do this it may be necessary to run 2d or 3d models of | ||
− | |||
specific processes such as eddy dynamics, for which field-based hydraulic measurements | specific processes such as eddy dynamics, for which field-based hydraulic measurements | ||
will be needed. The initial, one-dimensional theoretical model without calibration has | will be needed. The initial, one-dimensional theoretical model without calibration has | ||
Line 318: | Line 335: | ||
a two-stage approach of using Wiele’s 2+d model to calibrate the one-dimensional model. | a two-stage approach of using Wiele’s 2+d model to calibrate the one-dimensional model. | ||
The FIST reaches do not appear to have been utilized in this way. | The FIST reaches do not appear to have been utilized in this way. | ||
+ | |||
A weakness of the present modeling efforts resides in the lack of quality control | A weakness of the present modeling efforts resides in the lack of quality control | ||
of the model and its solution. There are recommended practices that should be followed | of the model and its solution. There are recommended practices that should be followed | ||
Line 339: | Line 357: | ||
LISST and multifrequency acoustics. The LISST appears to provide valuable data, but | LISST and multifrequency acoustics. The LISST appears to provide valuable data, but | ||
requires an extraordinary amount of maintenance. Is the added value worth the cost? | requires an extraordinary amount of maintenance. Is the added value worth the cost? | ||
− | |||
Could the system be monitored to an acceptable level with only multifrequency | Could the system be monitored to an acceptable level with only multifrequency | ||
acoustics? If the LISST is needed, it is likely that the initial cost of installing LISST | acoustics? If the LISST is needed, it is likely that the initial cost of installing LISST | ||
Line 350: | Line 367: | ||
sampling at the Paria, LCR (Little Colorado River), and Diamond Creek, with 20% | sampling at the Paria, LCR (Little Colorado River), and Diamond Creek, with 20% | ||
accuracy in the associated rating curve.) | accuracy in the associated rating curve.) | ||
− | Core monitoring and analysis | + | |
+ | ===Core monitoring and analysis=== | ||
+ | |||
+ | Monitoring, applied studies, and modeling form | ||
the three basic components of the physical resources program of GCMRC. Monitoring | the three basic components of the physical resources program of GCMRC. Monitoring | ||
activities feed directly into the identified CMIN (core monitoring information needs), | activities feed directly into the identified CMIN (core monitoring information needs), | ||
Line 368: | Line 388: | ||
also demonstrated the existence of “hot spots” where most of the change in sediment | also demonstrated the existence of “hot spots” where most of the change in sediment | ||
storage occurs. | storage occurs. | ||
+ | |||
Because experimental flows remain critical to achieving understanding of the | Because experimental flows remain critical to achieving understanding of the | ||
Colorado River ecosystem, these flows must continue. One of the largest constraints on | Colorado River ecosystem, these flows must continue. One of the largest constraints on | ||
Line 382: | Line 403: | ||
is the heart of the adaptive management process. The lack of a model to show potential | is the heart of the adaptive management process. The lack of a model to show potential | ||
results may be hindering the project from moving forward. | results may be hindering the project from moving forward. | ||
− | + | ||
− | Sediment monitoring strategies | + | ===Sediment monitoring strategies=== |
+ | |||
+ | Lacking specific metrics to guide monitoring, at | ||
least three complementary but potentially redundant approaches exist with respect to | least three complementary but potentially redundant approaches exist with respect to | ||
sediment monitoring in the Colorado River ecosystem. The first approach is to detect the | sediment monitoring in the Colorado River ecosystem. The first approach is to detect the | ||
Line 412: | Line 435: | ||
to date, although it remains unclear whether bed sediment size is causal or correlative | to date, although it remains unclear whether bed sediment size is causal or correlative | ||
with supply and transport history. | with supply and transport history. | ||
+ | |||
The third approach for monitoring sediment is to continue a full FIST approach to | The third approach for monitoring sediment is to continue a full FIST approach to | ||
identify changes in the spatial distribution of sediment on the bank and bars in long | identify changes in the spatial distribution of sediment on the bank and bars in long | ||
Line 426: | Line 450: | ||
integrated work plan. Until the final results of the remote sensing data are completed, its | integrated work plan. Until the final results of the remote sensing data are completed, its | ||
usefulness compared with cost cannot be determined. There is always value in long-term | usefulness compared with cost cannot be determined. There is always value in long-term | ||
− | |||
data sets and for this reason the repeated ground surveys of the NAU sites should be | data sets and for this reason the repeated ground surveys of the NAU sites should be | ||
