Difference between revisions of "GCDAMP Budget"

From Glen Canyon Dam AMP
Jump to: navigation, search
 
(127 intermediate revisions by the same user not shown)
Line 17: Line 17:
 
</table>
 
</table>
  
[[File:MonopolyMan.jpg|400px]]
+
[[File:FY25-27TWP.png|center|600px| link=FY21-23 Triennial Budget and Workplan ]]
  
 
<!--
 
<!--
Line 24: Line 24:
 
|style="width:60%; font-size:120%;"|
 
|style="width:60%; font-size:120%;"|
  
The goal of the '''Triennial Workplan and Budget (TWP)''' is to reduce the effort expended on the budget process while improving the effectiveness of the Grand Canyon Monitoring and Research Center (GCMRC), Technical Work Group (TWG), and AMWG. The GCDAMP will develop a TWP the first year of the process. Then, in the second year the GCDAMP would implement the year-two budget and make relatively minor corrections primarily related to changes in CPI and needs at GCMRC and the Bureau of Reclamation. In the third year the GCDAMP would consider minor changes to the year three budget to allow for changes in projects or potential important new starts not envisioned during the development of the triennial budget.
+
== '''GCDAMP Budget and Work Plan ''' ==
 +
 
 +
<br>
 +
The goal of the '''Triennial Budget and Workplan (TWP)''' is to reduce the effort expended on the budget process while improving the effectiveness of the Grand Canyon Monitoring and Research Center (GCMRC), Technical Work Group (TWG), and AMWG. The GCDAMP will develop a TWP the first year of the process. Then, in the second year the GCDAMP would implement the year-two budget and make relatively minor corrections primarily related to changes in CPI and needs at GCMRC and the Bureau of Reclamation. In the third year the GCDAMP would consider minor changes to the year three budget to allow for changes in projects or potential important new starts not envisioned during the development of the triennial budget.
  
 
The major components of the TWP would include:
 
The major components of the TWP would include:
Line 39: Line 42:
 
! style="width=20%; background:#cedff2;" | [[GCDAMP Strategic Plan]] <br> The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions.
 
! style="width=20%; background:#cedff2;" | [[GCDAMP Strategic Plan]] <br> The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions.
  
! style="width=20%; background:#cedff2;" | [[Strategic Science Plan]] <br> The GCMRC Strategic Science Plan (SSP) identifies general strategies for the next 5 years to provide science information responsive to the goals, management objectives, and priority questions as described in the AMPSP and other planning direction approved by the AMWG.
+
! style="width=20%; background:#cedff2;" | [https://pubs.er.usgs.gov/publication/ofr20171006 LTEMP Science Plan] <br> The LTEMP Science Plan describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to DOI, its bureaus, and to the GCDAMP in support of implementation of LTEMP.
  
 
! style="width=20%; background:#cedff2;" | [[Core Monitoring Plan]] <br> The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources.
 
! style="width=20%; background:#cedff2;" | [[Core Monitoring Plan]] <br> The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources.
Line 45: Line 48:
 
! style="width=20%; background:#cedff2;" | [[Monitoring and Research Plan]] <br> The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next 5 years to address some of the strategic science questions associated with AMWG priority questions.  
 
! style="width=20%; background:#cedff2;" | [[Monitoring and Research Plan]] <br> The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next 5 years to address some of the strategic science questions associated with AMWG priority questions.  
  
! style="width=20%; background:#cedff2;" | [[GCDAMP Budget|Triennial Work Plan (TWP)]] <br> The GCMRC Triennial Work Plan (TWP) identifies the scope, objectives, and budget for monitoring and research activities planned for a 3-year period. When completed, the triennial work plan will be consistent with the MRP.  
+
! style="width=20%; background:#cedff2;" | [[GCDAMP Budget|Budget and Work Plan]] <br> The GCMRC Triennial Work Plan (TWP) identifies the scope, objectives, and budget for monitoring and research activities planned for a 3-year period. When completed, the TWP will be consistent with the MRP.  
  
 
|}
 
|}
 
  
 
{|style="margin:0px 0px 0px 0px; background:none;"
 
{|style="margin:0px 0px 0px 0px; background:none;"
 
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"|
 
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"|
 
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;"
 
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;"
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;">
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;"> Triennial Budget and Workplans </h2>
[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/TWP_rev_14aug01.pdf| Triennial Budget and Work Plan]</h2>
+
 
|-
 
|-
 
|style="color:#000;"|
 
|style="color:#000;"|
  
==Chapter 1. Introduction==
+
|-
Adaptive Management Work Group Costs <br>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY25-27 Triennial Budget and Workplan Page]] </h2>
AMWG Member Travel Reimbursement  <br>
+
|-
AMWG Reclamation Travel  <br>
+
|style="color:#000;"|
AMWG Facilitation Contract  <br>
+
Public Outreach  <br>
+
AMWG Other  <br>
+
  
