|
|
Line 46: |
Line 46: |
| |class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | | |class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| |
| {|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | | {|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" |
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;">AMWG Charter (2017) [http://gcdamp.com/images_gcdamp_com/3/3e/2017_AMWG_Charter.pdf]</h2> | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;"> [https://www.usbr.gov/uc/progact/amp/amwg/2010-02-03-amwg-meeting/Attach_04.pdf The Role of AMWG] </h2> |
− | |-
| + | |
− | |style="color:#000;"|
| + | |
− | | + | |
− | '''Committees Official Designation.''' Glen Canyon Dam Adaptive Management Work Group (AMWG).
| + | |
− | | + | |
− | '''Authority.''' The Grand Canyon Protection Act (Act) of October 30, 1992. Public Law 102-575;
| + | |
− | Federal Advisory Committee Act (FACA), as amended, 5 U.S.C. Appendix 2.
| + | |
− | | + | |
− | '''Objectives and Scope of Activities.''' The Glen Canyon Dam Adaptive Management Program
| + | |
− | (AMP) provides for monitoring the results of the operating criteria and plans adopted by the
| + | |
− | Secretary of the Interior (Secretary), and for research and studies to suggest appropriate changes
| + | |
− | to those plans and operating criteria.
| + | |
− | | + | |
− | The AMP includes the AMWG. The AMWG provides advice and recommendations to the
| + | |
− | Secretary relative to the operation of Glen Canyon Dan, the Secretary's Designee is the
| + | |
− | Assistant Secretary for Water and Science who serves as the Chair. The AMWG recommends
| + | |
− | suitable monitoring and research programs and makes recommendations to the Secretary. The
| + | |
− | AMWG may recommend research and monitoring proposals outside the Act which complement
| + | |
− | the AMP process, but such proposals will be funded separately, and shall not deter from the
| + | |
− | focus of the Act.
| + | |
− | | + | |
− | Under Section 1802(a) of the Act, "[t]he Secretary shall operate Glen Canyon Dam in
| + | |
− | accordance with the additional criteria and operating plans specified in Section 1804 [of the
| + | |
− | Act] and exercise other authorities under existing law in such a manner as to protect, mitigate
| + | |
− | adverse impacts to, and improve the values for which Grand Canyon National Park and Glen
| + | |
− | Canyon National Recreation Area were establish, including but not limited to, natural and
| + | |
− | cultural resources and visitor use." Under Section 1 802(b) of the Act, [t]he Secretary shall
| + | |
− | implement this section of the Act in a manner fully consistent with and subject to the Colorado
| + | |
− | River Compact, the Upper Colorado River Basin Compact, the Water Treaty of 1944 with
| + | |
− | Mexico, the decree of the Supreme Court in Arizona v. California, and the provisions of the
| + | |
− | Colorado River Storage Project Act of 1956 and the Colorado River Basin Project Act of 1968
| + | |
− | that govern allocation, appropriation, development, and exportation of the waters of the
| + | |
− | Colorado River basin.”
| + | |
− | | + | |
− | '''Description of Duties.''' The duties or roles and functions of the AMWG are in an advisory capacity only. They are to:
| + | |
− | *Establish AMWG operating procedures.
| + | |
− | *Advise the Secretary in meeting environmental and cultural commitments including those contained in the Record of Decision for the Glen Canyon Dam Long-Term Experiment and Management Plan Final Environmental Impact Statement and subsequent related decisions.
| + | |
− | *Recommend the framework for the AMP policy, goals, and direction.
| + | |
− | *Recommend resource management objectives for development and implementation of a long-term monitoring plan and any necessary research and studies required to determine the effect of the operation of Glen Canyon Dam on the values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established, including but not limited to, natural and cultural resources and visitor use.
| + | |
− | *Review and provide input on the report identified in the Act to the Secretary, the Congress, and the Governors of the Colorado River Basin States. This annual report includes discussion on dam operations, the operation of the AMP, status of resources, and measures taken to protect, mitigate, and improve the resources defined in the Act.
| + | |
− | *Annually review long-term monitoring data to provide advice on the status of resources and whether the AMP goals and objectives are being met.
| + | |
− | *Review and provide input on all AMP activities undertaken to comply with applicable laws, including permitting requirements.
| + | |
− | | + | |
− | '''Agency or Official to Whom the Committee Reports.''' The AMWG reports to the Secretary through the Secretary’s Designee.
| + | |
− | | + | |
− | '''Support.''' The logistical and support services for the meetings of the AMWG will be provided by the Bureau of Reclamation.
| + | |
− | | + | |
− | '''Estimated Annual Operating Costs and Staff Years.''' The estimated annual operating costs associated with supporting the AMWG's functions are $400,000 including all direct and indirect expenses. It is estimated that four FTE’s will be required to support the AMWG.
| + | |
− | | + | |
− | '''Designated Federal Officer.''' The DFO is the Bureau of Reclamation, Upper Colorado Region, Regional Director who is a full-time Federal employee appointed in accordance with Agency Procedures. The DFO or alternate will approve or call all AMWG and subcommittee meetings, prepare and approve all meeting agendas, attend all AMWG and subcommittee meetings, adjourn any meetings when the DFO determines adjournment to be in the public interest and chair meetings when directed to do so by the Secretary.
| + | |
− | | + | |
− | '''Estimated Number and Frequency of Meetings.''' The AMWG is expected to meet approximately twice a year, and at such other times as designated by the DFO.
| + | |
− | | + | |
− | '''Duration.''' Continuing
| + | |
− | | + | |
− | '''Termination.''' The AMWG will terminate 2 years from the date the charter is filed, unless prior to that date, it is renewed in accordance with the provisions of Section 14 of the FACA. The AMWG will not meet or take any action without a valid current charter.