continued. Based on the results of the remote-sensing data, it may be beneficial to reduce | continued. Based on the results of the remote-sensing data, it may be beneficial to reduce | ||
Line 432: | Line 455: | ||
data. This determination will have to be made by the project staff once the processing and | data. This determination will have to be made by the project staff once the processing and | ||
analysis of the remote sensing data are complete. | analysis of the remote sensing data are complete. | ||
+ | |||
It will be the task of managers, as guided by recommendations from program | It will be the task of managers, as guided by recommendations from program | ||
scientists and peer reviewers, to choose among the alternate approaches for sediment | scientists and peer reviewers, to choose among the alternate approaches for sediment | ||
Line 440: | Line 464: | ||
sufficient period of time to allow the scientists to analyze their data in order to recoup the | sufficient period of time to allow the scientists to analyze their data in order to recoup the | ||
GCMRC’s existing investment. | GCMRC’s existing investment. | ||
− | Potential for integration of sediment core monitoring protocols with other related | + | |
− | program activities and objectives | + | ===Potential for integration of sediment core monitoring protocols with other related program activities and objectives=== |
− | + | ||
+ | The degree of integration among the three core programs of the GCMRC has | ||
improved since 1999, but the programs are not yet effectively integrated. The panel | improved since 1999, but the programs are not yet effectively integrated. The panel | ||
recommends the following actions as means to foster integration among the programs: | recommends the following actions as means to foster integration among the programs: | ||
+ | |||
• Establish common frames of reference that facilitate discussion of effects of | • Establish common frames of reference that facilitate discussion of effects of | ||
changing flow and sediment regimes among scientists in the three programs. | changing flow and sediment regimes among scientists in the three programs. | ||
Line 452: | Line 478: | ||
are of particular concern to the biological and sociocultural programs, | are of particular concern to the biological and sociocultural programs, | ||
respectively. | respectively. | ||
+ | |||
• Evaluate trade-offs among different resources as a function of differing flow | • Evaluate trade-offs among different resources as a function of differing flow | ||
regimes. For example, how does a specific flow scenario affect survival of | regimes. For example, how does a specific flow scenario affect survival of | ||
Line 461: | Line 488: | ||
multiple objectives articulated by stakeholders in the adaptive management | multiple objectives articulated by stakeholders in the adaptive management | ||
process. | process. | ||
+ | |||
• Identification by scientists in other programs of physical parameters which are | • Identification by scientists in other programs of physical parameters which are | ||
central to their understanding of the river ecosystem. Scientists in the physical | central to their understanding of the river ecosystem. Scientists in the physical | ||
Line 469: | Line 497: | ||
useful to scientists in other programs. What level of detail do biologists want for | useful to scientists in other programs. What level of detail do biologists want for | ||
quantifying aquatic and riparian habitat, for example, with respect to area, volume, | quantifying aquatic and riparian habitat, for example, with respect to area, volume, | ||
− | |||
or substrate type? What other types of measurements (e.g. water temperature, | or substrate type? What other types of measurements (e.g. water temperature, | ||
dissolved oxygen) could be emplaced at existing flow and sediment measurement | dissolved oxygen) could be emplaced at existing flow and sediment measurement | ||
sites that would be useful to biologists? | sites that would be useful to biologists? | ||
+ | |||
• Joint annual research symposia and river trips by scientists in the three core | • Joint annual research symposia and river trips by scientists in the three core | ||
monitoring and research programs that are organized specifically to identify | monitoring and research programs that are organized specifically to identify | ||
Line 479: | Line 507: | ||
should ultimately facilitate use of an ecosystem-level adaptive management | should ultimately facilitate use of an ecosystem-level adaptive management | ||
model. | model. | ||
+ | |||
• As noted earlier in this report, many of the 1999 recommendations of the PEP | • As noted earlier in this report, many of the 1999 recommendations of the PEP | ||
SEDS panel have been implemented by the GCMRC staff and scientists. It is not | SEDS panel have been implemented by the GCMRC staff and scientists. It is not | ||
Line 489: | Line 518: | ||
many of the objectives of both the biological and sociocultural programs, albeit | many of the objectives of both the biological and sociocultural programs, albeit | ||
on different time scales. | on different time scales. | ||
− | Responses to specific questions and recommendations from scientists in the physical | + | |
