Difference between revisions of "GCDAMP Budget"

From Glen Canyon Dam AMP
Jump to: navigation, search
 
(39 intermediate revisions by the same user not shown)
Line 17: Line 17:
 
</table>
 
</table>
  
[[File:FY15 17TWP.jpg|center|600px]]
+
[[File:FY25-27TWP.png|center|600px| link=FY21-23 Triennial Budget and Workplan ]]
  
 
<!--
 
<!--
Line 51: Line 51:
  
 
|}
 
|}
 
  
 
{|style="margin:0px 0px 0px 0px; background:none;"
 
{|style="margin:0px 0px 0px 0px; background:none;"
 
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"|
 
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"|
 
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;"
 
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;"
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;"> [http://gcdamp.com/index.php?title=FY18-20_GCMRC_Triennial_Budget_and_Workplan FY18-20 GCMRC Triennial Budget and Workplan] </h2>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;"> Triennial Budget and Workplans </h2>
 +
|-
 +
|style="color:#000;"|
 +
 
 +
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY25-27 Triennial Budget and Workplan Page]] </h2>
 +
|-
 +
|style="color:#000;"|
 +
 
 +
 
 +
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> FY24 Budget and Workplan </h2>
 +
|-
 +
|style="color:#000;"|
 +
 
 +
*[[Media:Memo from Wayne - continuation of GCDAMP workplan wgp.pdf| Memo from Wayne - continuation of GCDAMP workplan in FY24.pdf ]]
 +
 
 +
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY21-23 Triennial Budget and Workplan]] Page </h2>
 +
|-
 +
|style="color:#000;"|
 +
 
 +
*[[Media:GCMRC TWP2021-23 December2 2020 ApprovedBySecretary.pdf| Triennial Budget and Work Plan -- Fiscal Years 2021-2023 ]]
 +
*[[Media:20240125-AnnualReportingMeeting-ProceedingsFiscalYear2023-508-UCRO.pdf | GCMRC FY23 Annual Project Report]]
 +
*[https://www.usbr.gov/uc/progact/amp/twg/2023-01-26-twg-meeting/20230126-AnnualReportingMeeting-ProceedingsFY2022AnnualReportingMeeting-508-UCRO.pdf GCMRC FY22 Annual Project Report]
 +
*[http://gcdamp.com/images_gcdamp_com/e/ec/GCMRC_ANNUAL_REPORT_FY2021-FINAL_508.pdf GCMRC FY21 Annual Project Report]
 +
 
 +
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [http://gcdamp.com/index.php?title=FY18-20_GCMRC_Triennial_Budget_and_Workplan FY18-20 Triennial Budget and Workplan] Page </h2>
 
|-
 
|-
 
|style="color:#000;"|
 
|style="color:#000;"|
  
*[https://www.usbr.gov/uc/progact/amp/amwg/2017-09-20-amwg-meeting/Attach_04a.pdf Glen Canyon Dam Adaptive Management Program Triennial Budget and Work Plan— Fiscal Years 2018–2020, Final AMWG Draft: September 11, 2017 ]
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2017-09-20-amwg-meeting/Attach_04a.pdf Triennial Budget and Work Plan -- Fiscal Years 2018-2020  ]
 +
*[https://www.usbr.gov/uc/progact/amp/twg/2022-01-13-twg-meeting/20220113-SummaryReportPeerReview2020AnnualProjectReport-508-UCRO.pdf Summary Report of the Peer Review for the 2020 Annual Project Report]
 +
*[[Media:GCMRC FY20 ANNUAL REPORT-Final 12.18.2020.pdf | GCMRC FY20 Annual Project Report]]
 +
*[[Media:FY2019 GCMRC Annual Report-12-19-2019-FINAL.pdf | GCMRC FY19 Annual Project Report]]
 
*[[Media:FY2018 GCMRC Annual Report-FINAL 12-13-2018.pdf | GCMRC FY18 Annual Project Report]]
 
*[[Media:FY2018 GCMRC Annual Report-FINAL 12-13-2018.pdf | GCMRC FY18 Annual Project Report]]
  
 
|-
 
|-
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [http://gcdamp.com/index.php?title=FY_15-17_GCMRC_Triennial_Budget_and_Work_Plan FY15-17 GCMRC Triennial Budget and Workplan] </h2>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [http://gcdamp.com/index.php?title=FY_15-17_GCMRC_Triennial_Budget_and_Work_Plan FY15-17 Triennial Budget and Workplan] Page </h2>
 
|-
 
|-
 
|style="color:#000;"|
 
|style="color:#000;"|
  
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/TWP_rev_14aug01.pdf GCMRC Triennial Budget and Work Plan -- Fiscal Years 2015-2017]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/TWP_rev_14aug01.pdf Triennial Budget and Work Plan -- Fiscal Years 2015-2017]
 