| + | |
− | | + | |
− | '''Membership and Designation.''' Members and alternate members of the AMWG appointed by the Secretary will be comprised of but not limited to the following: <br>
| + | |
− | Secretary’s Designee, who will serve as Chairperson for the AMWG. <br>
| + | |
− | One representative each from the following entities:
| + | |
− | * The Secretary of Energy (Western Area Power Administration)
| + | |
− | * Arizona Game and Fish Department
| + | |
− | * Hopi Tribe
| + | |
− | * Hualapai Tribe
| + | |
− | * Navajo Nation
| + | |
− | * San Juan Southern Paiute Tribe
| + | |
− | * Southern Paiute Consortium
| + | |
− | * Pueblo of Zuni
| + | |
− | One representative each from the Governors from the seven basin States:
| + | |
− | * Arizona
| + | |
− | * California
| + | |
− | * Colorado
| + | |
− | * Nevada
| + | |
− | * New Mexico
| + | |
− | * Utah
| + | |
− | * Wyoming
| + | |
− | Representatives each from the general public as follows:
| + | |
− | * Two from environmental organizations
| + | |
− | * Two from the recreation industry
| + | |
− | * Two from contractors who purchase Federal power from Glen Canyon Powerplant
| + | |
− | One representative from each of the following DOI agencies as ex-officio non-voting members:
| + | |
− | * Bureau of Reclamation
| + | |
− | * Bureau of Indian Affairs
| + | |
− | * U.S. Fish and Wildlife Service
| + | |
− | * National Park Service
| + | |
− | | + | |
− | Members will be appointed to the AMWG by the Secretary, with input and recommendations
| + | |
− | from the above-referenced agencies, States, tribes, contractors for Federal power from Glen
| + | |
− | Canyon Dam, environmental organizations, and other stakeholders. Each member may also
| + | |
− | recommend an alternate member for appointment by the Secretary. Members and alternates of
| + | |
− | the AMWG will be appointed for a 3-year term.
| + | |
− | | + | |
− | Members of the AMWG serve without compensation, except that the DFO, in his or her sole
| + | |
− | discretion, may choose to allow compensation for the Technical Work Group subcommittee
| + | |
− | Chairperson according to applicable authorities. While away from their homes or regular places
| + | |
− | of business, members engaged in AMWG or subcommittee business approved by the DFO may
| + | |
− | be allowed travel expenses including per diem in lieu of subsistence in the same manner as
| + | |
− | persons employed intermittently in Government Service under Section 5703 of Title 5 of the
| + | |
− | United States Code.
| + | |
− | | + | |
− | A vacancy on the AMWG will be filled in the same manner in which the original appointment
| + | |
− | was made.
| + | |
− | | + | |
− | '''Ethics Responsibility.''' No AMWG member, alternate member, or subcommittee member will
| + | |
− | participate in any specific party matter including a lease, license, permit, contract, claim,
| + | |
− | agreement, or related litigation with the Department in which the member has a direct financial
| + | |
− | interest.
| + | |
− | | + | |
− | '''Subcommittees.''' Subject to the DFO’s approval, subcommittees may be formed for the purpose
| + | |
− | of compiling information or conducting research. However, such subcommittees must act only
| + | |
− | under the direction of the DFO and must report their recommendations to the full AMWG for
| + | |
− | consideration. Subcommittees must not provide advice or work products directly to the Agency.
| + | |
− | Subcommittees will meet as necessary to accomplish their assignments, subject to the approval
| + | |
− | of the DFO and the availability of resources.
| + | |
− | | + | |
− | '''Recordkeeping.''' The records of the AMWG, and formally and informally established
| + | |
− | subcommittees of the AMWG, shall be handled in accordance with General Records
| + | |
− | Schedule 6.2 or other approved Agency records disposition schedule. These records shall be
| + | |
− | available for public inspection and copying, subject to the Freedom of Information Act,
| + | |
− | 5 U.S.C. 552.
| + | |
− | | + | |
− | |}
| + | |
− | | + | |
− | | + | |
− | <!--
| + | |
− | | + | |
− | --------------------------------ADDITIONAL------------------------------->
| + | |
− | |class="MainPageBG" style="width:45%; border:1px solid #cedff2; background:#f5faff; vertical-align:top;"|
| + | |
− | {| width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;"
| + | |
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Links</h2>
| + | |
− | |-
| + | |
− | |style="color:#000;"|
| + | |
− | | + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg.html Reclamation AMWG page]
| + | |
− | *[http://gcdamp.com/index.php?title=GCDAMP_RAHG_Page Roles Ad-Hoc Group (RAHG)]
| + | |
− | | + | |
− | |-
| + | |
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Documents </h2>
| + | |
− | |-
| + | |
− | |style="color:#000;"|
| + | |
− | | + | |
− | *[[Media:2017 AMWG Charter.pdf| AMWG Charter (2017)]]
| + | |
− | *[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/16aug24/OP_Procedures_11aug19.pdf AMWG Operating Procedures (2016)]
| + | |
− | *[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/16aug24/11_Charter_15aug24.pdf AMWG Charter (2015)]
| + | |
− | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/12feb22/Attach_02.pdf AMWG Operating Procedures (2011)]
| + | |
− | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_07.pdf Glen Canyon Dam Adaptive Management Work Group Charter (2010)]
| + | |
− | | + | |
− | |-
| + | |
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Making a Section 508 Compliant Document </h2>
| + | |
− | |-
| + | |
− | |style="color:#000;"|
| + | |
− | | + | |
− | *[[Media:Making a Section 508 Compliant Document.docx| Making a Section 508 Compliant Document ]]
| + | |
− | *[[Media:20191022-TWG508Compliance-Presentation-508-UCRO.pdf| Section 508 compliance presentation ]]
| + | |
− | *[[Media:20191000-Section508ComplianceHandout-508-Stone.pdf| Section 508 compliance handout ]]
| + | |
− | | + | |
− | |-
| + | |
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Presentations and Papers</h2>
| + | |
− | |-
| + | |
− | |style="color:#000;"|
| + | |
− | | + | |
− | '''2020'''
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-11-17-amwg-meeting/20201117-AMWG-FinalAgenda-508-UCRO.pdf Final Meeting Agenda ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-11-17-amwg-meeting/20201117-AMWG-ActionItemsMotions-508-UCRO.pdf Action Items, Motions and Votes ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-AMWG-FinalAgenda-508-UCRO.pdf Final Meeting Agenda ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-AMWG-FinalMotionsActionItems-508-UCRO.pdf Final Action Items, Motions, and Votes ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-AMWG-DraftMeetingMinutes-508-UCRO.pdf Draft Meeting Minutes – August 19-20, 2020 ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20201908-DRAFT2021AMWGMeetingSchedule.pdf Draft 2021 AMWG Meeting Schedule ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20201908-ActionItemTrackingSheet.pdf Action Item Tracking Report ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200814-AMWG-MemberStatusUpdate-508-UCRO.pdf AMWG Membership Update ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-AMWG-MeetingPacket-508-UCRO.pdf AMWG Meeting Packet ]