− | resources program | + | ===Responses to specific questions and recommendations from scientists in the physical resources program=== |
+ | |||
• The FIST data would need to be fully evaluated in relation to the mass balance | • The FIST data would need to be fully evaluated in relation to the mass balance | ||
and NAU data before the panel could recommend continuation of one versus the | and NAU data before the panel could recommend continuation of one versus the | ||
Line 503: | Line 533: | ||
group collected the type of data intended, but these data have not been utilized by | group collected the type of data intended, but these data have not been utilized by | ||
modelers. | modelers. | ||
+ | |||
• At this point, the panel does not consider it necessary to add further monitoring | • At this point, the panel does not consider it necessary to add further monitoring | ||
sites downstream from Phantom Ranch, but this may need to be revisited | sites downstream from Phantom Ranch, but this may need to be revisited | ||
(presumably by stakeholders) in the future. | (presumably by stakeholders) in the future. | ||
+ | |||
• The fact that much remains to be learned about where bars will be built or | • The fact that much remains to be learned about where bars will be built or | ||
reduced as a function of flow magnitude, duration, and timing with respect to | reduced as a function of flow magnitude, duration, and timing with respect to | ||
Line 512: | Line 544: | ||
panel endorses the goal of reducing error in the sediment mass balance by | panel endorses the goal of reducing error in the sediment mass balance by | ||
obtaining better data (particularly high flow data) from the Paria River. | obtaining better data (particularly high flow data) from the Paria River. | ||
+ | |||
• Work to date on LiDAR is very impressive and is useful for monitoring changes | • Work to date on LiDAR is very impressive and is useful for monitoring changes | ||
in beach area and vegetation cover. The panel recommends continued use of | in beach area and vegetation cover. The panel recommends continued use of | ||
− | |||
LiDAR, although this may not be necessary every year or with continuous | LiDAR, although this may not be necessary every year or with continuous | ||
coverage of the Colorado River ecosystem. LiDAR surveys should be carefully | coverage of the Colorado River ecosystem. LiDAR surveys should be carefully | ||
Line 527: | Line 559: | ||
project scientists consider using the Kruskal-Wallis rank test or a similar | project scientists consider using the Kruskal-Wallis rank test or a similar | ||
statistical test to address this question. | statistical test to address this question. | ||
+ | |||
• Topping and Rubin have already done a tremendous amount of work, but the | • Topping and Rubin have already done a tremendous amount of work, but the | ||
panel questions their ability to make substantial additional progress without more | panel questions their ability to make substantial additional progress without more | ||
Line 535: | Line 568: | ||
modeling is a good start at tying these different data sets together, but work is | modeling is a good start at tying these different data sets together, but work is | ||
needed on model calibration rather than on further model development. | needed on model calibration rather than on further model development. | ||
+ | |||
• The panel recommends that Topping and other physical resources program | • The panel recommends that Topping and other physical resources program | ||
scientists consult with experts on error and uncertainty, such as Tim Cohen of the | scientists consult with experts on error and uncertainty, such as Tim Cohen of the | ||
U.S. Geological Survey, Office of Surface Water, in Reston, Virginia. | U.S. Geological Survey, Office of Surface Water, in Reston, Virginia. | ||
+ | |||
• The panel recommends careful consideration of cost-benefit ratios for all | • The panel recommends careful consideration of cost-benefit ratios for all | ||
monitoring and analysis techniques used in the physical resources program. | monitoring and analysis techniques used in the physical resources program. | ||
+ | |||
• The panel and GCMRC need a better-coordinated scheme for identifying the type | • The panel and GCMRC need a better-coordinated scheme for identifying the type | ||
of information now critical to modeling efforts in order to prioritize funding for | of information now critical to modeling efforts in order to prioritize funding for | ||
continued monitoring and research efforts versus new directions. | continued monitoring and research efforts versus new directions. | ||
+ | |||
• The qualities of “sustainable” or “attainable” conditions in resources need to be | • The qualities of “sustainable” or “attainable” conditions in resources need to be | ||
more precisely defined to guide monitoring. | more precisely defined to guide monitoring. | ||
+ | |||
• The panel feels that David Topping plays an essential role in this program. He | • The panel feels that David Topping plays an essential role in this program. He | ||
does very high quality work and has many skills that cannot be replicated by other | does very high quality work and has many skills that cannot be replicated by other |
Latest revision as of 10:26, 21 November 2018
|