River gage. Specific suggestions from the panel include:
 
River gage. Specific suggestions from the panel include:
  
*Greater attention to prioritization of proposed activities and associated
+
Greater attention to prioritization of proposed activities and associated budgeted items.
budgeted items.
+
 
*The SOW does not identify what fraction of the budget is support for any
+
The SOW does not identify what fraction of the budget is support for any experimental flows that might occur during the budget period. Does the budget reflect the anticipation of an experimental flow, or would supplementary funds be required for such an event?
experimental flows that might occur during the budget period. Does the
+
 
budget reflect the anticipation of an experimental flow, or would
+
The level of effort and analysis provided seems to warrant a full-time effort by the project chief, rather than 75% of his time.
supplementary funds be required for such an event?
+
 
*The level of effort and analysis provided seems to warrant a full-time
+
The scope and sophistication of sediment and water quality measurements have undergone dramatic increase during the past 3-5 years. Although the document clearly identifies the techniques, protocols, and schedules to be
effort by the project chief, rather than 75% of his time.
+
used, there is less sense of the place of the work plan in the long-term evolution of sediment and water quality monitoring. For example, which of the activities are baseline monitoring that would be expected to occur  
*The scope and sophistication of sediment and water quality measurements
+
many years into the future, and which are relatively short-term measurements primarily to be used for model calibration and then discontinued?
have undergone dramatic increase during the past 3-5 years. Although the
+
 
document clearly identifies the techniques, protocols, and schedules to be
+
The monitoring could be strengthened in two ways to reflect the scientific
used, there is less sense of the place of the work plan in the long-term
+
evolution of sediment and water quality monitoring. For example, which
+
of the activities are baseline monitoring that would be expected to occur  
+
many years into the future, and which are relatively short-term
+
measurements primarily to be used for model calibration and then
+
discontinued?
+
*The monitoring could be strengthened in two ways to reflect the scientific
+
 
findings of the past few years. Two important discoveries are that bed
 
findings of the past few years. Two important discoveries are that bed
 
sediment size and tributary (mainly Paria) sediment inputs exert first-order
 
sediment size and tributary (mainly Paria) sediment inputs exert first-order
Line 102: Line 97:
 
the panel recommends reducing work downstream of the Grand Canyon
 
the panel recommends reducing work downstream of the Grand Canyon
 
gage.
 
gage.
*Instrumentation issues: A USGS series report thoroughly documenting
+
 
 +
Instrumentation issues: A USGS series report thoroughly documenting
 
instrument calibration and development of time series of cross-sectionally
 
instrument calibration and development of time series of cross-sectionally
 
averaged velocity weighted suspended sediment concentrations (silt/clay
 
averaged velocity weighted suspended sediment concentrations (silt/clay
Line 118: Line 114:
 
should be provided. A subset of this report should be published in the peer
 
should be provided. A subset of this report should be published in the peer
 
reviewed literature. If possible, validation should also be presented.
 
reviewed literature. If possible, validation should also be presented.
*The project should consider the cost of maintaining redundant systems as
+
 
 +
The project should consider the cost of maintaining redundant systems as
 
calibration and intercomparisons of data measurement techniques become
 
calibration and intercomparisons of data measurement techniques become
 
sufficient. The LISSTs appear to be the instrument that requires the most
 
sufficient. The LISSTs appear to be the instrument that requires the most
Line 126: Line 123:
 
infinity which, although having a larger initial cost, will likely reduce
 
infinity which, although having a larger initial cost, will likely reduce
 
long-term maintenance
 
long-term maintenance
*The project should evaluate servicing frequency because several
+
 
 +
The project should evaluate servicing frequency because several
 
instrument malfunctions developed during the preceding six-month
 
instrument malfunctions developed during the preceding six-month
 
servicing interval, necessitating difficult and inefficient return trips by foot.
 
servicing interval, necessitating difficult and inefficient return trips by foot.
 
Perhaps a four-month servicing interval would actually save the project
 
Perhaps a four-month servicing interval would actually save the project
 
money and allow for more efficient use of staff time.
 
money and allow for more efficient use of staff time.
*When instruments are not operating, the shifting rating curves presented
+
 
 +
When instruments are not operating, the shifting rating curves presented
 
by Scott Wright appear to be a potential method to fill data gaps, and the
 
by Scott Wright appear to be a potential method to fill data gaps, and the
 
project should continue to investigate this method. It is important that
 
project should continue to investigate this method. It is important that
 
these data be appropriately flagged in the database, however, as being
 
these data be appropriately flagged in the database, however, as being
 
estimated.
 
estimated.
*Does the proposed SOW include funding to WRD to maintain and develop
+
 
 +
Does the proposed SOW include funding to WRD to maintain and develop
 
the water discharge side of the data?
 
the water discharge side of the data?
 +
 
• Although Topping’s approach to characterizing the tributaries is the least
 
• Although Topping’s approach to characterizing the tributaries is the least
 
expensive approach available, the accuracy of the siphon samplers is
 
expensive approach available, the accuracy of the siphon samplers is
 
uncertain.
 
uncertain.
 +
 
• The techniques developed and used in the Grand Canyon to monitor
 
• The techniques developed and used in the Grand Canyon to monitor
 
suspended sediments should be fully developed and tested in other
 
suspended sediments should be fully developed and tested in other
Line 148: Line 150:
 
research-oriented techniques. This could be important in any court
 
research-oriented techniques. This could be important in any court
 
challenges to the scientific data produced.
 
challenges to the scientific data produced.
 +
 
• The management information needs are for monthly data, but continuous
 
• The management information needs are for monthly data, but continuous
 
data are still needed because of the ephemeral nature of flows, especially
 
data are still needed because of the ephemeral nature of flows, especially
 
from tributaries, and the daily variation of discharge.
 
from tributaries, and the daily variation of discharge.
 +
 
• Data reports: Given that the water-quality data collection is evolving from
 
• Data reports: Given that the water-quality data collection is evolving from
 
a research activity to a monitoring activity, an annual USGS open-file
 
a research activity to a monitoring activity, an annual USGS open-file
 
report summarizing suspended-sediment concentration data should be
 
report summarizing suspended-sediment concentration data should be
 
written or the data should be included in Arizona’s Annual Data Report.
 
written or the data should be included in Arizona’s Annual Data Report.
 +
 
• Error estimates: The project personnel are commended for their
 
• Error estimates: The project personnel are commended for their
 
recognition and concern for the errors associated with the field
 
recognition and concern for the errors associated with the field
Line 164: Line 169:
 
long-term errors be consulted, and that a better representation of the
 
long-term errors be consulted, and that a better representation of the
 
prediction errors be determined.  
 
prediction errors be determined.  
8
+
 
2. Modeling support linked to integrated quality-of-water core monitoring (Wright
+
===Modeling support linked to integrated quality-of-water core monitoring (Wright and others)===
and others).
+
 
 
The goals of the modeling effort, as outlined in the statement of work, are
 
The goals of the modeling effort, as outlined in the statement of work, are
 
appropriate and reasonable. The statement of work appears to place the modeling
 
appropriate and reasonable. The statement of work appears to place the modeling
Line 180: Line 185:
 