*[[Media:GCMRC Annual Report 2017.pdf| GCMRC FY 2017 Annual Project Report ]]
 
*[[Media:GCMRC Annual Report 2017.pdf| GCMRC FY 2017 Annual Project Report ]]
 
*[[Media:GCMRC FY16 Annual Report.pdf| GCMRC FY 2016 Annual Project Report ]]
 
*[[Media:GCMRC FY16 Annual Report.pdf| GCMRC FY 2016 Annual Project Report ]]
Line 74: Line 104:
  
 
|-
 
|-
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [http://gcdamp.com/index.php?title=FY12-14_GCMRC_Biannual_Budget_and_Workplan FY13-14 GCMRC Biannual Budget and Workplan] </h2>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [http://gcdamp.com/index.php?title=FY12-14_GCMRC_Biannual_Budget_and_Workplan FY13-14 Biannual Budget and Workplan] Page </h2>
 
|-
 
|-
 
|style="color:#000;"|
 
|style="color:#000;"|
Line 82: Line 112:
  
 
|-
 
|-
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> FY11-12 GCMRC Biannual Budget and Workplan </h2>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY11-12 GCMRC Biannual Budget and Workplan]] Page </h2>
 
|-
 
|-
 
|style="color:#000;"|
 
|style="color:#000;"|
  
*[https://www.usbr.gov/uc/progact/amp/amwg/2011-08-24-amwg-meeting/Attach_10a.pdf AIF: Fiscal Year 2012 Budget and Workplan]
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2011-08-24-amwg-meeting/Attach_10b.pdf E-mail Message from Anne Castle, Subject: Response to Technical Work Group Budget Motion Final 8 18 11]
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2011-08-24-amwg-meeting/Attach_10d.pdf USBR Budget PPT]
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2011-08-24-amwg-meeting/Attach_10e.pdf USGS/GCMRC Budget ]
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2011-08-24-amwg-meeting/Attach_10f.pdf Science Advisors' Budget Review]
 
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2011-08-24-amwg-meeting/Attach_10g.pdf Glen Canyon Dam Adaptive Management Program Biennial Budget and Work Plan - Fiscal Years 2011-12]
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2011-08-24-amwg-meeting/Attach_10g.pdf Glen Canyon Dam Adaptive Management Program Biennial Budget and Work Plan - Fiscal Years 2011-12]
*[https://www.usbr.gov/uc/progact/amp/twg/2011-06-28-twg-meeting/Attach_03b.pdf Memo from Ted Melis and Glen Knowles Dated May 3, 2011, Subject: Summary of Proposed Revisions to the GCDAMP Workplan and Budget]
+
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_05a.pdf Appendix E, FY2011-12 Spreadsheet]
*[https://www.usbr.gov/uc/progact/amp/amwg/2011-05-18-amwg-meeting/Attach_07c.pdf Bureau of Reclamation Budget ]
+
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_05b.pdf GCMRC Proposed Budget PPT]
*[https://www.usbr.gov/uc/progact/amp/amwg/2011-05-18-amwg-meeting/Attach_07a.pdf FY12 Budget Development and Process]
+
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_05c.pdf John Hamill Memo Including Project Summary Table]
*[https://www.usbr.gov/uc/progact/amp/twg/2011-01-20-twg-meeting/Attach_05c.pdf FY11-12 Budget Assessment ]
+
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-08-24-amwg-meeting/Attach_08a.pdf Fiscal year 2011-12 Budget and Workplan]
+
|-
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-08-24-amwg-meeting/Attach_08b.pdf Fiscal Year 2011-12 Budget and Workplan Dated June 11, 2010]
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY10 GCMRC Budget and Workplan]] Page </h2>
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-08-24-amwg-meeting/Attach_08c.pdf Biennial Budget and Work Plan Fiscal Years 2011-12 TWG Actions]
+
|-
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-08-24-amwg-meeting/Attach_08d.pdf Bureau of Reclamation Budget Overview]
+
|style="color:#000;"|
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-08-24-amwg-meeting/Attach_08e.pdf USGS/GCMRC Budget Overview]
+
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-08-24-amwg-meeting/Attach_10.pdf FY2011-12 Budget Discussion (includes hand voting results)]
+
*[https://www.usbr.gov/uc/progact/amp/twg/2009-03-16-twg-meeting/Attach_08b.pdf BAHG FY2010 Preliminary Budget Recommendation to the TWG dated March 6, 2009]
*[https://www.usbr.gov/uc/progact/amp/twg/2010-06-29-twg-meeting/Attach_09a.pdf Glen Canyon Dam Adaptive Management Program Biennial Budget and Work Plan - Fiscal Years 2011-2012, TWG Review Draft dated June 11, 2010]
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_05.pdf FY2010 Mid-year Expenditures: 1) FY2010 Bureau of Reclamation Mid-year Expenditures and FY2010 GCMRC Mid-year Expenditures]
*[https://www.usbr.gov/uc/progact/amp/twg/2010-06-29-twg-meeting/Attach_09b.pdf Revised Budget Spreadsheet dated June 28, 2010 with GCMRC Recommended Redirection of Funds]
+
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_04b.pdf Process and Approximate Schedule for FY10-11 Recovery Program Work Planning]
*[https://www.usbr.gov/uc/progact/amp/twg/2010-06-29-twg-meeting/Attach_09c.pdf GCMRC Proposed FY11-12 Biennial Budget and Work Plan]
+
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-05-06-amwg-meeting-cc/Attach_01.pdf Memo Anne Castle dated May 5, 2010, Subj: AMWG Webinar on the FY11-12 Budget]
+
|-
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-05-06-amwg-meeting-cc/Attach_02a.pdf AIF: Proposed New Budget Process (includes GCDAMP Biennial Budget Process Paper]
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY09 GCMRC Budget and Workplan]] Page </h2>
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-05-06-amwg-meeting-cc/Attach_03a.pdf AIF: FY11-12 Preliminary Budget]
+
|-
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-05-06-amwg-meeting-cc/Attach_03b.pdf AMWG Stakeholders' Priorities and Comments: FY11-12 Budget and Budget Process]
+
|style="color:#000;"|
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-05-06-amwg-meeting-cc/Attach_03c.pdf Memo from Dennis Kubly and FY11-12 Spreadsheet]
+
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-05-06-amwg-meeting-cc/Attach_03d.pdf Overview of Reclamation's Proposed Budget PPT]
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_19.pdf AIF: FY2009 Final Expenditures and USBR Report]
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-05-06-amwg-meeting-cc/Attach_03e.pdf Memo from John Hamill dated April 6, 2010 with attachments]
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_20.pdf FY2009 Expenditures for USGS]
*[https://www.usbr.gov/uc/progact/amp/amwg/2010-05-06-amwg-meeting-cc/Attach_03f.pdf Table 1: Potential Additional Revenue Sources to Support the FY2011-12 GCDAMP Budget and Table 2: Potential Budget Impacts of Implementing Several Major Deferred Projects]
+
 
