Difference between revisions of "GCDAMP ADMINISTRATION"

From Glen Canyon Dam AMP
Jump to: navigation, search
Line 2: Line 2:
  
 
=='''Glen Canyon Dam Adaptive Management Program (GCDAMP)'''==
 
=='''Glen Canyon Dam Adaptive Management Program (GCDAMP)'''==
<p><font size='+0'>The Secretary of the Interior Bruce Babbitt, created the [http://www.usbr.gov/uc/rm/amp/index.html '''Glen Canyon Dam Adaptive Management Program (GCDAMP)'''] in response to the [http://www.usbr.gov/uc/envdocs/eis/gc/gcdOpsFEIS.html '''1995 Environmental Impact Statement on the Operations of Glen Canyon Dam.''']  The GCDAMP is responsible for implementation of the [[Grand Canyon Protection Act| '''Grand Canyon Protection Act of 1992''']], to monitor the operation of Glen Canyon Dam, to ensure the dam is operated in compliance with a range of laws and regulations regarding the operation of [https://www.usbr.gov/uc/rm/crsp/index.html '''the Colorado River Basin Project'''], and mitigate any significant environmental impacts.  This program is considered to be one of the most successful examples of adaptive management in the country. <br> <br>
+
Due to the significant levels of uncertainty surrounding the resources of the Colorado River ecosystem and the effects of dam operations on those resources, the Glen Canyon Dam Environmental Impact Statement stipulated an adaptive management approach. This approach allows for scientific experimentation that adds to the knowledge base of effects of the operation of Glen Canyon Dam, primarily on downstream resources, and results in the development of recommendations to the Secretary of the Interior regarding additional operational changes. The adaptive management approach being taken to manage Glen Canyon Dam operations and the resources affected by dam operations is as follows:
 +
*The Adaptive Management Program focus is on the Colorado River ecosystem;
 +
*Models are developed to reveal the potential effects of policies, activities, or practices that are being considered for implementation;
 +
*Questions are formulated as testable hypotheses regarding the expected responses or linkages of the Colorado River ecosystem to dam operations and other management actions;
 +
*Questions are formulated as testable hypotheses;
 +
*Experiments are conducted to test hypotheses and answer questions;
 +
*Management activities reveal, through monitoring and evaluation of results, the accuracy or completeness of the earlier predictions; and
 +
*New knowledge and information produced through experimentation are incorporated into management discussions and recommendations to the Secretary of the Interior. [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf]
  
 +
The Secretary of the Interior Bruce Babbitt, created the [http://www.usbr.gov/uc/rm/amp/index.html '''Glen Canyon Dam Adaptive Management Program (GCDAMP)'''] in response to the [http://www.usbr.gov/uc/envdocs/eis/gc/gcdOpsFEIS.html '''1995 Environmental Impact Statement on the Operations of Glen Canyon Dam.''']  The GCDAMP is responsible for implementation of the [[Grand Canyon Protection Act| '''Grand Canyon Protection Act of 1992''']], to monitor the operation of Glen Canyon Dam, to ensure the dam is operated in compliance with a range of laws and regulations regarding the operation of [https://www.usbr.gov/uc/rm/crsp/index.html '''the Colorado River Basin Project'''], and mitigate any significant environmental impacts.  This program is considered to be one of the most successful examples of adaptive management in the country.
  