Participation of Scott Wright in both programs is regarded as a positive step in this
 
Participation of Scott Wright in both programs is regarded as a positive step in this
 
direction.
 
direction.
Additional specific comments from the panel (see Appendix 3 for written suggestions or
+
 
recommendations provided by scientists):
+
===Additional specific comments from the panel (see Appendix 3 for written suggestions or recommendations provided by scientists)===
 +
 
 
• The statement that the model will be used to fill data gaps where instrument
 
• The statement that the model will be used to fill data gaps where instrument
 
problems have occurred must be implemented carefully. Model simulations are
 
problems have occurred must be implemented carefully. Model simulations are
 
not observed data and need to be clearly identified and represented as simulations.
 
not observed data and need to be clearly identified and represented as simulations.
 +
 
• The 1-d temperature model seems appropriate, but the combination of separate
 
• The 1-d temperature model seems appropriate, but the combination of separate
 
FORTRAN codes that must be operated in sequence is awkward. Hopefully the
 
FORTRAN codes that must be operated in sequence is awkward. Hopefully the
 
interface will automate and hide all of this from the operational user.
 
interface will automate and hide all of this from the operational user.
 +
 
• Although the integration of tributary sediment input into the Colorado River
 
• Although the integration of tributary sediment input into the Colorado River
 
sediment transport model is important, the panel is not convinced that the
 
sediment transport model is important, the panel is not convinced that the
 
Colorado River model is currently adequate. Also, the budget for the proposed
 
Colorado River model is currently adequate. Also, the budget for the proposed
 
integration seems low, irrespective of the adequacy of the mainstem model.
 
integration seems low, irrespective of the adequacy of the mainstem model.
 +
 
• It is unfortunate that the proposal does not address improvements to the current
 
• It is unfortunate that the proposal does not address improvements to the current
 
mainstem model. Presentations during the PEP by Peter Wilcock clearly showed
 
mainstem model. Presentations during the PEP by Peter Wilcock clearly showed
Line 200: Line 209:
 
is needed to parameterize the eddy contributions to sediment management in the
 
is needed to parameterize the eddy contributions to sediment management in the
 
model.
 
model.
 +
 
• A long-term sediment transport model is desperately needed to demonstrate to
 
• A long-term sediment transport model is desperately needed to demonstrate to
 
stakeholders the potential results of various operational scenarios. This capability
 
stakeholders the potential results of various operational scenarios. This capability
Line 208: Line 218:
 
condition of the model. The panel recommends that the current one-dimensional
 
condition of the model. The panel recommends that the current one-dimensional
 
Colorado River model be critically reviewed by a small group that will be tasked  
 
Colorado River model be critically reviewed by a small group that will be tasked  
9
 
 
with making recommendations to guide further development or re-development of
 
with making recommendations to guide further development or re-development of
 
the model.
 
the model.
 +
 
• No detailed statements of work corresponding to that provided for the Topping et
 
• No detailed statements of work corresponding to that provided for the Topping et
 
al. effort detail the efforts of Rubin and Wright.
 
al. effort detail the efforts of Rubin and Wright.
 +
 
• Although the document covers the new near-shore temperature monitoring (and
 
• Although the document covers the new near-shore temperature monitoring (and
 
modeling?) effort, it is not clear who will be responsible for this program.
 
modeling?) effort, it is not clear who will be responsible for this program.
 +
 
• The largest single line item in the budget is “Outside USGS Contract Science
 
• The largest single line item in the budget is “Outside USGS Contract Science
 
Labor (17% Burden Rate)” at $325K, but the dispersal of these funds is largely
 
Labor (17% Burden Rate)” at $325K, but the dispersal of these funds is largely
Line 221: Line 233:
 
Effectiveness of current or proposed sediment core monitoring in meeting identified core
 
Effectiveness of current or proposed sediment core monitoring in meeting identified core
 
information needs and answering strategic science questions
 
information needs and answering strategic science questions
 +
 
Need for a comprehensive structured approach. At the most fundamental level,
 
Need for a comprehensive structured approach. At the most fundamental level,
 
the panel notes the lack of a comprehensive structured approach that can be used to
 
the panel notes the lack of a comprehensive structured approach that can be used to
Line 229: Line 242:
 
model remains an envisioned endpoint of the GCMRC activities, because such a model
 
model remains an envisioned endpoint of the GCMRC activities, because such a model
 
was not used as a framework to guide discussion of physical science research projects.
 
was not used as a framework to guide discussion of physical science research projects.
As an example of the questions that arise in the absence of a structured approach,
+
 
 +
As an example of the questions that arise in the absence of a structured approach,
 
the panel remains uncertain how the efforts to model fine sediment dynamics (Steve
 
the panel remains uncertain how the efforts to model fine sediment dynamics (Steve
 
Wiele and others) integrate with the efforts to model coarse sediment dynamics (Robert
 
Wiele and others) integrate with the efforts to model coarse sediment dynamics (Robert
Line 239: Line 253:
 
framework on which all program scientists agree. A comprehensive structured approach
 
framework on which all program scientists agree. A comprehensive structured approach
 
would improve program effectiveness by allowing (i) identification of gaps in existing
 
would improve program effectiveness by allowing (i) identification of gaps in existing
monitoring and research efforts, (ii) identification of gaps in the current state-of-theknowledge
+
monitoring and research efforts, (ii) identification of gaps in the current state-of-the knowledge
 
of the overall system, (iii) evaluation of whether the balance among the effort
 
of the overall system, (iii) evaluation of whether the balance among the effort
 
distribution in monitoring, applied studies, and modeling is appropriate, (iv) evaluation of
 
distribution in monitoring, applied studies, and modeling is appropriate, (iv) evaluation of
Line 251: Line 265:
 
adaptive management cycle of experimentation, monitoring, evaluation, and
 
adaptive management cycle of experimentation, monitoring, evaluation, and
 
implementation.  
 
implementation.  
10
+
 
Fine sediment modeling. The panel believes that more effective communication is
+
===Fine sediment modeling===
 +
 
 +
The panel believes that more effective communication is
 
required between scientists involved primarily in modeling (Steve Wiele and others) and
 
required between scientists involved primarily in modeling (Steve Wiele and others) and
 
scientists focusing on data collection and analysis. Modeling must be a component of the
 
scientists focusing on data collection and analysis. Modeling must be a component of the
Line 262: Line 278:
 
Topping and Steve Wiele reduces the effectiveness of the GCMRC physical resources
 
Topping and Steve Wiele reduces the effectiveness of the GCMRC physical resources
 
program.
 
program.
 +
 
Scientists engaged in data collection and analysis should help guide model
 
Scientists engaged in data collection and analysis should help guide model
 
development by prioritizing the critical questions to be addressed in simulations, as well
 
development by prioritizing the critical questions to be addressed in simulations, as well
Line 289: Line 306:
 
at the stage of preliminary testing. Proposed calibration of the model using existing 2007
 
at the stage of preliminary testing. Proposed calibration of the model using existing 2007
 
funds will presumably lead to future improvements.
 
