GCDAMP- HFE 2016
From Glen Canyon Dam AMP
Revision as of 15:18, 18 October 2016 by Cellsworth (Talk | contribs)
SUMMARY
High Flow Experiment- 2016 | |
- Sediment in the system: TBD
- Peak CFS: 35,100 cfs
- Powerplant capacity = 20,100 cfs
- Units available: 6
- Bypass tube capacity = 15,000 cfs
- Estimated acre feet of water bypassed during HFE: 125 kaf
- November volume = 745 kaf
- Hourly Releases before and after HFE: fluctuate between 6,000 to 9,000 cfs
- Estimated costs to hydropower: $1.4 million
- Actual costs to hydropower: TBD
- Direct expenses for removal of concession assets: TBD
- Start Upramp: TBD
- Finish HFE: TBD
- Total HFE duration: 96 hrs
- HFE 2016 represents the 4th controlled high flow release conducted under the HFE Protocol.
SUPPORTING DOCUMENTS
COMPLIANCE
CONCERNS
- Angler's concerns regarding a Fall 2016 High flow experiment
- Re-emergence of green sunfish in the -12 Mile Slough
- Increase in brown trout spawning and the increased prevalence of adult brown trout in the Lees Ferry reach since the beginning of the HFE Protocol
SEDIMENT
ADDITIONAL