 +
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY08 GCMRC Budget and Workplan]] Page </h2>
 +
|-
 +
|style="color:#000;"|
  
 
|}
 
|}
Line 128: Line 157:
 
*[http://gcdamp.com/index.php?title=GCDAMP_BAHG_Page Budget AdHoc Group Page]
 
*[http://gcdamp.com/index.php?title=GCDAMP_BAHG_Page Budget AdHoc Group Page]
 
*[[GCDAMP Planning]] Page
 
*[[GCDAMP Planning]] Page
 +
*[https://gcdamp.com/index.php/Portal:GCDAMP_Knowlege_Assessments Annual Reporting and Knowledge Assessment Page]
 
*[[GCDAMP and NPS River Trips and Field Activities]]
 
*[[GCDAMP and NPS River Trips and Field Activities]]
  
Line 135: Line 165:
 
|style="color:#000;"|
 
|style="color:#000;"|
  
 +
*[https://www.usbr.gov/uc/progact/amp/twg/2016-10-18-twg-meeting/Attach_09b.pdf TWP Protocol Paper (10-6-2016)]
 +
*[[Media:2020.02.05 - AMWG Approved TWP protocol - Table 1 for 2021-2023 - 508.pdf| TWP Protocol Table 1 update (3-6-2019)]]
 
*[[Media:AMP Funding Considerations 2017-01-26.pdf| Presentation given by Rod Smith on AMP funding considerations to the AMWG 2017-01-26]]
 
*[[Media:AMP Funding Considerations 2017-01-26.pdf| Presentation given by Rod Smith on AMP funding considerations to the AMWG 2017-01-26]]
*[https://www.usbr.gov/uc/progact/amp/twg/2016-10-18-twg-meeting/Attach_09b.pdf GCDAMP Triennial Budget and Workplan Protocol Paper (10-6-2016)]
 