funds will presumably lead to future improvements.
 +
 
The panel believes that the fine sediment model needs to have the capability to (i)
 
The panel believes that the fine sediment model needs to have the capability to (i)
 
simulate a range of flow scenarios, (ii) account for eddy storage dynamics to at least a
 
simulate a range of flow scenarios, (ii) account for eddy storage dynamics to at least a
Line 294: Line 312:
 
model needs to provide first-order estimates of the effects of different management
 
model needs to provide first-order estimates of the effects of different management
 
scenarios, although in order to do this it may be necessary to run 2d or 3d models of  
 
scenarios, although in order to do this it may be necessary to run 2d or 3d models of  
11
 
 
specific processes such as eddy dynamics, for which field-based hydraulic measurements
 
specific processes such as eddy dynamics, for which field-based hydraulic measurements
 
will be needed. The initial, one-dimensional theoretical model without calibration has
 
will be needed. The initial, one-dimensional theoretical model without calibration has
Line 318: Line 335:
 
a two-stage approach of using Wiele’s 2+d model to calibrate the one-dimensional model.
 
a two-stage approach of using Wiele’s 2+d model to calibrate the one-dimensional model.
 
The FIST reaches do not appear to have been utilized in this way.
 
The FIST reaches do not appear to have been utilized in this way.
 +
 
A weakness of the present modeling efforts resides in the lack of quality control
 
A weakness of the present modeling efforts resides in the lack of quality control
 
of the model and its solution. There are recommended practices that should be followed
 
of the model and its solution. There are recommended practices that should be followed
Line 339: Line 357:
 
LISST and multifrequency acoustics. The LISST appears to provide valuable data, but
 
LISST and multifrequency acoustics. The LISST appears to provide valuable data, but
 
requires an extraordinary amount of maintenance. Is the added value worth the cost?  
 
requires an extraordinary amount of maintenance. Is the added value worth the cost?  
12
 
 
Could the system be monitored to an acceptable level with only multifrequency
 
Could the system be monitored to an acceptable level with only multifrequency
 
acoustics? If the LISST is needed, it is likely that the initial cost of installing LISST
 
acoustics? If the LISST is needed, it is likely that the initial cost of installing LISST
Line 350: Line 367:
 
sampling at the Paria, LCR (Little Colorado River), and Diamond Creek, with 20%
 
sampling at the Paria, LCR (Little Colorado River), and Diamond Creek, with 20%
 
accuracy in the associated rating curve.)
 
accuracy in the associated rating curve.)
Core monitoring and analysis. Monitoring, applied studies, and modeling form
+
 
 +
===Core monitoring and analysis===
 +
 
 +
Monitoring, applied studies, and modeling form
 
the three basic components of the physical resources program of GCMRC. Monitoring
 
the three basic components of the physical resources program of GCMRC. Monitoring
 
activities feed directly into the identified CMIN (core monitoring information needs),
 
activities feed directly into the identified CMIN (core monitoring information needs),
Line 368: Line 388:
 
also demonstrated the existence of “hot spots” where most of the change in sediment
 
also demonstrated the existence of “hot spots” where most of the change in sediment
 
storage occurs.
 
storage occurs.
 +
 
Because experimental flows remain critical to achieving understanding of the
 
Because experimental flows remain critical to achieving understanding of the
 
Colorado River ecosystem, these flows must continue. One of the largest constraints on
 
Colorado River ecosystem, these flows must continue. One of the largest constraints on
Line 382: Line 403:
 
is the heart of the adaptive management process. The lack of a model to show potential
 
is the heart of the adaptive management process. The lack of a model to show potential
 
results may be hindering the project from moving forward.  
 
results may be hindering the project from moving forward.  
13
+
 
Sediment monitoring strategies. Lacking specific metrics to guide monitoring, at
+
===Sediment monitoring strategies===
 +
 
 +
Lacking specific metrics to guide monitoring, at
 
least three complementary but potentially redundant approaches exist with respect to
 
least three complementary but potentially redundant approaches exist with respect to
 
sediment monitoring in the Colorado River ecosystem. The first approach is to detect the
 
sediment monitoring in the Colorado River ecosystem. The first approach is to detect the
Line 412: Line 435:
 
to date, although it remains unclear whether bed sediment size is causal or correlative
 
to date, although it remains unclear whether bed sediment size is causal or correlative
 
with supply and transport history.
 
with supply and transport history.
 +
 
The third approach for monitoring sediment is to continue a full FIST approach to
 
The third approach for monitoring sediment is to continue a full FIST approach to
 
identify changes in the spatial distribution of sediment on the bank and bars in long
 
identify changes in the spatial distribution of sediment on the bank and bars in long
Line 426: Line 450:
 
integrated work plan. Until the final results of the remote sensing data are completed, its
 
integrated work plan. Until the final results of the remote sensing data are completed, its
 
usefulness compared with cost cannot be determined. There is always value in long-term  
 
usefulness compared with cost cannot be determined. There is always value in long-term  
14
 
 
data sets and for this reason the repeated ground surveys of the NAU sites should be
 
data sets and for this reason the repeated ground surveys of the NAU sites should be
 
continued. Based on the results of the remote-sensing data, it may be beneficial to reduce
 
continued. Based on the results of the remote-sensing data, it may be beneficial to reduce
Line 432: Line 455:
 
data. This determination will have to be made by the project staff once the processing and
 
data. This determination will have to be made by the project staff once the processing and
 
analysis of the remote sensing data are complete.
 
analysis of the remote sensing data are complete.
 +
 
It will be the task of managers, as guided by recommendations from program
 
It will be the task of managers, as guided by recommendations from program
 
scientists and peer reviewers, to choose among the alternate approaches for sediment
 
scientists and peer reviewers, to choose among the alternate approaches for sediment
Line 440: Line 464:
 
sufficient period of time to allow the scientists to analyze their data in order to recoup the
 
sufficient period of time to allow the scientists to analyze their data in order to recoup the
 
GCMRC’s existing investment.
 
GCMRC’s existing investment.
Potential for integration of sediment core monitoring protocols with other related
+
 
program activities and objectives
+
===Potential for integration of sediment core monitoring protocols with other related program activities and objectives===
The degree of integration among the three core programs of the GCMRC has
+
 
 +
The degree of integration among the three core programs of the GCMRC has
 
improved since 1999, but the programs are not yet effectively integrated. The panel
 
improved since 1999, but the programs are not yet effectively integrated. The panel
 
recommends the following actions as means to foster integration among the programs:
 
recommends the following actions as means to foster integration among the programs:
 +
 
• Establish common frames of reference that facilitate discussion of effects of
 
• Establish common frames of reference that facilitate discussion of effects of
 
changing flow and sediment regimes among scientists in the three programs.
 
changing flow and sediment regimes among scientists in the three programs.
Line 452: Line 478:
 
are of particular concern to the biological and sociocultural programs,
 
are of particular concern to the biological and sociocultural programs,
 
respectively.
 