The GCDAMP is comprised of a variety of [http://gcdamp.com/index.php?title=GCDAMP_Stakeholders_List '''stakeholders'''] with disparate interests in the resource. They range from federal and state agencies, Native American Indian Tribes, the Colorado River Basin States, electrical utility consortia, recreational groups, and environmental groups. The [http://gcdamp.com/index.php?title=Adaptive_Management_Work_Group_(AMWG) '''Adaptive Management Work Group (AMWG)'''] strives for balance and consensus on how to protect downstream resources in their recommendations to the Secretary on the operation of the dam. <br> <br>
+
=='''What is Adaptive Management? '''==
 +
Adaptive management has gained widespread acceptance in resource management since Holling (1978) developed the concept. Lee (1993:9) defines adaptive management with a simple imperative: “policies are experiments; learn from them.” Other characteristics (as described by Nyberg 1998; Walters 1986; Taylor et al. 1997) include:
 +
*A focus on ecosystems;
 +
*Experimentation and manipulation of managed ecosystems;
 +
*A time scale based on the biological generation or longer;
 +
*Acknowledgement of uncertainty about what policy or practice is best for a particular management issue;
 +
*Careful implementation of a plan of action designed to reveal the critical knowledge;
 +
*Monitoring of key response indicators;
 +
*Analysis of outcomes in consideration of original objectives; and
 +
*Incorporation of results into future decisions. [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf]
  
 +
=='''Organizations and Positions Within the Glen Canyon Dam Adaptive Management Program'''==
 +
The GCDAMP is comprised of a variety of [http://gcdamp.com/index.php?title=GCDAMP_Stakeholders_List '''stakeholders'''] with disparate interests in the resource.  They range from federal and state agencies, Native American Indian Tribes, the Colorado River Basin States, electrical utility consortia, recreational groups, and environmental groups.  The [http://gcdamp.com/index.php?title=Adaptive_Management_Work_Group_(AMWG) '''Adaptive Management Work Group (AMWG)'''] strives for balance and consensus on how to protect downstream resources in their recommendations to the Secretary on the operation of the dam.
  
The [http://gcdamp.com/index.php?title=Technical_Work_Group_(TWG) '''Technical Work Group (TWG)'''] is comprised of technical representatives from each group represented by AMWG and performs tasks assigned by that group. Tasks include, developing criteria and standards for monitoring and research programs, providing periodic reviews and updates, developing resource management questions for the design of monitoring and research by the [http://www.gcmrc.gov/gcmrc.aspx '''Grand Canyon Monitoring and Research Center (GCMRC)'''] and providing information for preparing annual resource reports and other reports for the AMWG. GCMRC is dedicated to providing credible, objective scientific information to the GCDAMP through the TWG on the effects of operating Glen Canyon Dam and other management actions on the downstream resources of the Colorado River ecosystem. <br>
+
The [http://gcdamp.com/index.php?title=Technical_Work_Group_(TWG) '''Technical Work Group (TWG)'''] is comprised of technical representatives from each group represented by AMWG and performs tasks assigned by that group. Tasks include, developing criteria and standards for monitoring and research programs, providing periodic reviews and updates, developing resource management questions for the design of monitoring and research by the [http://www.gcmrc.gov/gcmrc.aspx '''Grand Canyon Monitoring and Research Center (GCMRC)'''] and providing information for preparing annual resource reports and other reports for the AMWG. GCMRC is dedicated to providing credible, objective scientific information to the GCDAMP through the TWG on the effects of operating Glen Canyon Dam and other management actions on the downstream resources of the Colorado River ecosystem.  
  
----
+
== '''Secretary of the Interior’s Designee''' ==
 +
The Secretary of the Interior’s Designee serves as the principal contact for the Glen Canyon Dam Adaptive Management Program and as the focal point for issues and decisions associated with the program. Responsibilities of the position include:
 +
*Chairs the Adaptive Management Work Group;
 +
*Ensures that the Department of the Interior complies with its obligations under the Grand Canyon Protection Act and Record of Decision for the Glen Canyon Dam Environmental Impact Statement;
 +
*Ensures that the Department of the Interior fulfills its trust responsibilities to American Indian tribes with interests or assets affected by the program; and
 +
*Reviews, modifies, accepts, or remands recommendations from the Adaptive Management Work Group in making decisions about any changes in dam operation and other management actions and forwards the approved recommendations to the Secretary of the Interior. [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf]
  
 
== [http://gcdamp.com/index.php?title=Adaptive_Management_Work_Group_(AMWG) '''Adaptive Management Work Group (AMWG)'''] ==
 