| + | |
− | *[https://www.usbr.gov/uc/DocLibrary/EnvironmentalImpactStatements/LakePowellPipeline/docs/20200709-LPPVirtualPublicMeeting-Presentation-508-PAO.pdf Lake Powell Pipeline Project - Public Meeting presentation ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-AMWGUpdates.pdf Glen Canyon Dam Adaptive Management Work Group Update]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-05-20-amwg-meeting/20200520-AMWGNominationInfo-508-UCRO.pdf AMWG Appointments & Reappointments ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-05-20-amwg-meeting/20200520-AMWG-FinalAgenda-508-UCRO.pdf Final Meeting Agenda ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-05-20-amwg-meeting/20200520-AMWG-FinalMeetingMinutes-508-UCRO.pdf Final meeting minutes – May 20, 2020 ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-05-20-amwg-meeting/20200520-AMWG-ActionItemTrackingReport-508-UCRO.pdf Action Item Tracking Report ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-02-12-amwg-meeting/20200212-AMWG-FinalAgenda-508-UCRO.pdf Final Meeting Agenda ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-02-12-amwg-meeting/20200212-AMWG-FinalMeetingPacket-508-UCRO.pdf Meeting Packet ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-02-12-amwg-meeting/20200206-AMWG-ActionItemTrackingSheet-508-UCRO.pdf Action Item Tracking Sheet ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-02-12-amwg-meeting/20200212-AMWG-FinalMeetingMinutes-508-UCRO.pdf Final meeting minutes – Feb. 12-13, 2020 ]
| + | |
− | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-02-12-amwg-meeting/20200212-AMWG-MemberNominationsStatusUpdate-508-UCRO.pdf Member Nominations Status Update ]
| + | |
− | | + | |
− | '''2009'''
| + | |
− | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09sep29/Attach_04b.pdf Motions and Votes from the last AMWG Meeting (August 12-13, 2009)]
| + | |
− | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_02e.pdf Letter from the Seven Colorado River Basin States Representatives to the Glen Canyon Dam Adaptive Management Work Group dated 2/23/09, Subj: Decision Making Process Associated with the Glen Canyon Dam Operations and GCAMP]
| + | |
− | | + | |
− | |-
| + | |
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">The Role of AMWG [https://www.usbr.gov/uc/progact/amp/amwg/2010-02-03-amwg-meeting/Attach_04.pdf] </h2>
| + | |
| |- | | |- |
| |style="color:#000;"| | | |style="color:#000;"| |
Line 471: |
Line 282: |
| DOI response in writing to the AMWG within 45 working days of the AMWG meeting. A written status | | DOI response in writing to the AMWG within 45 working days of the AMWG meeting. A written status |
| report will be provided if a final DOI decision is not reached within the 45 working day process. | | report will be provided if a final DOI decision is not reached within the 45 working day process. |
| + | |
| + | |} |
| + | |
| + | |
| + | <!-- |
| + | |
| + | --------------------------------ADDITIONAL-------------------------------> |
| + | |class="MainPageBG" style="width:45%; border:1px solid #cedff2; background:#f5faff; vertical-align:top;"| |
| + | {| width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" |
| + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Links</h2> |
| + | |- |
| + | |style="color:#000;"| |
| + | |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg.html Reclamation AMWG page] |
| + | *[http://gcdamp.com/index.php?title=GCDAMP_RAHG_Page Roles Ad-Hoc Group (RAHG)] |
| + | |
| + | |- |
| + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Documents </h2> |
| + | |- |
| + | |style="color:#000;"| |
| + | |
| + | *[[Media:2017 AMWG Charter.pdf| AMWG Charter (2017)]] |
| + | *[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/16aug24/OP_Procedures_11aug19.pdf AMWG Operating Procedures (2016)] |
| + | *[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/16aug24/11_Charter_15aug24.pdf AMWG Charter (2015)] |
| + | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/12feb22/Attach_02.pdf AMWG Operating Procedures (2011)] |
| + | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_07.pdf Glen Canyon Dam Adaptive Management Work Group Charter (2010)] |
| + | |
| + | |- |
| + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Presentations and Papers</h2> |
| + | |- |
| + | |style="color:#000;"| |
| + | |
| + | '''2020''' |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-11-17-amwg-meeting/20201117-AMWG-FinalAgenda-508-UCRO.pdf Final Meeting Agenda ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-11-17-amwg-meeting/20201117-AMWG-ActionItemsMotions-508-UCRO.pdf Action Items, Motions and Votes ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-AMWG-FinalAgenda-508-UCRO.pdf Final Meeting Agenda ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-AMWG-FinalMotionsActionItems-508-UCRO.pdf Final Action Items, Motions, and Votes ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-AMWG-DraftMeetingMinutes-508-UCRO.pdf Draft Meeting Minutes – August 19-20, 2020 ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20201908-DRAFT2021AMWGMeetingSchedule.pdf Draft 2021 AMWG Meeting Schedule ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20201908-ActionItemTrackingSheet.pdf Action Item Tracking Report ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200814-AMWG-MemberStatusUpdate-508-UCRO.pdf AMWG Membership Update ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-AMWG-MeetingPacket-508-UCRO.pdf AMWG Meeting Packet ] |