  
 
|-
 
|-
Line 150: Line 181:
 
|style="color:#000;"|
 
|style="color:#000;"|
  
'''2018'''
+
'''2023'''
*[https://www.usbr.gov/uc/progact/amp/twg/2018-04-23-twg-meeting/Attach_11c.pdf GCMRC Budget and Work Plan Update PPT]
+
*[https://www.usbr.gov/uc/progact/amp/twg/2023-11-08-twg-meeting/20231108-GlenCanyonDamAdaptiveManagementProgramBudgetPriorities-508-UCRO.pdf Glen Canyon Dam Adaptive Management Program Budget Priorities]
*[https://www.usbr.gov/uc/progact/amp/twg/2018-04-23-twg-meeting/Attach_11b.pdf FY 18-20 Budget Update PPT]
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2023-08-17-amwg-meeting/20230817-TWGBudgetMotion-508-UCRO.pdf TWG Budget Motion]
*[https://www.usbr.gov/uc/progact/amp/twg/2018-04-23-twg-meeting/Attach_11a.pdf State of the Budget and Work Plan and Consideration of Potential Changes to the Fiscal Year 2 Triennial Work Plan PPT]
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2023-08-17-amwg-meeting/20230817-GCDAMPBudgetWorkPlanReclamation-508-UCRO.pdf GCDAMP Budget and Work Plan: Reclamation]
 +
*[https://www.usbr.gov/uc/progact/amp/amwg/2023-08-17-amwg-meeting/20230817-GCMRCFY24GCDAMPBudgetOverview-508-UCRO.pdf GCMRC FY24 GCDAMP Budget Overview]
 +
*[https://www.usbr.gov/uc/progact/amp/amwg/2023-08-17-amwg-meeting/20230817-FY2024BudgetWorkPlanRecommentationInformation-508-UCRO.pdf FY 2024 Budget and Work Plan Recommendation Information]
  
'''2017'''
+
'''2022'''
*[https://www.usbr.gov/uc/progact/amp/twg/2017-01-26-twg-meeting/A9_Shanahan.pdf Upcoming Budget and Group Exercise]
+
*[https://www.usbr.gov/uc/progact/amp/pdfs/20200205-AMWGApprovedTriennialBudgetWorkPlan2021-2023-508.pdf GCDAMP Triennial Budget and Work Plan Process ]
*[https://www.usbr.gov/uc/progact/amp/twg/2017-01-26-twg-meeting/A8_Smith.pdfAdaptive Management Program Funding Considerations ]
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2022-02-10-amwg-meeting/20220210-ReclamationBudgetProcess-508-UCRO.pdf Reclamation Budget Process ]
*[https://www.usbr.gov/uc/progact/amp/twg/2017-01-26-twg-meeting/A7_Shanahan.pdf As Requested by the AMWG, Review the FY17 Budget]
+
*[https://www.usbr.gov/uc/progact/amp/twg/2017-01-26-twg-meeting/A5_Shanahan.pdf AMWG Request to Review Potential Budget Changes]
+
  
 
'''2016'''
 
'''2016'''
Line 165: Line 196:
 
*[https://www.usbr.gov/uc/progact/amp/twg/2016-10-18-twg-meeting/Attach_09a.pdf Triennial Work Plan Budget Process]
 
*[https://www.usbr.gov/uc/progact/amp/twg/2016-10-18-twg-meeting/Attach_09a.pdf Triennial Work Plan Budget Process]
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2016-08-24-amwg-meeting/Attach_04.pdf Technical Work Group (TWG) Report: Triennial Budget Process Development]
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2016-08-24-amwg-meeting/Attach_04.pdf Technical Work Group (TWG) Report: Triennial Budget Process Development]
 
'''2014'''
 
*[https://www.usbr.gov/uc/progact/amp/twg/2014-10-28-twg-meeting/Attach_05a.pdf GCDAMP Biennial Budget Process Approved by the AMWG on 5/6/10]
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2014-08-27-amwg-meeting/Attach_06e.pdf USGS Facilities in Flagstaff ]
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2014-05-27-amwg-meeting/Attach_02b.pdf Memo from Anne Castle Dated May 7, 2014, to Jack Schmidt (GCMRC) and Glen Knowles (USBR), Subject: GCDAMP Triennial Budget and Work Plan]
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2014-05-27-amwg-meeting/Attach_02f.pdf SBSC Facililties and Overhead PPT]
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2014-02-19-amwg-meeting/Attach_10a.pdf Glen Canyon Dam Adaptive Management Program FY2015-16 Budget and GCDAMP Biennial Budget Process Approved by AMWG on 5/6/10]
 
*[https://www.usbr.gov/uc/progact/amp/twg/2014-01-30-twg-meeting/Attach_04b.pdf GCDAMP Biennial Budget Process Paper dated May 6, 2010]
 
*[https://www.usbr.gov/uc/progact/amp/twg/2014-01-30-twg-meeting/Attach_04c.pdf Streamlined GCMRC Biennial Work Planning Process – Amended on March 20, 2011, Table 1]
 
 
'''2013'''
 