respectively.
 +
 
• Evaluate trade-offs among different resources as a function of differing flow
 
• Evaluate trade-offs among different resources as a function of differing flow
 
regimes. For example, how does a specific flow scenario affect survival of
 
regimes. For example, how does a specific flow scenario affect survival of
Line 461: Line 488:
 
multiple objectives articulated by stakeholders in the adaptive management
 
multiple objectives articulated by stakeholders in the adaptive management
 
process.
 
process.
 +
 
• Identification by scientists in other programs of physical parameters which are
 
• Identification by scientists in other programs of physical parameters which are
 
central to their understanding of the river ecosystem. Scientists in the physical
 
central to their understanding of the river ecosystem. Scientists in the physical
Line 469: Line 497:
 
useful to scientists in other programs. What level of detail do biologists want for
 
useful to scientists in other programs. What level of detail do biologists want for
 
quantifying aquatic and riparian habitat, for example, with respect to area, volume,  
 
quantifying aquatic and riparian habitat, for example, with respect to area, volume,  
15
 
 
or substrate type? What other types of measurements (e.g. water temperature,
 
or substrate type? What other types of measurements (e.g. water temperature,
 
dissolved oxygen) could be emplaced at existing flow and sediment measurement
 
dissolved oxygen) could be emplaced at existing flow and sediment measurement
 
sites that would be useful to biologists?
 
sites that would be useful to biologists?
 +
 
• Joint annual research symposia and river trips by scientists in the three core
 
• Joint annual research symposia and river trips by scientists in the three core
 
monitoring and research programs that are organized specifically to identify
 
monitoring and research programs that are organized specifically to identify
Line 479: Line 507:
 
should ultimately facilitate use of an ecosystem-level adaptive management
 
should ultimately facilitate use of an ecosystem-level adaptive management
 
model.
 
model.
 +
 
• As noted earlier in this report, many of the 1999 recommendations of the PEP
 
• As noted earlier in this report, many of the 1999 recommendations of the PEP
 
SEDS panel have been implemented by the GCMRC staff and scientists. It is not
 
SEDS panel have been implemented by the GCMRC staff and scientists. It is not
Line 489: Line 518:
 
many of the objectives of both the biological and sociocultural programs, albeit
 
many of the objectives of both the biological and sociocultural programs, albeit
 
on different time scales.
 
on different time scales.
Responses to specific questions and recommendations from scientists in the physical
+
 
resources program
+
===Responses to specific questions and recommendations from scientists in the physical resources program===
 +
 
 
• The FIST data would need to be fully evaluated in relation to the mass balance
 
• The FIST data would need to be fully evaluated in relation to the mass balance
 
and NAU data before the panel could recommend continuation of one versus the
 
and NAU data before the panel could recommend continuation of one versus the
Line 503: Line 533:
 
group collected the type of data intended, but these data have not been utilized by
 
group collected the type of data intended, but these data have not been utilized by
 
modelers.
 
modelers.
 +
 
• At this point, the panel does not consider it necessary to add further monitoring
 
• At this point, the panel does not consider it necessary to add further monitoring
 
sites downstream from Phantom Ranch, but this may need to be revisited
 
sites downstream from Phantom Ranch, but this may need to be revisited
 
(presumably by stakeholders) in the future.
 
(presumably by stakeholders) in the future.
 +
 
• The fact that much remains to be learned about where bars will be built or
 
• The fact that much remains to be learned about where bars will be built or
 
reduced as a function of flow magnitude, duration, and timing with respect to
 
reduced as a function of flow magnitude, duration, and timing with respect to
Line 512: Line 544:
 
panel endorses the goal of reducing error in the sediment mass balance by
 
panel endorses the goal of reducing error in the sediment mass balance by
 
obtaining better data (particularly high flow data) from the Paria River.
 
obtaining better data (particularly high flow data) from the Paria River.
 +
 
• Work to date on LiDAR is very impressive and is useful for monitoring changes
 
• Work to date on LiDAR is very impressive and is useful for monitoring changes
 
in beach area and vegetation cover. The panel recommends continued use of  
 
in beach area and vegetation cover. The panel recommends continued use of  
16
 
 
LiDAR, although this may not be necessary every year or with continuous
 
LiDAR, although this may not be necessary every year or with continuous
 
coverage of the Colorado River ecosystem. LiDAR surveys should be carefully
 
coverage of the Colorado River ecosystem. LiDAR surveys should be carefully
Line 527: Line 559:
 
project scientists consider using the Kruskal-Wallis rank test or a similar
 
project scientists consider using the Kruskal-Wallis rank test or a similar
 
statistical test to address this question.
 
statistical test to address this question.
 +
 
• Topping and Rubin have already done a tremendous amount of work, but the
 
• Topping and Rubin have already done a tremendous amount of work, but the
 
panel questions their ability to make substantial additional progress without more
 
panel questions their ability to make substantial additional progress without more
Line 535: Line 568:
 
modeling is a good start at tying these different data sets together, but work is
 
modeling is a good start at tying these different data sets together, but work is
 
needed on model calibration rather than on further model development.
 
needed on model calibration rather than on further model development.
 +
 
• The panel recommends that Topping and other physical resources program
 
• The panel recommends that Topping and other physical resources program
 
scientists consult with experts on error and uncertainty, such as Tim Cohen of the
 
scientists consult with experts on error and uncertainty, such as Tim Cohen of the
 
U.S. Geological Survey, Office of Surface Water, in Reston, Virginia.
 
U.S. Geological Survey, Office of Surface Water, in Reston, Virginia.
 +
 
• The panel recommends careful consideration of cost-benefit ratios for all
 
• The panel recommends careful consideration of cost-benefit ratios for all
 
monitoring and analysis techniques used in the physical resources program.
 
monitoring and analysis techniques used in the physical resources program.
 +
 
• The panel and GCMRC need a better-coordinated scheme for identifying the type
 
• The panel and GCMRC need a better-coordinated scheme for identifying the type
 
of information now critical to modeling efforts in order to prioritize funding for
 
of information now critical to modeling efforts in order to prioritize funding for
 
continued monitoring and research efforts versus new directions.
 
continued monitoring and research efforts versus new directions.
 +
 
• The qualities of “sustainable” or “attainable” conditions in resources need to be
 
• The qualities of “sustainable” or “attainable” conditions in resources need to be
 
more precisely defined to guide monitoring.
 
more precisely defined to guide monitoring.
 +
 
• The panel feels that David Topping plays an essential role in this program. He
 
• The panel feels that David Topping plays an essential role in this program. He
 
does very high quality work and has many skills that cannot be replicated by other
 
does very high quality work and has many skills that cannot be replicated by other

