Difference between revisions of "Archived Glen Canyon Monthly Operations Call slides"
Cellsworth (Talk | contribs) (Created page with " __NOTOC__ __NOEDITSECTION__ <!-- ------------------------------Banner across top of page------------------------------> {| style="width:100%; background:#fcfcfc; margin-to...") |
Cellsworth (Talk | contribs) |
||
| Line 36: | Line 36: | ||
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | |class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | ||
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | {|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | ||
| − | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;"> | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;">The monthly Glen Canyon Operations call</h2> |
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
| + | This briefing is being provided consistent with the | ||
| + | provision in Section 1.1 of the LTEMP ROD which states: | ||
| + | “Annually, Reclamation will develop a hydrograph based on the characteristics | ||
| + | above. Reclamation will seek consensus on the annual hydrograph through | ||
| + | monthly operational coordination calls with governmental entities, and regular | ||
| + | meetings of the GCDAMP Technical Working Group (TWG) and AMWG. | ||
| + | |||
| + | Reclamation will conduct monthly Glen Canyon Dam operational coordination | ||
| + | meetings or calls with the DOI bureaus (USGS, NPS, FWS, and BIA), WAPA, and | ||
| + | representatives from the Basin States and UCRC. The purpose of these meetings or | ||
| + | calls is for the participants to share and seek information on Glen Canyon Dam | ||
| + | operations. One liaison from each Basin State and from the UCRC may participate | ||
| + | in the monthly operational coordination meetings or calls.” | ||
|} | |} | ||
Revision as of 14:10, 21 January 2022
|
|
|
| -- |
-- |
-- |
|---|
|
|