*[https://www.usbr.gov/uc/progact/amp/amwg/2013-08-08-amwg-meeting/Attach_10a.pdf Fiscal Year 2014 Budget and Work Plan]
 
 
'''2012'''
 
*[https://www.usbr.gov/uc/progact/amp/twg/2012-02-02-twg-meeting/Attach_05a.pdf GCDAMP Biennial Budget Process Approved by the AMWG on May 6, 2010]
 
*[https://www.usbr.gov/uc/progact/amp/twg/2012-02-02-twg-meeting/Attach_05b.pdf Status Review ]
 
  
 
'''2011'''
 
'''2011'''
Line 187: Line 202:
  
 
'''2010'''
 
'''2010'''
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_05.pdf FY2010 Mid-year Expenditures: 1) FY2010 Bureau of Reclamation Mid-year Expenditures and FY2010 GCMRC Mid-year Expenditures]
 
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10may06CC/Attach_02b.pdf GCDAMP Biennial Budget Process Paper Approved by the AMWG on May 6, 2010]
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10may06CC/Attach_02b.pdf GCDAMP Biennial Budget Process Paper Approved by the AMWG on May 6, 2010]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_04a.pdf TWG Biennial Process Paper]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_04a.pdf TWG Biennial Process Paper]
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_04b.pdf Process and Approximate Schedule for FY10-11 Recovery Program Work Planning]
 
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_04c.pdf GCDAMP Biennial Process Paper Approved by the AMWG on May 6, 2010]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_04c.pdf GCDAMP Biennial Process Paper Approved by the AMWG on May 6, 2010]
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_05a.pdf Appendix E, FY2011-12 Spreadsheet]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_05b.pdf GCMRC Proposed Budget PPT]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_05c.pdf John Hamill Memo Including Project Summary Table]
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_19.pdf AIF: FY2009 Final Expenditures and USBR Report]
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_20.pdf FY2009 Expenditures for USGS]
 
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10jan21/Attach_03a.pdf GCDAMP Biennial Budget Process Paper]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10jan21/Attach_03a.pdf GCDAMP Biennial Budget Process Paper]
  
 
'''2009'''
 
'''2009'''
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09sep29/Attach_13.pdf AIF: Biennial Budget Process Development with Biennial Budget Process, Draft Outline for TWG Review]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09sep29/Attach_13.pdf AIF: Biennial Budget Process Development with Biennial Budget Process, Draft Outline for TWG Review]
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09sep29/Attach_07.pdf Fiscal Year 2009 Project Report for the GCDAMP Template]
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_08f.pdf Memo from Dennis Kuby dated 6/21/09, Subj: Proposed Biennial Budget and Work Plan to Support the GCDAMP in Fiscal Years FY2010-22]
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_07a.pdf AIF - FY2009 Mid-year Expenditures]
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_07b.pdf BOR Expenses through June 30, 2009]
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_07c.pdf Public Outreach AHG Budget Process Report]
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_07d.pdf USGS Expenses through July 6, 2009]
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_08a.pdf FY2010-11 Draft Budget, Worplan, and Hydrograph]
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_08f.pdf Memo from Dennis Kuby dated 6/21/09, Subj: Proposed Biennial Budget and Work Plan to Support the GCDAMP in Fiscal Yars FY2010-22]
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_08g.pdf Memo from John Hamill dated 7/14/09, Subj: Biennial Work Plan to Support the GCDAMP Fiscal Year 2010-11 and PPT]
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_08h.pdf GCDAMP Status of Experimental Funds FY2008-12]
+
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_08j.pdf Budget Motion and Proposed Amendments]
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_08j.pdf Budget Motion and Proposed Amendments]
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_07a.pdf AIF: Biennial Budget Project Development and GCDAMP Preliminary Biennial Draft Budget for FY 2010-11]
 
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_07b.pdf GCMRC Response to Budget Motions from the AMWG Meeting held April 29-30, 2009]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_07b.pdf GCMRC Response to Budget Motions from the AMWG Meeting held April 29-30, 2009]
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_07d.pdf GCMRC's FY2010-11 Biennial Work Plan for the GCDAMP PPT]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_07e.pdf GCDAMP Status of Experimental Funds - FY2008-12]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_07f.pdf Budget AHG Report, FY2010-11 Budget and Workplan Preparation]
 
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_11.pdf Biennial Budget Process Discussion Paper]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_11.pdf Biennial Budget Process Discussion Paper]
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_12.pdf Appendix E = FY 10 GCMRC GCDAMP Budget Revised June 18, 2009; FY11 GCMRC GCDAMP Budget Revised June 18, 2009; and FY 09, 10, 11 GCMRC Summary]
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_07a.pdf AIF: Final FY08 Expenditures and Carryover, and FY09 CPI Increas]
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_07b.pdf Memo from John Hamill dated 3/25/09, Subj: GCMRC's Final FY2008 Expenditure Report and Allocation of FY2008 Carryover Funds and FY2009 CPI Funds (w/3 attachments) and PPT]
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_07c.pdf Reclamation FY08 Carryover and FY09 Underfunding Reallocation with PPT]
 