Latest revision as of 11:26, 21 November 2018


SandGrain.jpg

2006 Physical Resources PEP participants

  • CHAIR: Ellen Wohl, Department of Geosciences, Colorado State University, Ft. Collins, CO, 80523-1482, phone 970-491-5298, fax 970-491-6307, [email protected]
  • James P. Bennett, U.S. Geological Survey (retired), 3026 Parfet Drive, Lakewood, CO, 80215, [email protected]
  • Michael D. Blum, Department of Geology and Geophysics, E235 Howe-Russell, Geosciences Complex, Louisiana State University, Baton Rouge, LA, 70803, phone 225-578-5735, fax 225-578-2302, [email protected]
  • Gordon E. Grant, USDA Forest Service, Pacific Northwest Research Station, Forestry Sciences Laboratory 280, 3200 SW Jefferson Way, Corvallis, OR, 97331-8550, phone 541-750-7328, fax 541-750-7329, [email protected]
  • Daniel M. Hanes, U.S. Geological Survey, Coastal and Marine Geology Program, Pacific Science Center, 400 Natural Bridges Drive, Santa Cruz, CA, 95060, phone 831-427-4718, fax 831-427-4748, [email protected]
  • Alan D. Howard, Department of Environmental Sciences, University of Virginia, 291 McCormick Road, P.O. Box 400123, Charlottesville, VA, 22904-4123, phone 434-924-0563, fax 434-982-2137, [email protected]
  • David S. Mueller, U.S. Geological Survey, Office of Surface Water, 9818 Bluegrass Parkway, Louisville, KY, 40299, phone 502-493-1935, fax 502-493-1909, [email protected]
  • David H. Schoellhamer, U.S. Geological Survey, Placer Hall, 6000 J Street, Sacramento, CA, 95819-6129, phone 916-278-3126, fax 916-278-3071, [email protected]
  • Francisco J. Simoes, U.S. Geological Survey, Denver Federal Center, National Research Program, Box 25046, Lakewood, CO, 80225-0046, phone 303-236-4556, fax 303-236-5034, [email protected]
--
--
--

Findings and Recommendations

Integrated quality-of-water core monitoring, with emphasis on sediment elements (Topping and others)

The panel considers the sediment statement of work (SOW) to be reasonable. This SOW effectively documents the role that the measurements play in overall sediment and water quality monitoring and in supplying data for modeling efforts. It is clear that most of the measurements and budgeted effort are related to background measurements and would be relatively unaffected by the occurrence (or not) of an experimental flow. The proposed activities seem to be important to creating a realistic sediment budget and water-quality assessment. The panel supports funding to continue the work by David Topping and others, and recommends that Topping be fully funded. Other staffing requests in the SOW are appropriate.

The statement of work gives more attention to what has already been done than to proposed work for 2007, with the exception of installing a LISST infinity at the Paria River gage. Specific suggestions from the panel include:

• Greater attention to prioritization of proposed activities and associated budgeted items.

• The SOW does not identify what fraction of the budget is support for any experimental flows that might occur during the budget period. Does the budget reflect the anticipation of an experimental flow, or would supplementary funds be required for such an event?

• The level of effort and analysis provided seems to warrant a full-time effort by the project chief, rather than 75% of his time.

• The scope and sophistication of sediment and water quality measurements have undergone dramatic increase during the past 3-5 years. Although the document clearly identifies the techniques, protocols, and schedules to be used, there is less sense of the place of the work plan in the long-term evolution of sediment and water quality monitoring. For example, which of the activities are baseline monitoring that would be expected to occur many years into the future, and which are relatively short-term measurements primarily to be used for model calibration and then discontinued?

• The monitoring could be strengthened in two ways to reflect the scientific findings of the past few years. Two important discoveries are that bed sediment size and tributary (mainly Paria) sediment inputs exert first-order control on sediment transport in the Colorado downstream of Glen Canyon Dam. In light of this, the panel recommends more focus on 1) bed sediment grain size (and its temporal and spatial variations) and 2) Paria inputs. For grain size, we recommend that the bed sediment camera be added as a routine component of the monitoring during field trips. Some effort should be expended to explore the feasibility of a remotely operating bed sediment camera that could be used for "continuous" monitoring. With regard to the Paria river, a variety of sensors should be installed upstream of the Colorado River junction in order to obtain more accurate measurements of discharge, stage, suspended sediment flux, bed sediment grain size, and bedload sediment flux. The proposed LISSTinfinity is a great start, but there should be even more emphasis on obtaining better data in the Paria, in order to more accurately constrain the sediment input to the Colorado. This is a significant request that requires either increased resources or cuts elsewhere. If program cuts are required, the panel recommends reducing work downstream of the Grand Canyon gage.

• Instrumentation issues: A USGS series report thoroughly documenting instrument calibration and development of time series of cross-sectionally averaged velocity weighted suspended sediment concentrations (silt/clay and sand) should be written. A comparison of the D-77 bag sampler used on this project with the currently recommended D-96 sampler should be provided to document that the project sampler is acceptable. The review panel understands the difficulty and limitations of the D-96 sampler, but the performance of the D-77 bag sampler needs to be documented through direct comparison or standard isokinetic laboratory tests. A comparison of pumped and sampler collected water samples should be provided to document that pumping samples is acceptable. Suspended-sediment load is determined with the Equal Width Increment (EWI) method using five stations in a cross section, whereas the rule of thumb is twenty stations. An evaluation of whether the EWI method with five stations is sufficient should be provided. A subset of this report should be published in the peer reviewed literature. If possible, validation should also be presented.

• The project should consider the cost of maintaining redundant systems as calibration and intercomparisons of data measurement techniques become sufficient. The LISSTs appear to be the instrument that requires the most maintenance and with fully operational acoustics could be considered for elimination to reduce long-term maintenance costs. If the data provided by the LISST continue to be important, the project should consider the LISST infinity which, although having a larger initial cost, will likely reduce long-term maintenance

• The project should evaluate servicing frequency because several instrument malfunctions developed during the preceding six-month servicing interval, necessitating difficult and inefficient return trips by foot. Perhaps a four-month servicing interval would actually save the project money and allow for more efficient use of staff time.

• When instruments are not operating, the shifting rating curves presented by Scott Wright appear to be a potential method to fill data gaps, and the project should continue to investigate this method. It is important that these data be appropriately flagged in the database, however, as being estimated.

• Does the proposed SOW include funding to WRD to maintain and develop the water discharge side of the data?

• Although Topping’s approach to characterizing the tributaries is the least expensive approach available, the accuracy of the siphon samplers is uncertain.

• The techniques developed and used in the Grand Canyon to monitor suspended sediments should be fully developed and tested in other environments. The validation of these methods in other environments will provide added validation to the data collected in the Grand Canyon and will likely make these methods standard techniques rather than special, research-oriented techniques. This could be important in any court challenges to the scientific data produced.

• The management information needs are for monthly data, but continuous data are still needed because of the ephemeral nature of flows, especially from tributaries, and the daily variation of discharge.

• Data reports: Given that the water-quality data collection is evolving from a research activity to a monitoring activity, an annual USGS open-file report summarizing suspended-sediment concentration data should be written or the data should be included in Arizona’s Annual Data Report.

• Error estimates: The project personnel are commended for their recognition and concern for the errors associated with the field measurements and the effects on long-term system response and prediction. The error analysis reported to the panel, however, was based purely on a composite unsigned error. The project should better determine the components of the error associated with random uncertainty and bias. It is recommended that someone with statistical expertise in quantifying long-term errors be consulted, and that a better representation of the prediction errors be determined.

