Difference between revisions of "GCDAMP Budget"

From Glen Canyon Dam AMP
Jump to: navigation, search
Line 53: Line 53:
 
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"|
 
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"|
 
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;"
 
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;"
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY18-20 GCMRC Triennial Budget and Workplan]] </h2>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;"> [http://gcdamp.com/index.php?title=FY18-20_GCMRC_Triennial_Budget_and_Workplan FY18-20 GCMRC Triennial Budget and Workplan] </h2>
 
|-
 
|-
 
|style="color:#000;"|
 
|style="color:#000;"|

Revision as of 11:24, 31 January 2017


MonopolyMan.jpg

The goal of the Triennial Budget and Workplan (TWP) is to reduce the effort expended on the budget process while improving the effectiveness of the Grand Canyon Monitoring and Research Center (GCMRC), Technical Work Group (TWG), and AMWG. The GCDAMP will develop a TWP the first year of the process. Then, in the second year the GCDAMP would implement the year-two budget and make relatively minor corrections primarily related to changes in CPI and needs at GCMRC and the Bureau of Reclamation. In the third year the GCDAMP would consider minor changes to the year three budget to allow for changes in projects or potential important new starts not envisioned during the development of the triennial budget.

The major components of the TWP would include:

  • Three-year budget spreadsheets, work plans, and hydrographs,
  • Modifications of the year-three budget based on specific criteria,
  • Fiscal reporting, including expenditures for the previous fiscal year (mid-year and end end-of year reports),
  • Project progress reports, including an annual reporting meeting in January, and
  • Utilization of the Budget Ad Hoc Group (BAHG) to interface with Reclamation and GCMRC in developing a draft TWP, and to help the TWG develop budget recommendations for AMWG consideration.
GCDAMP Strategic Plan
The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions.
Strategic Science Plan
The GCMRC Strategic Science Plan (SSP) identifies general strategies for the next 5 years to provide science information responsive to the goals, management objectives, and priority questions as described in the AMPSP and other planning direction approved by the AMWG.
Core Monitoring Plan
The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources.
Monitoring and Research Plan
The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next 5 years to address some of the strategic science questions associated with AMWG priority questions.
Triennial Work Plan (TWP)
The GCMRC Triennial Work Plan (TWP) identifies the scope, objectives, and budget for monitoring and research activities planned for a 3-year period. When completed, the triennial work plan will be consistent with the MRP.


FY18-20 GCMRC Triennial Budget and Workplan


FY15-17 GCMRC Triennial Budget and Workplan


FY12-14 GCMRC Biannual Budget and Workplan




Links


Foundational Memos and Documents


Science Questions and Information Needs


Papers and Presentation

2014

2013

2012

2011

Other Stuff

  • Experimental fund: Monitoring and Research Plan page 8: In 2003, the GCDAMP established a fund to pay for experimental research projects so that they can be conducted without financially impacting other aspects of the science program. The current balance of the experimental fund at the end of the FY2007 is anticipated to be approximately $900,000. An additional $500,000 will be set aside by the GCMRC annually in an account at Reclamation to fund the BHBF tests and other research related to experimental efforts.1 Deposits to the experimental account will cease when the balance reaches $2.5 million.