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_08a.pdf Budget Discussion Procedures]
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_08a.pdf Budget Discussion Procedures]
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_08b.pdf AIF: Review of FY10-11 Priorities, Preliminary Budget, and Hydrograph (Draft FY10-11 GCAMP Budget spreadsheet at end of document]
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_08c.pdf FY 2010-11 Budget TWG Actions PPT]
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_08d.pdf GCMRC's GCDAMP Preliminary FY 2010-11 Budget PPT]
 
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_16.pdf Interagency Agreement #06-AA-40-2458 Between the Bureau of Reclamation and the National Park Service, Grand Canyon National Park, Glen Canyon Dam Adaptive Management Program, Grand Canyon Research Permit Facilitation and Environmental Compliance, December 2008 Annual Report (This has to do with work identified in FY08 budget)]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09mar16/Attach_07a.pdf AIF: FY2010-11 Preliminary Budget with BAHG Recommendation to TWG dated March 6, 2009]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09mar16/Attach_07b.pdf Bureau of Reclamation FY 08 Carryover and FY 09 Underfunding Reallocation]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09mar16/Attach_07c.pdf Memo from John Hamill dated March 6, 2009, Subject: Allocation of FY 2008 Carryover Funds and FY2009]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09mar16/Attach_07e.pdf USBR FY2010-11 Preliminary Budget PPT]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09mar16/Attach_08a.pdf Memo from John Hamill dated 2/13/09, Subject: Preliminary Fiscal Year 2010-11 GCDAMP Budget]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09mar16/Attach_08b.pdf BAHG FY2010 Preliminary Budget Recommendation to the TWG dated March 6, 2009]
 
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09mar16/Attach_09a.pdf FY2010-11 Preliminary Budget Recommendation to the Adaptive Management Work Group dated March 17, 2009]
 
  
 
|-
 
|-
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Other Stuff</h2>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Funding the Glen Canyon Dam Adaptive Management Program </h2>
 
|-
 
|-
 
|style="color:#000;"|
 
|style="color:#000;"|
  
*Experimental fund: Monitoring and Research Plan page 8: In 2003, the GCDAMP established a fund to pay for experimental research projects so that they can be conducted without financially impacting other aspects of the science program. The current balance of the experimental fund at the end of the FY2007 is anticipated to be approximately $900,000. An additional $500,000 will be set aside by the GCMRC annually in an account at Reclamation to fund the BHBF tests and other research related to experimental efforts.1 Deposits to the experimental account will cease when the balance reaches $2.5 million.
+
The GCDAMP activities that are eligible for funding from power revenues are those actions related to dam operations or the mitigation of dam operations within the CRE. These will be funded in compliance with Section 204 of Public Law (PL) 106-377. Appropriated funds or other sources of funding may also be used for GCDAMP activities as specified in Section 1808 of the GCPA and Section 204 of PL 106-377. [https://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf]
 +
 
 +
[[Media:PLAW-106publ377 (Sec204-AMP cap).pdf| PUBLIC LAW 106–377—APPENDIX B 114 STAT. 1441A–68-69: "The Cap Language" ]]<br>
 +
SEC. 204. <br>
 +
'''(a) IN GENERAL.''' For fiscal year 2001 and each
 +
fiscal year thereafter, the Secretary of the Interior shall continue
 +
funding, from power revenues, the activities of the Glen Canyon
 +
Dam Adaptive Management Program as authorized by section 1807
 +
of the Grand Canyon Protection Act of 1992 (106 Stat. 4672),
 +
at not more than $7,850,000 (October 2000 price level), adjusted
 +
in subsequent years to reflect changes in the Consumer Price Index
 +
for All Urban Consumers published by the Bureau of Labor Statistics
 +
of the Department of Labor.<br>
 +
'''(b) VOLUNTARY CONTRIBUTIONS.''' Nothing in this section precludes
 +
the use of voluntary financial contributions (except power
 +
revenues) to the Adaptive Management Program that may be
 +
authorized by law.<br>
 +
'''(c) ACTIVITIES TO BE FUNDED.''' The activities to be funded
 +
as provided under subsection (a) include activities required to meet
 +
the requirements of section 1802(a) and subsections (a) and (b)
 +
of section 1805 of the Grand Canyon Protection Act of 1992 (106
 +
Stat. 4672), including the requirements of the Biological Opinion
 +
on the Operation of Glen Canyon Dam and activities required
 +
by the Programmatic Agreement on Cultural and Historic Properties,
 +
to the extent that the requirements and activities are consistent
 +
with the Grand Canyon Protection Act of 1992 (106 Stat.
 +
4672).<br>
 +
'''(d) ADDITIONAL FUNDING.''' To the extent that funding under
 +
subsection (a) is insufficient to pay the costs of the monitoring
 +
and research and other activities of the Glen Canyon Dam Adaptive
 +
Management Program, the Secretary of the Interior may use funding
 +
from other sources, including funds appropriated for that purpose.
 +
All such appropriated funds shall be nonreimbursable and
 +
nonreturnable.<br>
 +
 
