Difference between revisions of "GCDAMP- HFE 2016"

From Glen Canyon Dam AMP
Jump to: navigation, search
Line 21: Line 21:
 
*Bypass tube capacity = '''15,000 cfs'''  
 
*Bypass tube capacity = '''15,000 cfs'''  
 
*Estimated acre feet of water bypassed during HFE:  '''125 kaf'''
 
*Estimated acre feet of water bypassed during HFE:  '''125 kaf'''
*November volume = '''649 kaf'''
+
*November volume = '''745 kaf'''
*Hourly Releases before and after HFE:  fluctuate between '''5,000 to 8,000 cfs'''
+
*Hourly Releases before and after HFE:  fluctuate between '''6,000 to 9,000 cfs'''
*Estimated costs to hydropower:  '''TBD'''
+
*Estimated costs to hydropower:  '''$1.4 million'''
 
*Actual costs to hydropower:  '''TBD'''
 
*Actual costs to hydropower:  '''TBD'''
 
*Direct expenses for removal of concession assets:  '''TBD'''
 
*Direct expenses for removal of concession assets:  '''TBD'''

Revision as of 15:18, 18 October 2016

SUMMARY

High Flow Experiment- 2016
CRC 121119 0038.JPG
  • Sediment in the system: TBD
  • Peak CFS: 35,100 cfs
  • Powerplant capacity = 20,100 cfs
  • Units available: 6
  • Bypass tube capacity = 15,000 cfs
  • Estimated acre feet of water bypassed during HFE: 125 kaf
  • November volume = 745 kaf
  • Hourly Releases before and after HFE: fluctuate between 6,000 to 9,000 cfs
  • Estimated costs to hydropower: $1.4 million
  • Actual costs to hydropower: TBD
  • Direct expenses for removal of concession assets: TBD
  • Start Upramp: TBD
  • Finish HFE: TBD
  • Total HFE duration: 96 hrs
  • HFE 2016 represents the 4th controlled high flow release conducted under the HFE Protocol.