== [http://gcdamp.com/index.php?title=Adaptive_Management_Work_Group_(AMWG) '''Adaptive Management Work Group (AMWG)'''] ==
 +
The Adaptive Management Work Group is a Federal Advisory Committee that includes representatives from the stakeholder tribes, organizations, and institutions listed below. The Secretary of the Interior appoints the Adaptive Management Work Group members. Responsibilities of the Adaptive Management Work Group as delineated in the Glen Canyon Dam Environmental Impact Statement (Reclamation 1995:36) are:
 +
*Provides the framework for Glen Canyon Dam Adaptive Management Program policy, goals, direction, and priorities;
 +
*Develops recommendations to the Secretary of the Interior for modifying operating criteria and other resource management actions, policies, or procedures;
 +
*Facilitates coordination and input from interested parties;
 +
*Reviews and forwards the annual report to the Secretary of the Interior and his/her designee on current and projected year operations;
 +
*Reviews and forwards annual budget proposals; and
 +
*Ensures coordination of operating criteria changes in the Annual Operating Plan for Colorado River Reservoirs and other ongoing activities.
 +
 +
Note that “dam operations” refers to the operation of the power plant and other release structures, such as bypass structures, spillways, and, potentially, a temperature control device, among others. Their uses conform to applicable law. The Adaptive Management Work Group develops recommendations for all of the dam’s structures to further the purposes of the Grand Canyon Protection Act, the Glen Canyon Dam Environmental Impact Statement, and Record of Decision. This is done within the limits of the Record of Decision and through experimentation. Representatives from the following tribes, organizations, or interest groups are presently included in the Adaptive Management Work Group:
 +
*Arizona Department of Water Resources
 +
*Arizona Game and Fish Department
 +
*Bureau of Reclamation
 +
*Bureau of Indian Affairs
 +
*Colorado River Board of California
 +
*Colorado River Commission of Nevada
 +
*Colorado River Energy Distributors Association
 +
*Colorado Water Conservation Board
 +
*Grand Canyon River Guides
 +
*Grand Canyon Trust
 +
*Hopi Tribe
 +
*Hualapai Tribe
 +
*National Park Service
 +
*Navajo Nation
 +
*New Mexico State Engineer’s Office
 +
*Pueblo of Zuni
 +
*Southern Paiute Consortium
 +
*Southwest Rivers
 +
*Trout Unlimited
 +
*U.S. Fish and Wildlife Service
 +
*Utah Associated Municipal Power Systems
 +
*Utah Division of Water Resources
 +
*Western Area Power Administration
 +
*Wyoming Interstate Streams Engineer [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf]
  
 
== [http://gcdamp.com/index.php?title=Technical_Work_Group_(TWG) '''Technical Work Group (TWG)'''] ==
 
== [http://gcdamp.com/index.php?title=Technical_Work_Group_(TWG) '''Technical Work Group (TWG)'''] ==
 +
The Technical Work Group is comprised of technical representatives of Adaptive Management Work Group members and operates at the direction of the Adaptive Management Work Group. The Technical Work Group’s main function is to provide technical assistance to the Adaptive Management Work Group. Technical Work Group functions may include (Reclamation 1995:37):
 +
*Developing, with the Grand Canyon Monitoring and Research Center, criteria and standards for monitoring and research programs and providing periodic reviews and updates of these;
 +
*Developing, with the Grand Canyon Monitoring and Research Center, resource management questions (i.e., information needs);
 +
*Reviewing and commenting on the scientific studies conducted or proposed by the program;
 +
*Provide a forum for discussion by Technical Work Group members, external scientists, the public, and other interested persons;
 +
*Providing information as necessary for preparing annual resource reports and other reports as required by the Adaptive Management Work Group; and
 +
*Reviewing strategic plans, annual work plans, long-term and annual budgets, and other assignments from the Adaptive Management Work Group. [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf]
  