 +
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Experimental Fund </h2>
 +
|-
 +
|style="color:#000;"|
 +
 
 +
In 2003, the GCDAMP established a fund to pay for experimental research projects so that they can be conducted without financially impacting other aspects of the science program. The current balance of the experimental fund at the end of the FY2007 is anticipated to be approximately $900,000. An additional $500,000 will be set aside by the GCMRC annually in an account at Reclamation to fund the BHBF tests and other research related to experimental efforts. Deposits to the experimental account will cease when the balance reaches $2.5 million.[http://gcdamp.com/index.php?title=Monitoring_and_Research_Plan Monitoring and Research Plan, page 8]
 +
 
 +
If the funds allocated to the Experimental Management Fund are not needed in
 +
a given year, at the end of the year, they will be transferred to the Native Fish
 +
Conservation Contingency Fund (Reclamation project C.6); some year-end
 +
experimental management funds may also be allocated to the Contingency
 +
Fund for NHPA Section 106 Compliance (Reclamation project D.10). [https://www.usbr.gov/uc/progact/amp/amwg/2017-09-20-amwg-meeting/Attach_04e.pdf]
 +
 
 +
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_08h.pdf GCDAMP Status of Experimental Funds FY2008-12]
 +
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_07e.pdf GCDAMP Status of Experimental Funds - FY2008-12]
 +
 
 +
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Native Fish Conservation Contingency Fund </h2>
 +
|-
 +
|style="color:#000;"|
 +
 
 +
“The goal of this budget item is to ensure that funds are
 +
available for native fish conservation actions or nonnative
 +
fish control the event this conservation action is needed for
 +
endangered humpback chub…”[https://www.usbr.gov/uc/progact/amp/amwg/2017-09-20-amwg-meeting/Attach_04e.pdf]
 +
*Projected balance at end of FY 17: ~$1,400,000 [https://www.usbr.gov/uc/progact/amp/amwg/2017-09-20-amwg-meeting/Attach_04e.pdf]
 +
 
 +
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> New USGS Flagstaff Science Building and Overhead Projection </h2>
 +
|-
 +
|style="color:#000;"|
  
 +
*Occupancy agreement between USGS, City of Flagstaff, and GSA signed in April 2019
 +
*Occupancy start of FY2021 at earliest, overhead may increase some during planning and construction
 +
*FY2020 overhead on GCDAMP funds: Current projection ~16%, pass-through rate = 3.0%
 +
*Overhead on GCDAMP funds to ~26% upon occupancy [https://www.usbr.gov/uc/progact/amp/amwg/2019-05-22-amwg-meeting/20190522-FiscalYear2020ProposedBudget-Presentation-508-UCRO.pdf]
  
 
|}
 
|}

Latest revision as of 14:27, 25 September 2024


FY25-27TWP.png

GCDAMP Budget and Work Plan


The goal of the Triennial Budget and Workplan (TWP) is to reduce the effort expended on the budget process while improving the effectiveness of the Grand Canyon Monitoring and Research Center (GCMRC), Technical Work Group (TWG), and AMWG. The GCDAMP will develop a TWP the first year of the process. Then, in the second year the GCDAMP would implement the year-two budget and make relatively minor corrections primarily related to changes in CPI and needs at GCMRC and the Bureau of Reclamation. In the third year the GCDAMP would consider minor changes to the year three budget to allow for changes in projects or potential important new starts not envisioned during the development of the triennial budget.

The major components of the TWP would include:

  • Three-year budget spreadsheets, work plans, and hydrographs,
  • Modifications of the year-three budget based on specific criteria,
  • Fiscal reporting, including expenditures for the previous fiscal year (mid-year and end end-of year reports),
  • Project progress reports, including an annual reporting meeting in January, and
  • Utilization of the Budget Ad Hoc Group (BAHG) to interface with Reclamation and GCMRC in developing a draft TWP, and to help the TWG develop budget recommendations for AMWG consideration.
GCDAMP Strategic Plan
The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions.
LTEMP Science Plan
The LTEMP Science Plan describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to DOI, its bureaus, and to the GCDAMP in support of implementation of LTEMP.
Core Monitoring Plan
The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources.
Monitoring and Research Plan
The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next 5 years to address some of the strategic science questions associated with AMWG priority questions.
Budget and Work Plan
The GCMRC Triennial Work Plan (TWP) identifies the scope, objectives, and budget for monitoring and research activities planned for a 3-year period. When completed, the TWP will be consistent with the MRP.