| + | *[https://www.usbr.gov/uc/DocLibrary/EnvironmentalImpactStatements/LakePowellPipeline/docs/20200709-LPPVirtualPublicMeeting-Presentation-508-PAO.pdf Lake Powell Pipeline Project - Public Meeting presentation ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-AMWGUpdates.pdf Glen Canyon Dam Adaptive Management Work Group Update] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-05-20-amwg-meeting/20200520-AMWGNominationInfo-508-UCRO.pdf AMWG Appointments & Reappointments ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-05-20-amwg-meeting/20200520-AMWG-FinalAgenda-508-UCRO.pdf Final Meeting Agenda ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-05-20-amwg-meeting/20200520-AMWG-FinalMeetingMinutes-508-UCRO.pdf Final meeting minutes – May 20, 2020 ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-05-20-amwg-meeting/20200520-AMWG-ActionItemTrackingReport-508-UCRO.pdf Action Item Tracking Report ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-02-12-amwg-meeting/20200212-AMWG-FinalAgenda-508-UCRO.pdf Final Meeting Agenda ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-02-12-amwg-meeting/20200212-AMWG-FinalMeetingPacket-508-UCRO.pdf Meeting Packet ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-02-12-amwg-meeting/20200206-AMWG-ActionItemTrackingSheet-508-UCRO.pdf Action Item Tracking Sheet ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-02-12-amwg-meeting/20200212-AMWG-FinalMeetingMinutes-508-UCRO.pdf Final meeting minutes – Feb. 12-13, 2020 ] |
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-02-12-amwg-meeting/20200212-AMWG-MemberNominationsStatusUpdate-508-UCRO.pdf Member Nominations Status Update ] |
| + | |
| + | '''2009''' |
| + | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09sep29/Attach_04b.pdf Motions and Votes from the last AMWG Meeting (August 12-13, 2009)] |
| + | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_02e.pdf Letter from the Seven Colorado River Basin States Representatives to the Glen Canyon Dam Adaptive Management Work Group dated 2/23/09, Subj: Decision Making Process Associated with the Glen Canyon Dam Operations and GCAMP] |
| + | |
| + | |- |
| + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [http://gcdamp.com/images_gcdamp_com/3/3e/2017_AMWG_Charter.pdf AMWG Charter (2017)] </h2> |
| + | |- |
| + | |style="color:#000;"| |
| + | |
| + | '''Committees Official Designation.''' Glen Canyon Dam Adaptive Management Work Group (AMWG). |
| + | |
| + | '''Authority.''' The Grand Canyon Protection Act (Act) of October 30, 1992. Public Law 102-575; |
| + | Federal Advisory Committee Act (FACA), as amended, 5 U.S.C. Appendix 2. |
| + | |
| + | '''Objectives and Scope of Activities.''' The Glen Canyon Dam Adaptive Management Program |
| + | (AMP) provides for monitoring the results of the operating criteria and plans adopted by the |
| + | Secretary of the Interior (Secretary), and for research and studies to suggest appropriate changes |
| + | to those plans and operating criteria. |
| + | |
| + | The AMP includes the AMWG. The AMWG provides advice and recommendations to the |
| + | Secretary relative to the operation of Glen Canyon Dan, the Secretary's Designee is the |
| + | Assistant Secretary for Water and Science who serves as the Chair. The AMWG recommends |
| + | suitable monitoring and research programs and makes recommendations to the Secretary. The |
| + | AMWG may recommend research and monitoring proposals outside the Act which complement |
| + | the AMP process, but such proposals will be funded separately, and shall not deter from the |
| + | focus of the Act. |
| + | |
| + | Under Section 1802(a) of the Act, "[t]he Secretary shall operate Glen Canyon Dam in |
| + | accordance with the additional criteria and operating plans specified in Section 1804 [of the |
| + | Act] and exercise other authorities under existing law in such a manner as to protect, mitigate |
| + | adverse impacts to, and improve the values for which Grand Canyon National Park and Glen |
| + | Canyon National Recreation Area were establish, including but not limited to, natural and |
| + | cultural resources and visitor use." Under Section 1 802(b) of the Act, [t]he Secretary shall |
| + | implement this section of the Act in a manner fully consistent with and subject to the Colorado |
| + | River Compact, the Upper Colorado River Basin Compact, the Water Treaty of 1944 with |
| + | Mexico, the decree of the Supreme Court in Arizona v. California, and the provisions of the |
| + | Colorado River Storage Project Act of 1956 and the Colorado River Basin Project Act of 1968 |
| + | that govern allocation, appropriation, development, and exportation of the waters of the |
| + | Colorado River basin.” |
| + | |
| + | '''Description of Duties.''' The duties or roles and functions of the AMWG are in an advisory capacity only. They are to: |
| + | *Establish AMWG operating procedures. |
| + | *Advise the Secretary in meeting environmental and cultural commitments including those contained in the Record of Decision for the Glen Canyon Dam Long-Term Experiment and Management Plan Final Environmental Impact Statement and subsequent related decisions. |
| + | *Recommend the framework for the AMP policy, goals, and direction. |
| + | *Recommend resource management objectives for development and implementation of a long-term monitoring plan and any necessary research and studies required to determine the effect of the operation of Glen Canyon Dam on the values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established, including but not limited to, natural and cultural resources and visitor use. |
| + | *Review and provide input on the report identified in the Act to the Secretary, the Congress, and the Governors of the Colorado River Basin States. This annual report includes discussion on dam operations, the operation of the AMP, status of resources, and measures taken to protect, mitigate, and improve the resources defined in the Act. |
| + | *Annually review long-term monitoring data to provide advice on the status of resources and whether the AMP goals and objectives are being met. |
| + | *Review and provide input on all AMP activities undertaken to comply with applicable laws, including permitting requirements. |
| + | |
| + | '''Agency or Official to Whom the Committee Reports.''' The AMWG reports to the Secretary through the Secretary’s Designee. |
| + | |
| + | '''Support.''' The logistical and support services for the meetings of the AMWG will be provided by the Bureau of Reclamation. |
| + | |
| + | '''Estimated Annual Operating Costs and Staff Years.''' The estimated annual operating costs associated with supporting the AMWG's functions are $400,000 including all direct and indirect expenses. It is estimated that four FTE’s will be required to support the AMWG. |
| + | |
| + | '''Designated Federal Officer.''' The DFO is the Bureau of Reclamation, Upper Colorado Region, Regional Director who is a full-time Federal employee appointed in accordance with Agency Procedures. The DFO or alternate will approve or call all AMWG and subcommittee meetings, prepare and approve all meeting agendas, attend all AMWG and subcommittee meetings, adjourn any meetings when the DFO determines adjournment to be in the public interest and chair meetings when directed to do so by the Secretary. |
| + | |
| + | '''Estimated Number and Frequency of Meetings.''' The AMWG is expected to meet approximately twice a year, and at such other times as designated by the DFO. |