 
== [https://www.gcmrc.gov/ '''Grand Canyon Research and Monitoring Center (GCMRC)'''] ==
 
== [https://www.gcmrc.gov/ '''Grand Canyon Research and Monitoring Center (GCMRC)'''] ==
 +
The Grand Canyon Monitoring and Research Center was created to fulfill the mandate in the Grand Canyon Protection Act for the “establishment and implementation of a long-term monitoring and research program to ensure that Glen Canyon Dam is operated in a manner that protects the values for which the Grand Canyon National Park and the Glen Canyon National Recreation Area were created.” The Grand Canyon Monitoring and Research Center serves as
 +
the science center for the Glen Canyon Dam Adaptive Management Program. The Grand Canyon Monitoring and Research Center leads the monitoring and research of the Colorado River ecosystem and facilitates communication and information exchange between scientists and members of the Technical Work Group and Adaptive Management Work Group. Other functions of the Grand Canyon Monitoring and Research Center are:
 +
*Advocate quality, objective science, and the use of that science in the adaptive management decision process;
 +
*Provide scientific information about resources in the Colorado River ecosystem;
 +
*Support the Secretary of the Interior’s Designee and the Adaptive Management Work Group in a technical advisory role;
 +
*Develop research designs and proposals for implementing (by the Grand Canyon Monitoring and Research Center or its contractors) monitoring and research activities in support of information needs;
 +
*Coordinate review of the monitoring and research program with independent review panels;
 +
*Coordinate, prepare, and distribute technical reports and documentation for review and as final products;
 +
*Prepare and forward technical management recommendations and annual reports, as specified in Section 1804 of the Grand Canyon Protect Act, to the Technical Work Group;
 +
*Manage data collected as part of the Adaptive Management Program and serve as a repository for other information about the Colorado River ecosystem;
 +
*Administer research proposals through a competitive contract process, as appropriate;
 +
*Develop, with the Technical Work Group, criteria and standards for monitoring and research programs; and
 +
*Develop, with the Technical Work Group, resource management questions (i.e., information needs).
 +
*Produce the State of the Colorado River Ecosystem Report.
 +
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11oct20/Attach_06.pdf Memo from Dr. Jack Schmidt to the TWG Dated October 18, 2011, Subject: Thoughts about the GCDAMP and GCMRC's Role in That Program]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11oct20/Attach_06.pdf Memo from Dr. Jack Schmidt to the TWG Dated October 18, 2011, Subject: Thoughts about the GCDAMP and GCMRC's Role in That Program]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10nov15/Attach_12.xlsx Reports Tracking Update --> GCMRC Publications Fiscal Year 2010]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10nov15/Attach_12.xlsx Reports Tracking Update --> GCMRC Publications Fiscal Year 2010]
 +
 +
== [http://gcdamp.com/index.php?title=Science_Advisors '''Independent Review Panels'''] ==
 +
Independent Review Panels, as called for in the Glen Canyon Dam Environmental Impact Statement (Reclamation 1995:38), are comprised of qualified individuals not otherwise participating in the long-term monitoring and research studies. The panels include peer reviewers, science advisors, and protocol evaluation panels whose primary responsibility is to assess the quality of research, monitoring, or science being conducted by the Adaptive
 +
Management Program and to make recommendations to improve it. Responsibilities of the panels include:
 +
*Reviewing Glen Canyon Dam Adaptive Management Program monitoring and research programs and protocols;
 +
*Providing reports based on their review to the Grand Canyon Monitoring and Research Center, Technical Work Group, and Adaptive Management Work Group;
 +
*Making recommendations and providing advice to the Adaptive Management Work Group, Technical Work Group, and Grand Canyon Monitoring and Research Center regarding science activities;
 +
*Assessing proposed research plans and programs, technical reports and publications, and other program accomplishments; and
 +
*Conducting five-year reviews of Grand Canyon Monitoring and Research Center monitoring and research protocols.
  