Triennial Budget and Workplans

FY25-27 Triennial Budget and Workplan Page


FY24 Budget and Workplan

FY21-23 Triennial Budget and Workplan Page

FY18-20 Triennial Budget and Workplan Page

FY15-17 Triennial Budget and Workplan Page

FY13-14 Biannual Budget and Workplan Page

FY11-12 GCMRC Biannual Budget and Workplan Page

FY10 GCMRC Budget and Workplan Page

FY09 GCMRC Budget and Workplan Page

FY08 GCMRC Budget and Workplan Page


Links

Documents and Direction

Science Questions and Information Needs

Papers and Presentation

2023

2022

2016

2011

2010

2009

Funding the Glen Canyon Dam Adaptive Management Program

The GCDAMP activities that are eligible for funding from power revenues are those actions related to dam operations or the mitigation of dam operations within the CRE. These will be funded in compliance with Section 204 of Public Law (PL) 106-377. Appropriated funds or other sources of funding may also be used for GCDAMP activities as specified in Section 1808 of the GCPA and Section 204 of PL 106-377. [1]

PUBLIC LAW 106–377—APPENDIX B 114 STAT. 1441A–68-69: "The Cap Language"
SEC. 204.
(a) IN GENERAL. For fiscal year 2001 and each fiscal year thereafter, the Secretary of the Interior shall continue funding, from power revenues, the activities of the Glen Canyon Dam Adaptive Management Program as authorized by section 1807 of the Grand Canyon Protection Act of 1992 (106 Stat. 4672), at not more than $7,850,000 (October 2000 price level), adjusted in subsequent years to reflect changes in the Consumer Price Index for All Urban Consumers published by the Bureau of Labor Statistics of the Department of Labor.
(b) VOLUNTARY CONTRIBUTIONS. Nothing in this section precludes the use of voluntary financial contributions (except power revenues) to the Adaptive Management Program that may be authorized by law.
(c) ACTIVITIES TO BE FUNDED. The activities to be funded as provided under subsection (a) include activities required to meet the requirements of section 1802(a) and subsections (a) and (b) of section 1805 of the Grand Canyon Protection Act of 1992 (106 Stat. 4672), including the requirements of the Biological Opinion on the Operation of Glen Canyon Dam and activities required by the Programmatic Agreement on Cultural and Historic Properties, to the extent that the requirements and activities are consistent with the Grand Canyon Protection Act of 1992 (106 Stat. 4672).
(d) ADDITIONAL FUNDING. To the extent that funding under subsection (a) is insufficient to pay the costs of the monitoring and research and other activities of the Glen Canyon Dam Adaptive Management Program, the Secretary of the Interior may use funding from other sources, including funds appropriated for that purpose. All such appropriated funds shall be nonreimbursable and nonreturnable.

Experimental Fund

In 2003, the GCDAMP established a fund to pay for experimental research projects so that they can be conducted without financially impacting other aspects of the science program. The current balance of the experimental fund at the end of the FY2007 is anticipated to be approximately $900,000. An additional $500,000 will be set aside by the GCMRC annually in an account at Reclamation to fund the BHBF tests and other research related to experimental efforts. Deposits to the experimental account will cease when the balance reaches $2.5 million.Monitoring and Research Plan, page 8

If the funds allocated to the Experimental Management Fund are not needed in a given year, at the end of the year, they will be transferred to the Native Fish Conservation Contingency Fund (Reclamation project C.6); some year-end experimental management funds may also be allocated to the Contingency Fund for NHPA Section 106 Compliance (Reclamation project D.10). [2]

Native Fish Conservation Contingency Fund

“The goal of this budget item is to ensure that funds are available for native fish conservation actions or nonnative fish control the event this conservation action is needed for endangered humpback chub…”[3]

  • Projected balance at end of FY 17: ~$1,400,000 [4]

New USGS Flagstaff Science Building and Overhead Projection

  • Occupancy agreement between USGS, City of Flagstaff, and GSA signed in April 2019
  • Occupancy start of FY2021 at earliest, overhead may increase some during planning and construction
  • FY2020 overhead on GCDAMP funds: Current projection ~16%, pass-through rate = 3.0%
  • Overhead on GCDAMP funds to ~26% upon occupancy [5]