| + | |
| + | '''Duration.''' Continuing |
| + | |
| + | '''Termination.''' The AMWG will terminate 2 years from the date the charter is filed, unless prior to that date, it is renewed in accordance with the provisions of Section 14 of the FACA. The AMWG will not meet or take any action without a valid current charter. |
| + | |
| + | '''Membership and Designation.''' Members and alternate members of the AMWG appointed by the Secretary will be comprised of but not limited to the following: <br> |
| + | Secretary’s Designee, who will serve as Chairperson for the AMWG. <br> |
| + | One representative each from the following entities: |
| + | * The Secretary of Energy (Western Area Power Administration) |
| + | * Arizona Game and Fish Department |
| + | * Hopi Tribe |
| + | * Hualapai Tribe |
| + | * Navajo Nation |
| + | * San Juan Southern Paiute Tribe |
| + | * Southern Paiute Consortium |
| + | * Pueblo of Zuni |
| + | One representative each from the Governors from the seven basin States: |
| + | * Arizona |
| + | * California |
| + | * Colorado |
| + | * Nevada |
| + | * New Mexico |
| + | * Utah |
| + | * Wyoming |
| + | Representatives each from the general public as follows: |
| + | * Two from environmental organizations |
| + | * Two from the recreation industry |
| + | * Two from contractors who purchase Federal power from Glen Canyon Powerplant |
| + | One representative from each of the following DOI agencies as ex-officio non-voting members: |
| + | * Bureau of Reclamation |
| + | * Bureau of Indian Affairs |
| + | * U.S. Fish and Wildlife Service |
| + | * National Park Service |
| + | |
| + | Members will be appointed to the AMWG by the Secretary, with input and recommendations |
| + | from the above-referenced agencies, States, tribes, contractors for Federal power from Glen |
| + | Canyon Dam, environmental organizations, and other stakeholders. Each member may also |
| + | recommend an alternate member for appointment by the Secretary. Members and alternates of |
| + | the AMWG will be appointed for a 3-year term. |
| + | |
| + | Members of the AMWG serve without compensation, except that the DFO, in his or her sole |
| + | discretion, may choose to allow compensation for the Technical Work Group subcommittee |
| + | Chairperson according to applicable authorities. While away from their homes or regular places |
| + | of business, members engaged in AMWG or subcommittee business approved by the DFO may |
| + | be allowed travel expenses including per diem in lieu of subsistence in the same manner as |
| + | persons employed intermittently in Government Service under Section 5703 of Title 5 of the |
| + | United States Code. |
| + | |
| + | A vacancy on the AMWG will be filled in the same manner in which the original appointment |
| + | was made. |
| + | |
| + | '''Ethics Responsibility.''' No AMWG member, alternate member, or subcommittee member will |
| + | participate in any specific party matter including a lease, license, permit, contract, claim, |
| + | agreement, or related litigation with the Department in which the member has a direct financial |
| + | interest. |
| + | |
| + | '''Subcommittees.''' Subject to the DFO’s approval, subcommittees may be formed for the purpose |
| + | of compiling information or conducting research. However, such subcommittees must act only |
| + | under the direction of the DFO and must report their recommendations to the full AMWG for |
| + | consideration. Subcommittees must not provide advice or work products directly to the Agency. |
| + | Subcommittees will meet as necessary to accomplish their assignments, subject to the approval |
| + | of the DFO and the availability of resources. |
| + | |
| + | '''Recordkeeping.''' The records of the AMWG, and formally and informally established |
| + | subcommittees of the AMWG, shall be handled in accordance with General Records |
| + | Schedule 6.2 or other approved Agency records disposition schedule. These records shall be |
| + | available for public inspection and copying, subject to the Freedom of Information Act, |
| + | 5 U.S.C. 552. |
| + | |
| + | |- |
| + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Making a Section 508 Compliant Document </h2> |
| + | |- |
| + | |style="color:#000;"| |
| + | |
| + | *[[Media:Making a Section 508 Compliant Document.docx| Making a Section 508 Compliant Document ]] |
| + | *[[Media:20191022-TWG508Compliance-Presentation-508-UCRO.pdf| Section 508 compliance presentation ]] |
| + | *[[Media:20191000-Section508ComplianceHandout-508-Stone.pdf| Section 508 compliance handout ]] |
| | | |
| |} | | |} |
|
AMWG role, authority, and relationships
The AMWG Charter makes it clear that AMWG’s role is to make formal recommendations to the
Secretary of the Interior: The committee will provide advice and recommendations to the Secretary of the Interior.
(Kempthorne, 2008, p. 1). The duties or roles and functions of the AMWG are in an advisory capacity only (Kempthorne,
2008, p. 2). The Charter and AMWG and TWG Operating Procedures have been established to accomplish this
role. The AMWG must follow the role established by the Charter, making formal recommendations to the
Secretary of the Interior using the processes described in the Operating Procedures.
Collaboration
According to Yaffee and Wondolleck (2000), collaboration leads to better decisions that are more
likely to be implemented and better prepares agencies and stakeholders for future challenges. By
building interpersonal and inter-organizational linkages, managers are better informed and their
choices about future direction are more likely to solve the problem at hand. Programs are more likely
to be implemented successfully if they are supported by stakeholders. Collaborative approaches
have also been adopted as a means of building trust and ending policy, institutional, scientific, and
legal impasses.
Beginning in FY09, hold regular (annual or biennial) workshops/retreats to build trust among
AMP participants and to address internal operations, roles, and effectiveness. At the AMP’s
first retreat in 2004, the attendees defined the internal issues that they most wanted to address:
clarification of roles, responsibilities, and interactions among the various parts of the AMP (AMWG,
TWG, GCMRC, and Science Advisors). The FY09 retreat or workshop should continue the
improvement of internal operations by focusing on the issues that resonate the most with the
attendees. These may include some or all of the following topics:
Ensure that all parties clearly understand the interests of every other party. If collaboration
involves making sure that every party’s interests are served, then everyone involved must
understand the other parties’ interests.