 
== [http://gcdamp.com/index.php?title=Portal:GCDAMP_Documents '''GCDAMP Meetings'''] ==
 
== [http://gcdamp.com/index.php?title=Portal:GCDAMP_Documents '''GCDAMP Meetings'''] ==
Line 24: Line 112:
 
*[[GCDAMP- Meeting Minutes Page|  GCDAMP Meeting Minutes]]
 
*[[GCDAMP- Meeting Minutes Page|  GCDAMP Meeting Minutes]]
 
*[[Media:Report & Recom Memo 16dec09.pdf| AMWG Report and Recommendations Memo, December 2016. ]]
 
*[[Media:Report & Recom Memo 16dec09.pdf| AMWG Report and Recommendations Memo, December 2016. ]]
 
=='''Ground Rules for Meetings'''==
 
#  Arrive on time
 
#  Commit to full participation
 
#  Do homework before class begins
 
#  Keep your representatives informed
 
#  Take private meetings outside
 
#  Wait to be recognized
 
#  Show respect for others
 
#  Be concise
 
#  Stick to the topic
 
#  Save new business for the appointed time
 
#  Help keep the meeting on schedule
 

Revision as of 09:28, 9 May 2018

Main Page- WIKI PIC-III.jpg

Glen Canyon Dam Adaptive Management Program (GCDAMP)

Due to the significant levels of uncertainty surrounding the resources of the Colorado River ecosystem and the effects of dam operations on those resources, the Glen Canyon Dam Environmental Impact Statement stipulated an adaptive management approach. This approach allows for scientific experimentation that adds to the knowledge base of effects of the operation of Glen Canyon Dam, primarily on downstream resources, and results in the development of recommendations to the Secretary of the Interior regarding additional operational changes. The adaptive management approach being taken to manage Glen Canyon Dam operations and the resources affected by dam operations is as follows:

  • The Adaptive Management Program focus is on the Colorado River ecosystem;
  • Models are developed to reveal the potential effects of policies, activities, or practices that are being considered for implementation;
  • Questions are formulated as testable hypotheses regarding the expected responses or linkages of the Colorado River ecosystem to dam operations and other management actions;
  • Questions are formulated as testable hypotheses;
  • Experiments are conducted to test hypotheses and answer questions;
  • Management activities reveal, through monitoring and evaluation of results, the accuracy or completeness of the earlier predictions; and
  • New knowledge and information produced through experimentation are incorporated into management discussions and recommendations to the Secretary of the Interior. [1]

The Secretary of the Interior Bruce Babbitt, created the Glen Canyon Dam Adaptive Management Program (GCDAMP) in response to the 1995 Environmental Impact Statement on the Operations of Glen Canyon Dam. The GCDAMP is responsible for implementation of the Grand Canyon Protection Act of 1992, to monitor the operation of Glen Canyon Dam, to ensure the dam is operated in compliance with a range of laws and regulations regarding the operation of the Colorado River Basin Project, and mitigate any significant environmental impacts. This program is considered to be one of the most successful examples of adaptive management in the country.

What is Adaptive Management?

Adaptive management has gained widespread acceptance in resource management since Holling (1978) developed the concept. Lee (1993:9) defines adaptive management with a simple imperative: “policies are experiments; learn from them.” Other characteristics (as described by Nyberg 1998; Walters 1986; Taylor et al. 1997) include:

  • A focus on ecosystems;
  • Experimentation and manipulation of managed ecosystems;
  • A time scale based on the biological generation or longer;
  • Acknowledgement of uncertainty about what policy or practice is best for a particular management issue;
  • Careful implementation of a plan of action designed to reveal the critical knowledge;
  • Monitoring of key response indicators;
  • Analysis of outcomes in consideration of original objectives; and
  • Incorporation of results into future decisions. [2]

Organizations and Positions Within the Glen Canyon Dam Adaptive Management Program

The GCDAMP is comprised of a variety of stakeholders with disparate interests in the resource. They range from federal and state agencies, Native American Indian Tribes, the Colorado River Basin States, electrical utility consortia, recreational groups, and environmental groups. The Adaptive Management Work Group (AMWG) strives for balance and consensus on how to protect downstream resources in their recommendations to the Secretary on the operation of the dam.