Modeling support linked to integrated quality-of-water core monitoring (Wright and others)

The goals of the modeling effort, as outlined in the statement of work, are appropriate and reasonable. The statement of work appears to place the modeling effort within GCMRC, which the panel endorses. The proposed effort appears reasonable and very dependent on Scott Wright’s involvement. He has been working on the project for over two years, is knowledgeable of the system, appears to work well with other team members, and has the necessary sediment transport and modeling background. Although he recently moved to Sacramento, GCMRC should endeavor to maintain his involvement in the modeling effort. Steps should be taken to ensure that the modeling program is properly integrated with the core monitoring program of Topping and others. Where appropriate and possible these two programs should benefit from mutual feedback, because they share similar objectives. Participation of Scott Wright in both programs is regarded as a positive step in this direction.

Additional specific comments from the panel (see Appendix 3 for written suggestions or recommendations provided by scientists)

• The statement that the model will be used to fill data gaps where instrument problems have occurred must be implemented carefully. Model simulations are not observed data and need to be clearly identified and represented as simulations.

• The 1-d temperature model seems appropriate, but the combination of separate FORTRAN codes that must be operated in sequence is awkward. Hopefully the interface will automate and hide all of this from the operational user.

• Although the integration of tributary sediment input into the Colorado River sediment transport model is important, the panel is not convinced that the Colorado River model is currently adequate. Also, the budget for the proposed integration seems low, irrespective of the adequacy of the mainstem model.

• It is unfortunate that the proposal does not address improvements to the current mainstem model. Presentations during the PEP by Peter Wilcock clearly showed the type of long-term results desired from the model, but the model is not currently capable of producing those results. The only task in the current proposal for addressing this deficiency is further investigation of beta. Given that the model did not accurately replicate the erosion of sand from eddies, more research is needed to parameterize the eddy contributions to sediment management in the model.

• A long-term sediment transport model is desperately needed to demonstrate to stakeholders the potential results of various operational scenarios. This capability unfortunately does not exist at present, and the proposed work does not convincingly demonstrate that the current situation will be significantly improved. There was insufficient time to get into the detailed problems associated with the current model during the PEP, but the panel remains concerned about the condition of the model. The panel recommends that the current one-dimensional Colorado River model be critically reviewed by a small group that will be tasked with making recommendations to guide further development or re-development of the model.

• No detailed statements of work corresponding to that provided for the Topping et al. effort detail the efforts of Rubin and Wright.

• Although the document covers the new near-shore temperature monitoring (and modeling?) effort, it is not clear who will be responsible for this program.

• The largest single line item in the budget is “Outside USGS Contract Science Labor (17% Burden Rate)” at $325K, but the dispersal of these funds is largely unexplained. Does this cover the beach monitoring activities of the NAU group and/or the coarse sediment monitoring and research efforts or river trip logistics? Effectiveness of current or proposed sediment core monitoring in meeting identified core information needs and answering strategic science questions

Need for a comprehensive structured approach. At the most fundamental level, the panel notes the lack of a comprehensive structured approach that can be used to prioritize information needs, to define the flow of information that will get program scientists to a desired endpoint of understanding, and to specify the level of detail, such as the spatial and temporal resolution needed to address driving questions. It was not clear during the review panel meeting whether an integrative adaptive management model remains an envisioned endpoint of the GCMRC activities, because such a model was not used as a framework to guide discussion of physical science research projects.

As an example of the questions that arise in the absence of a structured approach, the panel remains uncertain how the efforts to model fine sediment dynamics (Steve Wiele and others) integrate with the efforts to model coarse sediment dynamics (Robert Webb and others). A structured approach defining how the different research components within the physical resources program fit together would promote understanding of program activities by peer reviewers and stakeholders, and would facilitate integration among individual scientists and research efforts. At present, such an understanding seems to be implicit in the minds of many individual researchers, but not clearly articulated in a framework on which all program scientists agree. A comprehensive structured approach would improve program effectiveness by allowing (i) identification of gaps in existing monitoring and research efforts, (ii) identification of gaps in the current state-of-the knowledge of the overall system, (iii) evaluation of whether the balance among the effort distribution in monitoring, applied studies, and modeling is appropriate, (iv) evaluation of the cost versus benefit for specific lines of research (all of the existing studies represent good work, but it remains unclear whether extending some of the projects is beneficial to achieving long-term goals; the sediment mass balance, for example, is fairly mature at this point, whereas the fine sediment modeling is fairly immature), and (v) clear identification of, and agreement on, the integrated goals and objectives of the physical resources program. A structured approach would also provide a framework for integration of the physical program with the biological and cultural programs and for the adaptive management cycle of experimentation, monitoring, evaluation, and implementation.

Fine sediment modeling

The panel believes that more effective communication is required between scientists involved primarily in modeling (Steve Wiele and others) and scientists focusing on data collection and analysis. Modeling must be a component of the mass balance, FIST, and coarse sediment projects, rather than a stand-alone exercise. This relationship requires that individual scientists work to ensure that they are making the best possible use of the data and understanding of other GCMRC scientists. The current collaboration between David Topping and David Rubin provides a good example of an effective partnership, whereas the apparent lack of collaboration between David Topping and Steve Wiele reduces the effectiveness of the GCMRC physical resources program.

Scientists engaged in data collection and analysis should help guide model development by prioritizing the critical questions to be addressed in simulations, as well as identifying the appropriate spatial and temporal scope and resolution. A longitudinal, system-wide model of water and sediment movement within the river ecosystem is essential, for example, but this can only be developed if Wiele’s group puts forth an effort comparable to Topping’s group, and is more integrated into the physical resources program than at present. The panel feels that the development of the fine sediment model thus far is below what could reasonably be expected. Modelers need to better assess the most important aspects of model unknowns and pursue these systematically. The existing model could also be substantially improved by strengthening the treatment of hydraulics within eddies, given the importance of this portion of the river system for sediment dynamics. Evaluation of different management scenarios requires a 2-3 eddy-length multidimensional model that can be tested during experimental flow releases. The model contains many simplifications, among which reach averaging, equilibrium, and one-dimensionality are the most significant. Given these simplifications, there is no reason to expect that theoretical coefficients would produce optimal results. Thus, the model must be calibrated. In addition, the equilibrium assumption is not applicable to experimental floods that are the primary application of the model, so the assumption should be removed from the model. For example, simulation of the 2004 experimental flood featured too much sediment arriving too soon at mile 30. This could result from the assumption of equilibrium, or from a settling velocity that is too small for the well-mixed cross section. At mile 87 the results were better, which is unusual because errors normally propagate downstream. The assumption of equilibrium would get better with distance downstream, so it is likely that the equilibrium assumption is the primary cause of the poor results at mile 30. Part of the problem is that the model remains at the stage of preliminary testing. Proposed calibration of the model using existing 2007 funds will presumably lead to future improvements.