Discuss whether there is a balanced range of interests willing and able to participate, and
if not, how to ensure it. For a collaborative process to be perceived as legitimate, it must
involve a balanced range of participants with diverse perspectives. Some AMWG members are
able to (or choose to) participate more actively than others do. Are there impediments to active
participation that could be addressed? In addition, some stakeholders feel disenfranchised
Establish a full time Executive Coordinator/Manager for the Program. A program as technically,
politically, and structurally complex as the AMP needs a lot of focused attention to be successful. A
full time Executive Coordinator/Manager is needed to lead the Program, facilitate timely resolution of
differences among parties, and ensure that those operating protocols are fairly and consistently
enforced at all levels of the Program. An Executive Coordinator/Manager would also relieve the
Secretary’s Designee of the burden for day-to-day management of the AMP. Several models exist for
this type of position that could be evaluated to determine what would best meet the needs of the AMP
and the Department of the Interior. In addition, the specific duties and authorities of the position
would need to be carefully defined.
Utilize facilitation and mediation expertise more broadly throughout the AMP. Sophisticated
process design, facilitation, and mediation expertise is needed for a collaborative process to
effectively address complex controversial issues involving the many diverse interests represented on
the AMP and that have a long history of conflict. Currently the AMWG utilizes a professional
facilitator for all of its meetings; a professional facilitator should be similarly utilized for TWG
meetings.
The Secretary’s Designee will emphasize the development of consensus for motions
proposed by AMWG members. A consensus decision means that the interests of all the members
of the AMWG were taken into account. If consensus is emphasized, it will encourage AMWG
members to look for ways to address all those interests. To put this into effect, the Secretary’s
Designee will ask parties that disagree on a motion to resolve their differences before or during the
meeting. In addition, all action items will be scheduled for the first day of the meeting, allowing time
for stakeholders to resolve any remaining differences either over lunch or between the first and
second days of the meeting. (Alternatively, longer meetings could be scheduled to allow much of this
negotiation and discussion to occur during the meeting instead of before.)
Develop a process for evaluating tradeoffs among conflicting or competing goals. One of the
biggest challenges of the AMP is to synthesize the large amounts of scientific and other technical
information to evaluate the tradeoffs of alternative courses of action. Adequate time is needed to
allow stakeholders to understand, discuss, and/or rank options. In addition, over the past decade,
AMWG distinction from TWG
The goal is to have TWG thoroughly discuss technical and scientific aspects of issues that will come
before AMWG. The AMWG should not duplicate the work of the TWG, but rely on their efforts and
technical expertise.
As a rule, technical reviews and deliberation will occur at the TWG meetings. As described in Issue
11, this will involve an evaluation of the technical pros and cons of reasonable options. This
technical analysis will help AMWG understand the basis for the TWG recommendations and will
serve as companion information to the AMWG evaluation of policy implications.
For each AMWG agenda item for which there is a TWG recommendation, the TWG chair or designee
will present a summary of the TWG’s work and its recommendation before discussion or action by
AMWG.
AMWG members should be adequately briefed by their TWG members before each AMWG meeting
as described in Issue #17. This will allow AMWG to rely on the TWG for technical reviews and
recommendations, and focus on policy options and tradeoffs as recommendations are evaluated.
Acting on TWG recommendations
The AMWG will discuss and consider all TWG recommendations.
Planning and scheduling work
A 1-year schedule will be developed for AMWG and TWG by the chairs of each group, which clearly
shows all essential regular items that need to be addressed every year, plus other items that have
been added by AMWG. This schedule will include the original timeframe for the tasks plus the status
of each task.
Final approval of annual plans of work and meeting schedules for the AMWG, TWG, and SAs will be
developed and incorporated into the AMP Biennial Work Plan (BWP), which traditionally has only
contained the GCMRC Annual Plan of Work. Reclamation will have the responsibility to develop and
update a composite annual meeting schedule and summary table of annual plans of work for all AMP
entities. AMWG will approve the programs and schedule in its summer meeting.
Assignments to TWG and requests to GCMRC
The GCMRC Chief and TWG Chair will attend all AMWG meetings with a clear understanding of their
workload and deadlines so they can respond during discussions to AMWG requests. The AMWG will
focus on providing clear recommendations to DOI. As the AMWG considers recommendations or
requests to the TWG or GCMRC, the TWG Chair and GCMRC Chief will review any actions that
involve them to ensure the action and timeframe is clear. If possible, the GCMRC Chief and TWG
Chair will determine at the meeting the feasibility of addressing the AMWG’s request.
Recommendations that are not addressed directly at the meeting will be reviewed by the TWG Chair
and GCMRC Chief and responded to after the meeting. Conflicts in workload that cannot be resolved
by the GCMRC or the TWG within current budgeting or staffing will be reported to the Secretary’s
Designee who will determine how best to respond to the AMWG request.
AMWG authority over agencies
The AMWG has no authority over any individual AMP member, including GCMRC.
The Secretary of the Interior established the AMP with four key elements: AMWG, TWG,
GCMRC, and the IRP (Independent Review Panel). The four have distinct roles, but ultimately
the Secretary of the Interior is responsible for seeing that the monitoring and necessary research
is done to evaluate the impacts of adjustments made to dam operations. . . . The AMWG can
recommend [emphasis in original] studies and priorities for implementing individual studies
during those reviews, preferably by consensus. However, final decisions as to the
management of Interior facilities and resources, what studies to implement, when, and using
funds from which sources remain, by statute, with the Secretary of the Interior and the
appropriate Interior agencies. (Loveless, 2000, p. 6).
The Congress finds and declares that the function of advisory committees should be advisory
only, and that all matters under their consideration should be determined, in accordance with law,
by the official, agency, or officer involved. (Federal Advisory Committee Act, 1972, Section 2(b)).
