Difference between revisions of "GCDAMP- HFE 2013"

From Glen Canyon Dam AMP
Jump to: navigation, search
Line 12: Line 12:
 
}}
 
}}
  
== HFE DETAILS ==
+
== 2013 High Flow Experiment Snapshot ==
+
*The 2013 HFE represents the '''2nd''' controlled high flow release conducted under the [http://gcdamp.com/index.php?title=The_HFE_Page HFE Protocol].
*Dates: '''November 11-16, 2013''' (Water Year 2014)
+
 
*Start Upramp: '''November 11, 9am '''
+
'''Schedule & Duration'''
*Open Bypass Tubes: '''November 11, 1pm '''
+
*November 11, 9am begin upramp to powerplant capacity
 +
*November 11, 1pm open bypass tubes
 
*Full Capacity: '''November 11, 8pm - November 15, 8pm'''
 
*Full Capacity: '''November 11, 8pm - November 15, 8pm'''
*Finish HFE: '''November 16, 3pm '''
+
*November 16, 3pm end of HFE
*Total HFE duration: '''96 hrs'''
+
*Total duration: 5 days & 5 hours ('''96 hours''' at peak release)
*Sediment in the system:  '''1,500,000 metric tons'''
+
 
*Units available: '''6'''  
+
'''Ramp Rates'''
*Powerplant capacity = '''~19,100 cfs'''  
+
*Ramp up: 4,000 cfs/hr from 5,000 - 19,100 cfs, then 3,750 cfs/hr to peak
*Peak CFS:  '''~34,100'''  
+
*Ramp down: 1,875 cfs/hr from 34,100 - 19,100 cfs, then 1,500 cfs/hr to 8,000 cfs
 +
 
 +
'''HFE Release Details'''
 +
*Maximum total release: '''~34,100 cfs'''
 +
*Powerplant capacity: 19,100 cfs
 +
*River outlet tubes: 15,000 cfs
 +
*Hydropower generation units available: 6
 +
*River outlet tubes: 4
 +
 
 +
'''Releases and Lake Elevation'''
 +
*Releases will range from 5,000 - 8,000 cfs prior to and after the HFE
 +
*Estimated acre feet of water bypassed during HFE:  '''~129 kaf'''
 
*November volume = '''670 kaf'''
 
*November volume = '''670 kaf'''
*Estimated acre feet of water bypassed during HFE:  '''approx. 129,000 af'''
+
 
*Hourly Releases before and after HFE:  fluctuate between '''5,000 to 8,000 cfs'''
+
'''Costs'''
*Initial estimate of costs to Hydropower:  '''$1.74 million'''
+
*Estimated costs to hydropower:  '''$1.74 million'''
*Actual cost to Hydropower:  [[Media:Financial Analysis of Experimental Flows Vol6 final 9 3 2015.docx |'''$2.593 million''']]
+
*Actual costs to hydropower:  [[Media:Financial Analysis of Experimental Flows Vol6 final 9 3 2015.docx |'''$2.593 million''']]
 
*Direct expenses for removal of concession assets:  '''$9,961'''
 
*Direct expenses for removal of concession assets:  '''$9,961'''
 
  
 
== SUPPORTING DOCUMENTS ==
 
== SUPPORTING DOCUMENTS ==
Line 51: Line 62:
  
 
== SEDIMENT ==
 
== SEDIMENT ==
 +
*Sediment in the system:  '''1,500,000 metric tons'''
 
[[File:2013 Paria inputs.jpg|400px]] <br> 2013 Paria River discharge and cumulative sand inputs
 
[[File:2013 Paria inputs.jpg|400px]] <br> 2013 Paria River discharge and cumulative sand inputs
 
* "The quality of sand available is huge, and to put it in perspective, there will be more sand AFTER this HFE (about 800,000 mt) than before last year's HFE (about 650,000 mt)." [GKnowles_TWG MM_131106]
 
* "The quality of sand available is huge, and to put it in perspective, there will be more sand AFTER this HFE (about 800,000 mt) than before last year's HFE (about 650,000 mt)." [GKnowles_TWG MM_131106]

Revision as of 15:16, 14 November 2016

High Flow Experiment- 2013
CRC 121119 0038.JPG

2013 High Flow Experiment Snapshot

  • The 2013 HFE represents the 2nd controlled high flow release conducted under the HFE Protocol.

Schedule & Duration

  • November 11, 9am begin upramp to powerplant capacity
  • November 11, 1pm open bypass tubes
  • Full Capacity: November 11, 8pm - November 15, 8pm
  • November 16, 3pm end of HFE
  • Total duration: 5 days & 5 hours (96 hours at peak release)

Ramp Rates

  • Ramp up: 4,000 cfs/hr from 5,000 - 19,100 cfs, then 3,750 cfs/hr to peak
  • Ramp down: 1,875 cfs/hr from 34,100 - 19,100 cfs, then 1,500 cfs/hr to 8,000 cfs

HFE Release Details

  • Maximum total release: ~34,100 cfs
  • Powerplant capacity: 19,100 cfs
  • River outlet tubes: 15,000 cfs
  • Hydropower generation units available: 6
  • River outlet tubes: 4

Releases and Lake Elevation

  • Releases will range from 5,000 - 8,000 cfs prior to and after the HFE
  • Estimated acre feet of water bypassed during HFE: ~129 kaf
  • November volume = 670 kaf

Costs

  • Estimated costs to hydropower: $1.74 million
  • Actual costs to hydropower: $2.593 million
  • Direct expenses for removal of concession assets: $9,961

SUPPORTING DOCUMENTS

COMPLIANCE

  • A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
  • DOI consultation meeting with the Basin States_ October 22, 2013.
  • Government to Government tribal consultation: Pueblo of Zuni_ September 10, 2013.
  • Government to Government tribal consultation: Navajo Nation_ September 11, 2013.

CONCERNS

  • Pueblo of Zuni: concern that multiple HFE's under the HFE protocol could result in power cost increases for individual rate payers.

Request to USBR made for detailed description on how the economic effects of multiple HFEs on power rate payers will be monitored.

SEDIMENT

  • Sediment in the system: 1,500,000 metric tons

2013 Paria inputs.jpg
2013 Paria River discharge and cumulative sand inputs

  • "The quality of sand available is huge, and to put it in perspective, there will be more sand AFTER this HFE (about 800,000 mt) than before last year's HFE (about 650,000 mt)." [GKnowles_TWG MM_131106]

ADDITIONAL




  • SVaderkooiFact Check on swimming pool comparison: Wikipedia Swimming pool size. Assuming a depth of 2 m, a 50 m x 25 m pool equals about 88,000 cubic feet. At peak Reclamation said the release from the dam was around 34,000 cfs so an olympic-sized pool would fill in about 2.6 s. Note that the USGS gage at Lees Ferry measured peak flow at about 37,000 cfs, so a little quicker (about 2.4 s) if you use that number.

Contributor: Category: Sediment, Recreation, Water delivery