The panel believes that the fine sediment model needs to have the capability to (i) simulate a range of flow scenarios, (ii) account for eddy storage dynamics to at least a first-order approximation, and (iii) better address reach-scale processes. Essentially, the model needs to provide first-order estimates of the effects of different management scenarios, although in order to do this it may be necessary to run 2d or 3d models of specific processes such as eddy dynamics, for which field-based hydraulic measurements will be needed. The initial, one-dimensional theoretical model without calibration has been used to assess general model trends, and this approach indicates that the model has promise. The model now needs further refinement and calibration and the panel suggests that the modeling team develop shorter time-step, more detailed simulations that are used to parameterize longer model runs that can then be applied to scenario testing as a management tool (for e.g., evaluating relative sediment input, sediment retention, and sediment output). The lack of detailed measurements during periods of change limits modeling efforts. Measurements of hourly to daily changes over a time period of days on a reach basis, for example, are necessary for the fine sediment model to be useful for management. The modelers first need to demonstrate that the model works on a simplified, theoretical or laboratory-type example, however, and this has not yet been shown by Wiele’s group. At this point, the existing model needs further work to make it applicable to evaluating different management scenarios, and this in turn requires much closer collaboration between modelers and field-based researchers. One way to facilitate this closer collaboration and to ensure that the fine sediment model meets the needs of the mass balance and FIST groups would be for GCMRC rather than other USGS offices to lead the modeling program. The FY2007 statement of work for modeling appears to accomplish this. One of the primary reasons that the earlier panel recommended concentrating on several reaches for the FIST monitoring effort was to provide the threedimensional geometry and temporal history of fine sediment storage that could be used in a two-stage approach of using Wiele’s 2+d model to calibrate the one-dimensional model. The FIST reaches do not appear to have been utilized in this way.

A weakness of the present modeling efforts resides in the lack of quality control of the model and its solution. There are recommended practices that should be followed by any general modeling program, and those have not been followed here. These practices have been standardized across disciplines by the AIAA (American Institute of Aeronautics and Astronautics), the ASME (American Society of Mechanical Engineering) and the ASCE (American Society of Civil Engineering), which publish those standards in manuals and other practice recommendation documents. Wiele and coworkers are referred to those documents and encouraged to follow them in future work. Assessing thresholds. Another issue relevant to data collection and modeling is how well physical resources scientists need to know the parameters and trends that they study. This issue can be paraphrased by asking, “Where is the elbow curve in a data set?” In other words, rather than focusing on detailed resolution, it may be most effective for project scientists to understand trends and thresholds within the river ecosystem. Given that the level of effort needs to be commensurate with the set of objectives identified, scientists involved in modeling and monitoring need to consider how to assess, for example, whether they’ve reached an 80% level of understanding of the system. Individual physical resources scientists are constantly assessing their level of accuracy, which is admirable, and the panel commends this as a strength of the program. However, there may be unnecessary overlap in current measurement programs, such as using both LISST and multifrequency acoustics. The LISST appears to provide valuable data, but requires an extraordinary amount of maintenance. Is the added value worth the cost? Could the system be monitored to an acceptable level with only multifrequency acoustics? If the LISST is needed, it is likely that the initial cost of installing LISST Infinities would be recovered in reduced maintenance costs. An analysis of this and associated costs should be developed. Project scientists should carefully consider what would be the minimal instrumentation needs to derive a trigger for an experimental flow release. The monitoring requirements to identify a trigger may be different than the monitoring requirements to track the short-term and long-term response to the triggered release. (An example might be discharge and sediment using acoustics and event-driven sampling at the Paria, LCR (Little Colorado River), and Diamond Creek, with 20% accuracy in the associated rating curve.)

Core monitoring and analysis

Monitoring, applied studies, and modeling form the three basic components of the physical resources program of GCMRC. Monitoring activities feed directly into the identified CMIN (core monitoring information needs), applied studies address key uncertainties, and modeling ties all three components together and provides a framework for the physical resources program and for scenario evaluation. The panel suggests that all three of these components be collectively referred to as core monitoring and analysis because effective monitoring requires interpretation, as provided by applied studies and modeling, that can inform adaptive management. Experimental flows. Experimental flow releases remain critical to the core monitoring and analysis program. These flows form an integral part of monitoring because they create episodic changes in the river ecosystem that can be planned for and measured, and thus provide a platform for calibrating conceptual and numerical models, and testing model predictions. The November 2004 flood provides a good example of adaptive management. The experimental release that created this flood was triggered by a naturally occurring flood on the Paria River. The November 2004 flood reversed much of the recent erosion on sand bars, but did not restore bars to pre-1990 condition. The flood also demonstrated the existence of “hot spots” where most of the change in sediment storage occurs.

Because experimental flows remain critical to achieving understanding of the Colorado River ecosystem, these flows must continue. One of the largest constraints on the ability of the physical resources program to learn is the lack of experimental flows. Scientists in the physical resource program have not yet evaluated the ability of annual or biannual experimental flows to build sustainable beach habitat and have not addressed the question of how to manage flows in order to conserve sand bars following experimental releases, for example. Scientists will probably need further experimental releases in order to address these critical questions. Experimental flows are necessary to adaptive management, and may result in operational flexibility that is not yet recognized as being possible. The use of scenarios modeled by an appropriately developed model could help provide justification to the AMWG that the costs of experimental floods are justified. The model may need to be revised as data collected during these floods are analyzed, but that is the heart of the adaptive management process. The lack of a model to show potential results may be hindering the project from moving forward.

Sediment monitoring strategies

Lacking specific metrics to guide monitoring, at least three complementary but potentially redundant approaches exist with respect to sediment monitoring in the Colorado River ecosystem. The first approach is to detect the trend of change in sand bar area and volume. This is only a first-order determination, yet is one of the more difficult to accomplish. In this context, the panel commends the works of the NAMDOR team in producing ground-based survey data that are critical to evaluating bar changes. The minimalist monitoring to accomplish detection of trends in sand bar area and volume is repeat surveys of existing, established sites on a regular basis, such as once a year, using ground-based techniques. This would provide the ability to detect long-term trends through time, but would not provide any insight into cause and effect or into impacts of changing flow regime. Adding event-based surveys to the annual surveys would increase the ability to detect the influence of controlled floods or fluctuating flow regime. The most effective monitoring will be sufficiently flexible and responsive to utilize unexpected events, such as sediment inputs from the Paria or LCR, as well as planned events such as controlled floods on the main channel. The second approach for monitoring sediment is to track inputs, storage, and outputs for a sediment mass balance. This provides the ability to quantify a trigger for beach habitat building flows (BHBFs). Continuing key uncertainties in using the mass balance approach include inputs from the Paria and the LCR, how much sediment remains stored in the main channel, and how much sediment has moved through the river system. Further quantifying the mass balance will provide insight into these unknowns for future controlled floods. A minimal level of mass balance would be based on considering only inputs. A more robust mass balance would also include outputs and overall mass balance. The panel believes that it is critical to have the more robust mass balance because our understanding of the system is insufficient at this point to make recommendations about controlled floods. The more robust mass balance should include monitoring of bed sediment grain size and density of coverage based on research results to date, although it remains unclear whether bed sediment size is causal or correlative with supply and transport history.