AMWG does have authority to charge subcommittees or work groups, such as the TWG, with
assignments.
The AMWG may have workgroups or subgroups that the Committee and the Secretary’s
Designee deems [sic] necessary for the purpose of compiling information or conducting research.
(Kempthorne, 2008, p. 4).
Individual comments, although appreciated and sometimes requested, are advisory only and do not
constitute direction to GCMRC or TWG. No formal direction is given to TWG without consensus or a
vote by AMWG. No formal direction is given to GCMRC without consensus or a vote by AMWG, and
approval of such by the Secretary’s Designee.
Free-flowing discussion and interaction are important to the program, and informal, individual
feedback to GCMRC is welcome, particularly when requested. However, GCMRC decides, as an
agent of the Secretary of the Interior responsible for the AMP science program, what input to
incorporate into its program, unless and until the input is an AMWG recommendation that has been
accepted by the Secretary of the Interior.
This means that in order for AMWG to give direction to GCMRC, it must make a recommendation to
the Secretary. See Issue # 10 for a new process for these recommendations.
Note that when TWG is given an assignment from AMWG, the GCMRC would also usually be
involved. In these cases, an AMWG recommendation to the Secretary may be required to obtain
GCMRC involvement. Actions by AMWG such as an assignment to TWG that would not include
GCMRC involvement, or establishment of an Ad Hoc Group, would not need a recommendation to
the Secretary.
AMWG decision making
The AMWG operating procedures require attempting consensus before going to a vote. After a
motion is made and seconded, AMWG members will modify the motion as needed through discussion
in order to attain consensus.
The Secretary’s Designee will eventually test if consensus has been attained by asking the group if
there is any objection to consensus on the motion. If there is none, the motion will be recorded as
adopted by consensus. If there is an objection to consensus, the Secretary’s Designee will either ask
that the group continue to attempt to attain consensus, or will call for a vote. The vote will be by roll
call.
According to Robert’s Rules of Order, a member who abstains has chosen not to vote, and
abstentions do not affect the outcome of the vote (except that they reduce the number of persons
voting on that particular motion, which reduces the number of votes needed to reach the 2/3
supermajority). Thus, abstentions do not block consensus recommendations, and if a roll call vote is
taken and everyone who voted cast an affirmative vote, the vote will be considered unanimous even if
there were abstentions.
Conflicts of interest
While it would be preferable that stakeholder groups have no financial interest in TWG or AMWG
recommendations, in a practical sense this is impossible. To comply with Federal procurement
regulations, the following approach will be used:
- AMWG will provide Federal agencies with broad program advice and recommendations through the organized FACA process.
- After program and budget approval by the Secretary of the Interior, GCMRC or Reclamation will issue requests for proposals (RFPs) to solicit specific monitoring and research proposals to meet program needs. However, in some cases, limited competition and sole-source contracts may be used. (See Issue #22 for more detail.)
- GCMRC will fund proposals based on an independent peer review and comment process. The Department of the Interior has recently promulgated new ethics guidelines for FACA committees, and the Charter and Operating Protocols have been modified to reflect these guidelines. In general, these guidelines state the AMWG, TWG, or subcommittee members are prohibited in participating in specific matters in which the individual member has a direct financial interest.
Measures of success
To clarify progress in meeting its responsibilities, the AMP will define measures of success. Adaptive
Management: The U.S. Department of Interior Technical Guide (Williams, et al., 2007) suggests using the
following four criteria for measuring success in an adaptive management program:
A. Stakeholders are actively involved and committed to the process.
B. Progress is made toward achieving management objectives.
C. Results from monitoring and assessment are used to adjust and improve management decisions.
D. Implementation is consistent with applicable laws.
In order to measure whether progress is being made toward achieving management objectives (B above),
the AMWG will recommend to the Secretary targets (desired future conditions) for the management
objectives in the AMP strategic plan. These targets, needed to guide and focus science and
management activities as well as to measure success in the program, will be incorporated into the AMWG
strategic plan.
|
The Role of the Secretary’s Designee [1]
|
Currently, all AMWG recommendations made to the Secretary are transmitted verbatim in a
memorandum from the Secretary’s Designee to the Secretary, with copies to the AMWG.
The Secretary’s Designee will formally transmit AMWG recommendations to the Secretary within 15
working days of the AMWG meeting in which the recommendations were made. Sufficient
background information, including any majority and/or minority reports, will be provided by the
Designee to fully inform DOI staff. Reclamation will develop guidelines for the development of
Majority and Minority reports, in consultation with the AMWG.
If the AMWG recommendation was by consensus or unanimous vote, the Secretary’s Designee will
have the authority to speak for the Secretary and respond positively back to the AMWG. If the
Designee sees potential adverse consequences, the Designee can refer the issue to the DOI
Assistant Secretaries or Bureaus for formulation of a DOI response to the AMWG.
If the AMWG recommendation was not unanimous, the Secretary’s Designee will consult with the
appropriate DOI agencies and/or Assistant Secretaries to formulate the DOI response.
In either event, the Secretary’s Designee will convey the outcome of these discussions and the final
DOI response in writing to the AMWG within 45 working days of the AMWG meeting. A written status
report will be provided if a final DOI decision is not reached within the 45 working day process.
|
|
Links
|
|
Documents
|
|
Presentations and Papers
|
2020
2009
|
|
Committees Official Designation. Glen Canyon Dam Adaptive Management Work Group (AMWG).
Authority. The Grand Canyon Protection Act (Act) of October 30, 1992. Public Law 102-575;
Federal Advisory Committee Act (FACA), as amended, 5 U.S.C. Appendix 2.
Objectives and Scope of Activities. The Glen Canyon Dam Adaptive Management Program
(AMP) provides for monitoring the results of the operating criteria and plans adopted by the
Secretary of the Interior (Secretary), and for research and studies to suggest appropriate changes
to those plans and operating criteria.
The AMP includes the AMWG. The AMWG provides advice and recommendations to the
Secretary relative to the operation of Glen Canyon Dan, the Secretary's Designee is the
Assistant Secretary for Water and Science who serves as the Chair. The AMWG recommends
suitable monitoring and research programs and makes recommendations to the Secretary. The
AMWG may recommend research and monitoring proposals outside the Act which complement
the AMP process, but such proposals will be funded separately, and shall not deter from the
focus of the Act.