The Technical Work Group (TWG) is comprised of technical representatives from each group represented by AMWG and performs tasks assigned by that group. Tasks include, developing criteria and standards for monitoring and research programs, providing periodic reviews and updates, developing resource management questions for the design of monitoring and research by the Grand Canyon Monitoring and Research Center (GCMRC) and providing information for preparing annual resource reports and other reports for the AMWG. GCMRC is dedicated to providing credible, objective scientific information to the GCDAMP through the TWG on the effects of operating Glen Canyon Dam and other management actions on the downstream resources of the Colorado River ecosystem.

Secretary of the Interior’s Designee

The Secretary of the Interior’s Designee serves as the principal contact for the Glen Canyon Dam Adaptive Management Program and as the focal point for issues and decisions associated with the program. Responsibilities of the position include:

  • Chairs the Adaptive Management Work Group;
  • Ensures that the Department of the Interior complies with its obligations under the Grand Canyon Protection Act and Record of Decision for the Glen Canyon Dam Environmental Impact Statement;
  • Ensures that the Department of the Interior fulfills its trust responsibilities to American Indian tribes with interests or assets affected by the program; and
  • Reviews, modifies, accepts, or remands recommendations from the Adaptive Management Work Group in making decisions about any changes in dam operation and other management actions and forwards the approved recommendations to the Secretary of the Interior. [3]

Adaptive Management Work Group (AMWG)

The Adaptive Management Work Group is a Federal Advisory Committee that includes representatives from the stakeholder tribes, organizations, and institutions listed below. The Secretary of the Interior appoints the Adaptive Management Work Group members. Responsibilities of the Adaptive Management Work Group as delineated in the Glen Canyon Dam Environmental Impact Statement (Reclamation 1995:36) are:

  • Provides the framework for Glen Canyon Dam Adaptive Management Program policy, goals, direction, and priorities;
  • Develops recommendations to the Secretary of the Interior for modifying operating criteria and other resource management actions, policies, or procedures;
  • Facilitates coordination and input from interested parties;
  • Reviews and forwards the annual report to the Secretary of the Interior and his/her designee on current and projected year operations;
  • Reviews and forwards annual budget proposals; and
  • Ensures coordination of operating criteria changes in the Annual Operating Plan for Colorado River Reservoirs and other ongoing activities.

Note that “dam operations” refers to the operation of the power plant and other release structures, such as bypass structures, spillways, and, potentially, a temperature control device, among others. Their uses conform to applicable law. The Adaptive Management Work Group develops recommendations for all of the dam’s structures to further the purposes of the Grand Canyon Protection Act, the Glen Canyon Dam Environmental Impact Statement, and Record of Decision. This is done within the limits of the Record of Decision and through experimentation. Representatives from the following tribes, organizations, or interest groups are presently included in the Adaptive Management Work Group:

  • Arizona Department of Water Resources
  • Arizona Game and Fish Department
  • Bureau of Reclamation
  • Bureau of Indian Affairs
  • Colorado River Board of California
  • Colorado River Commission of Nevada
  • Colorado River Energy Distributors Association
  • Colorado Water Conservation Board
  • Grand Canyon River Guides
  • Grand Canyon Trust
  • Hopi Tribe
  • Hualapai Tribe
  • National Park Service
  • Navajo Nation
  • New Mexico State Engineer’s Office
  • Pueblo of Zuni
  • Southern Paiute Consortium
  • Southwest Rivers
  • Trout Unlimited
  • U.S. Fish and Wildlife Service
  • Utah Associated Municipal Power Systems
  • Utah Division of Water Resources
  • Western Area Power Administration
  • Wyoming Interstate Streams Engineer [4]