The third approach for monitoring sediment is to continue a full FIST approach to identify changes in the spatial distribution of sediment on the bank and bars in long reaches of the river. This approach would include detailed, event-based measurements of hydrodynamics and sediment transport in multiple eddies. The approach would provide the largest spatial distribution of data, but may be limited in accuracy because of the uncertainty associated with remote sensing data and surficial bathymetric surveys that cannot quantify the depth and composition of the bed material. It is unlikely that approaches 1 and 3 could provide the level of detail needed to trigger BHBFs or to develop and validate a sediment transport model of the system. Approach 2 can only provide information on how much sediment is stored or eroded, but not on where the storage or erosion is occurring in the system. A combination of approaches is therefore required, and all approaches need to be part of a unified and integrated work plan. Until the final results of the remote sensing data are completed, its usefulness compared with cost cannot be determined. There is always value in long-term data sets and for this reason the repeated ground surveys of the NAU sites should be continued. Based on the results of the remote-sensing data, it may be beneficial to reduce the number of NAU sites while expanding the spatial distribution with remote-sensing data. This determination will have to be made by the project staff once the processing and analysis of the remote sensing data are complete.

It will be the task of managers, as guided by recommendations from program scientists and peer reviewers, to choose among the alternate approaches for sediment monitoring. This panel recommends employing the first two approaches by continuing both annual and event-based ground monitoring of sand bars, and continuing development of the sediment mass balance for the river ecosystem. The panel also emphasizes that it is essential that funding for all existing research efforts continue for a sufficient period of time to allow the scientists to analyze their data in order to recoup the GCMRC’s existing investment.

Potential for integration of sediment core monitoring protocols with other related program activities and objectives

The degree of integration among the three core programs of the GCMRC has improved since 1999, but the programs are not yet effectively integrated. The panel recommends the following actions as means to foster integration among the programs:

• Establish common frames of reference that facilitate discussion of effects of changing flow and sediment regimes among scientists in the three programs. Stage in relation to discharge provides an example of such a frame of reference; discussing various flow scenarios with respect to stage would facilitate quantification of parameters such as fish habitat or camping area on bars, which are of particular concern to the biological and sociocultural programs, respectively.

• Evaluate trade-offs among different resources as a function of differing flow regimes. For example, how does a specific flow scenario affect survival of humpback chubs versus camping space versus preservation of archeological sites? Scientists in the physical resources program need to consider not just bar building, but also what comes after with respect to the continuing effects of different flow scenarios. The concept of trade-off space represents a higher objective for the monitoring program that would facilitate comparison of trade-offs among the multiple objectives articulated by stakeholders in the adaptive management process.

• Identification by scientists in other programs of physical parameters which are central to their understanding of the river ecosystem. Scientists in the physical resources program have impressive measurement capabilities for many parameters that are likely to be important to scientists in other programs, but integration is limited if the physical scientists are not informed of these parameters, and of the spatial and temporal resolution of measurements most useful to scientists in other programs. What level of detail do biologists want for quantifying aquatic and riparian habitat, for example, with respect to area, volume, or substrate type? What other types of measurements (e.g. water temperature, dissolved oxygen) could be emplaced at existing flow and sediment measurement sites that would be useful to biologists?

• Joint annual research symposia and river trips by scientists in the three core monitoring and research programs that are organized specifically to identify common frames of reference and to evaluate trade-offs among resources under differing management scenarios would foster collaboration and integration, and should ultimately facilitate use of an ecosystem-level adaptive management model.

• As noted earlier in this report, many of the 1999 recommendations of the PEP SEDS panel have been implemented by the GCMRC staff and scientists. It is not clear to the panel that this type of follow-through occurs as consistently in other programs. Serious attention to external review and implementation of review recommendations by other programs within GCMRC would provide important impetus to these programs and would facilitate integration among programs. Many of the recommendations from the most recent panel review for the sociocultural program are directly related to sediment issues, for example, as are many of the objectives of both the biological and sociocultural programs, albeit on different time scales.

Responses to specific questions and recommendations from scientists in the physical resources program

• The FIST data would need to be fully evaluated in relation to the mass balance and NAU data before the panel could recommend continuation of one versus the other. The physical resources program lacks consistent cross-comparison of different approaches within the same frame of reference, which hinders recommendations for prioritizing ongoing data collection efforts. True evaluation of the effectiveness of different approaches requires more integrated, comprehensive analysis of results and comparison between methods. FIST has not yet facilitated calibration and validation of Wiele’s 2d model, which was part of the original intent of implementing FIST. The original intent of FIST was to inform detailed models, which would then inform bin-based models. The FIST group collected the type of data intended, but these data have not been utilized by modelers.

• At this point, the panel does not consider it necessary to add further monitoring sites downstream from Phantom Ranch, but this may need to be revisited (presumably by stakeholders) in the future.

• The fact that much remains to be learned about where bars will be built or reduced as a function of flow magnitude, duration, and timing with respect to tributary sediment inputs argues for development of a robust sediment mass balance that includes the transport and export of sediment. As part of this, the panel endorses the goal of reducing error in the sediment mass balance by obtaining better data (particularly high flow data) from the Paria River.

• Work to date on LiDAR is very impressive and is useful for monitoring changes in beach area and vegetation cover. The panel recommends continued use of LiDAR, although this may not be necessary every year or with continuous coverage of the Colorado River ecosystem. LiDAR surveys should be carefully designed to provide information to all three GCMRC programs. LiDAR may be more effective as a targeted tool that is used in combination with ground-based surveys. Evaluations of different techniques would be facilitated by detailed comparisons such as ground-based versus LiDAR bar cross sections, or changes in volume, area, or vegetation cover of bars; fish finder versus NAU bathymetric surveys; or NAU versus FIST surveys for trend analysis of bars. Evaluations within individual data sets would also help to address questions such as whether fewer than 45 sections can be used for NAU surveys. The panel suggests that project scientists consider using the Kruskal-Wallis rank test or a similar statistical test to address this question.

• Topping and Rubin have already done a tremendous amount of work, but the panel questions their ability to make substantial additional progress without more clearly articulated goals within the overall sediment program. At present, they can provide a sand budget for the river ecosystem, the NAU group and Jack Schmidt can provide bar area, and Rubin and Roberto Anima can provide bed composition. All of these elements can now be tied together. Wiele’s 1d sediment transport modeling is a good start at tying these different data sets together, but work is needed on model calibration rather than on further model development.

• The panel recommends that Topping and other physical resources program scientists consult with experts on error and uncertainty, such as Tim Cohen of the U.S. Geological Survey, Office of Surface Water, in Reston, Virginia.

• The panel recommends careful consideration of cost-benefit ratios for all monitoring and analysis techniques used in the physical resources program.

• The panel and GCMRC need a better-coordinated scheme for identifying the type of information now critical to modeling efforts in order to prioritize funding for continued monitoring and research efforts versus new directions.

• The qualities of “sustainable” or “attainable” conditions in resources need to be more precisely defined to guide monitoring.

• The panel feels that David Topping plays an essential role in this program. He does very high quality work and has many skills that cannot be replicated by other scientists involved in the program. The innovative nature of the sediment mass balance that he has developed is admirable. The panel views his participation in the physical resources program as essential, and recommends that anything that would facilitate his continued participation should be endorsed because he plays such a unique role. Program success likely would considerably diminish without his presence at GCMRC and institutional knowledge, and his progress over the last decade has been phenomenal.