Under Section 1802(a) of the Act, "[t]he Secretary shall operate Glen Canyon Dam in
accordance with the additional criteria and operating plans specified in Section 1804 [of the
Act] and exercise other authorities under existing law in such a manner as to protect, mitigate
adverse impacts to, and improve the values for which Grand Canyon National Park and Glen
Canyon National Recreation Area were establish, including but not limited to, natural and
cultural resources and visitor use." Under Section 1 802(b) of the Act, [t]he Secretary shall
implement this section of the Act in a manner fully consistent with and subject to the Colorado
River Compact, the Upper Colorado River Basin Compact, the Water Treaty of 1944 with
Mexico, the decree of the Supreme Court in Arizona v. California, and the provisions of the
Colorado River Storage Project Act of 1956 and the Colorado River Basin Project Act of 1968
that govern allocation, appropriation, development, and exportation of the waters of the
Colorado River basin.”
Description of Duties. The duties or roles and functions of the AMWG are in an advisory capacity only. They are to:
- Establish AMWG operating procedures.
- Advise the Secretary in meeting environmental and cultural commitments including those contained in the Record of Decision for the Glen Canyon Dam Long-Term Experiment and Management Plan Final Environmental Impact Statement and subsequent related decisions.
- Recommend the framework for the AMP policy, goals, and direction.
- Recommend resource management objectives for development and implementation of a long-term monitoring plan and any necessary research and studies required to determine the effect of the operation of Glen Canyon Dam on the values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established, including but not limited to, natural and cultural resources and visitor use.
- Review and provide input on the report identified in the Act to the Secretary, the Congress, and the Governors of the Colorado River Basin States. This annual report includes discussion on dam operations, the operation of the AMP, status of resources, and measures taken to protect, mitigate, and improve the resources defined in the Act.
- Annually review long-term monitoring data to provide advice on the status of resources and whether the AMP goals and objectives are being met.
- Review and provide input on all AMP activities undertaken to comply with applicable laws, including permitting requirements.
Agency or Official to Whom the Committee Reports. The AMWG reports to the Secretary through the Secretary’s Designee.
Support. The logistical and support services for the meetings of the AMWG will be provided by the Bureau of Reclamation.
Estimated Annual Operating Costs and Staff Years. The estimated annual operating costs associated with supporting the AMWG's functions are $400,000 including all direct and indirect expenses. It is estimated that four FTE’s will be required to support the AMWG.
Designated Federal Officer. The DFO is the Bureau of Reclamation, Upper Colorado Region, Regional Director who is a full-time Federal employee appointed in accordance with Agency Procedures. The DFO or alternate will approve or call all AMWG and subcommittee meetings, prepare and approve all meeting agendas, attend all AMWG and subcommittee meetings, adjourn any meetings when the DFO determines adjournment to be in the public interest and chair meetings when directed to do so by the Secretary.
Estimated Number and Frequency of Meetings. The AMWG is expected to meet approximately twice a year, and at such other times as designated by the DFO.
Duration. Continuing
Termination. The AMWG will terminate 2 years from the date the charter is filed, unless prior to that date, it is renewed in accordance with the provisions of Section 14 of the FACA. The AMWG will not meet or take any action without a valid current charter.
Membership and Designation. Members and alternate members of the AMWG appointed by the Secretary will be comprised of but not limited to the following:
Secretary’s Designee, who will serve as Chairperson for the AMWG.
One representative each from the following entities:
- The Secretary of Energy (Western Area Power Administration)
- Arizona Game and Fish Department
- Hopi Tribe
- Hualapai Tribe
- Navajo Nation
- San Juan Southern Paiute Tribe
- Southern Paiute Consortium
- Pueblo of Zuni
One representative each from the Governors from the seven basin States:
- Arizona
- California
- Colorado
- Nevada
- New Mexico
- Utah
- Wyoming
Representatives each from the general public as follows:
- Two from environmental organizations
- Two from the recreation industry
- Two from contractors who purchase Federal power from Glen Canyon Powerplant
One representative from each of the following DOI agencies as ex-officio non-voting members:
- Bureau of Reclamation
- Bureau of Indian Affairs
- U.S. Fish and Wildlife Service
- National Park Service
Members will be appointed to the AMWG by the Secretary, with input and recommendations
from the above-referenced agencies, States, tribes, contractors for Federal power from Glen
Canyon Dam, environmental organizations, and other stakeholders. Each member may also
recommend an alternate member for appointment by the Secretary. Members and alternates of
the AMWG will be appointed for a 3-year term.
Members of the AMWG serve without compensation, except that the DFO, in his or her sole
discretion, may choose to allow compensation for the Technical Work Group subcommittee
Chairperson according to applicable authorities. While away from their homes or regular places
of business, members engaged in AMWG or subcommittee business approved by the DFO may
be allowed travel expenses including per diem in lieu of subsistence in the same manner as
persons employed intermittently in Government Service under Section 5703 of Title 5 of the
United States Code.
A vacancy on the AMWG will be filled in the same manner in which the original appointment
was made.
Ethics Responsibility. No AMWG member, alternate member, or subcommittee member will
participate in any specific party matter including a lease, license, permit, contract, claim,
agreement, or related litigation with the Department in which the member has a direct financial
interest.
Subcommittees. Subject to the DFO’s approval, subcommittees may be formed for the purpose
of compiling information or conducting research. However, such subcommittees must act only
under the direction of the DFO and must report their recommendations to the full AMWG for
consideration. Subcommittees must not provide advice or work products directly to the Agency.
Subcommittees will meet as necessary to accomplish their assignments, subject to the approval
of the DFO and the availability of resources.
Recordkeeping. The records of the AMWG, and formally and informally established
subcommittees of the AMWG, shall be handled in accordance with General Records
Schedule 6.2 or other approved Agency records disposition schedule. These records shall be
available for public inspection and copying, subject to the Freedom of Information Act,
5 U.S.C. 552.
|
Making a Section 508 Compliant Document
|
|
|