Technical Work Group (TWG)

The Technical Work Group is comprised of technical representatives of Adaptive Management Work Group members and operates at the direction of the Adaptive Management Work Group. The Technical Work Group’s main function is to provide technical assistance to the Adaptive Management Work Group. Technical Work Group functions may include (Reclamation 1995:37):

  • Developing, with the Grand Canyon Monitoring and Research Center, criteria and standards for monitoring and research programs and providing periodic reviews and updates of these;
  • Developing, with the Grand Canyon Monitoring and Research Center, resource management questions (i.e., information needs);
  • Reviewing and commenting on the scientific studies conducted or proposed by the program;
  • Provide a forum for discussion by Technical Work Group members, external scientists, the public, and other interested persons;
  • Providing information as necessary for preparing annual resource reports and other reports as required by the Adaptive Management Work Group; and
  • Reviewing strategic plans, annual work plans, long-term and annual budgets, and other assignments from the Adaptive Management Work Group. [5]

Grand Canyon Research and Monitoring Center (GCMRC)

The Grand Canyon Monitoring and Research Center was created to fulfill the mandate in the Grand Canyon Protection Act for the “establishment and implementation of a long-term monitoring and research program to ensure that Glen Canyon Dam is operated in a manner that protects the values for which the Grand Canyon National Park and the Glen Canyon National Recreation Area were created.” The Grand Canyon Monitoring and Research Center serves as the science center for the Glen Canyon Dam Adaptive Management Program. The Grand Canyon Monitoring and Research Center leads the monitoring and research of the Colorado River ecosystem and facilitates communication and information exchange between scientists and members of the Technical Work Group and Adaptive Management Work Group. Other functions of the Grand Canyon Monitoring and Research Center are:

  • Advocate quality, objective science, and the use of that science in the adaptive management decision process;
  • Provide scientific information about resources in the Colorado River ecosystem;
  • Support the Secretary of the Interior’s Designee and the Adaptive Management Work Group in a technical advisory role;
  • Develop research designs and proposals for implementing (by the Grand Canyon Monitoring and Research Center or its contractors) monitoring and research activities in support of information needs;
  • Coordinate review of the monitoring and research program with independent review panels;
  • Coordinate, prepare, and distribute technical reports and documentation for review and as final products;
  • Prepare and forward technical management recommendations and annual reports, as specified in Section 1804 of the Grand Canyon Protect Act, to the Technical Work Group;
  • Manage data collected as part of the Adaptive Management Program and serve as a repository for other information about the Colorado River ecosystem;
  • Administer research proposals through a competitive contract process, as appropriate;
  • Develop, with the Technical Work Group, criteria and standards for monitoring and research programs; and
  • Develop, with the Technical Work Group, resource management questions (i.e., information needs).
  • Produce the State of the Colorado River Ecosystem Report.

Independent Review Panels

Independent Review Panels, as called for in the Glen Canyon Dam Environmental Impact Statement (Reclamation 1995:38), are comprised of qualified individuals not otherwise participating in the long-term monitoring and research studies. The panels include peer reviewers, science advisors, and protocol evaluation panels whose primary responsibility is to assess the quality of research, monitoring, or science being conducted by the Adaptive Management Program and to make recommendations to improve it. Responsibilities of the panels include:

  • Reviewing Glen Canyon Dam Adaptive Management Program monitoring and research programs and protocols;
  • Providing reports based on their review to the Grand Canyon Monitoring and Research Center, Technical Work Group, and Adaptive Management Work Group;
  • Making recommendations and providing advice to the Adaptive Management Work Group, Technical Work Group, and Grand Canyon Monitoring and Research Center regarding science activities;
  • Assessing proposed research plans and programs, technical reports and publications, and other program accomplishments; and
  • Conducting five-year reviews of Grand Canyon Monitoring and Research Center monitoring and research protocols.

GCDAMP Meetings