TWG Costs  <br>
 
TWG Member Travel Reimbursement  <br>
 
TWG Reclamation Travel  <br>
 
TWG Chair Reimbursement/Facilitation  <br>
 
TWG Other  <br>
 
  
Administrative Support for NPS Permitting  <br>
+
|-
Contract Administration  <br>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> FY24 Budget and Workplan </h2>
Science Advisor Contract  <br>
+
|-
Experimental Fund  <br>
+
|style="color:#000;"|
Installation of Acoustic Flow Meters in Glen Canyon Dam Bypass Tubes  <br>
+
Native Fish Conservation Contingency Fund  <br>
+
  
Cultural Resources Work Plan  <br>
+
*[[Media:Memo from Wayne - continuation of GCDAMP workplan wgp.pdf| Memo from Wayne - continuation of GCDAMP workplan in FY24.pdf ]]
Integrated Tribal Resources Monitoring  <br>
+
Tribal Participation in the GCDAMP <br>
+
  
==Chapter 2. U.S. Geological Survey, Southwest Biological Science Center, Grand Canyon Monitoring and Research Center Triennial Budget and Work Plan—Fiscal Years 2015–2017==
+
|-
Introduction  <br>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY21-23 Triennial Budget and Workplan]] Page </h2>
Purpose  <br>
+
|-
Administrative Guidance that Informs the FY15–17 Triennial Work Plan  <br>
+
|style="color:#000;"|
Overview of the FY 15–17 Triennial Work Plan  <br>
+
Allocation of the FY15–17 Budget <br>
+
References <br>
+
  
==Project 1. Lake Powell and Glen Canyon Dam Release Water-Quality Monitoring==
+
*[[Media:GCMRC TWP2021-23 December2 2020 ApprovedBySecretary.pdf| Triennial Budget and Work Plan -- Fiscal Years 2021-2023 ]]
Investigators <br>
+
*[[Media:20240125-AnnualReportingMeeting-ProceedingsFiscalYear2023-508-UCRO.pdf | GCMRC FY23 Annual Project Report]]
Project Summary <br>
+
*[https://www.usbr.gov/uc/progact/amp/twg/2023-01-26-twg-meeting/20230126-AnnualReportingMeeting-ProceedingsFY2022AnnualReportingMeeting-508-UCRO.pdf GCMRC FY22 Annual Project Report]
Background  <br>
+
*[http://gcdamp.com/images_gcdamp_com/e/ec/GCMRC_ANNUAL_REPORT_FY2021-FINAL_508.pdf GCMRC FY21 Annual Project Report]
*Scientific Background 
+
*Management Background 
+
*Key Monitoring and Research Questions Addressed in this project 
+
Proposed Work  <br>
+
*Project Elements 
+
*Personnel and Collaborations 
+
*Deliverables 
+
*Productivity from Past Work 
+
*Completed Publications 
+
*Publications in progress 
+
*Presentations at professional meetings 
+
References  <br>
+
Budget  <br>
+
  
==Project 2. Stream Flow, Water Quality, and Sediment Transport in the Colorado River Ecosystem==
+
|-
Investigators
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [http://gcdamp.com/index.php?title=FY18-20_GCMRC_Triennial_Budget_and_Workplan FY18-20 Triennial Budget and Workplan] Page </h2>
Project Summary  <br>
+
|-
Background  <br>
+
|style="color:#000;"|
*Scientific Background
+
*Management Background
+
* Monitoring and Research Questions Posed by Stakeholders that Are Addressed in This Project
+
*Scientific Questions that have Emerged from Past Work and That Are Addressed in This Project
+
Proposed Work  <br>
+
*Project Elements
+
*Personnel and Collaborations
+
*Deliverables
+
Productivity from Past Work (during FY 13–14)  <br>
+
*Data Products
+
*Completed Publications
+
*Publications in progress
+
*Presentations at GCDAMP meetings
+
* Presentations at professional meetings
+
References  <br>
+
Budget  <br>
+
  
==Project 3. Sandbars and Sediment Storage Dynamics: Long-term Monitoring and Research at the Site, Reach, and Ecosystem Scales==
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2017-09-20-amwg-meeting/Attach_04a.pdf Triennial Budget and Work Plan -- Fiscal Years 2018-2020 ]
Investigators <br>
+
*[https://www.usbr.gov/uc/progact/amp/twg/2022-01-13-twg-meeting/20220113-SummaryReportPeerReview2020AnnualProjectReport-508-UCRO.pdf Summary Report of the Peer Review for the 2020 Annual Project Report]
Project Summary  <br>
+
*[[Media:GCMRC FY20 ANNUAL REPORT-Final 12.18.2020.pdf | GCMRC FY20 Annual Project Report]]
Background  <br>
+
*[[Media:FY2019 GCMRC Annual Report-12-19-2019-FINAL.pdf | GCMRC FY19 Annual Project Report]]
*Scientific Background
+
*[[Media:FY2018 GCMRC Annual Report-FINAL 12-13-2018.pdf | GCMRC FY18 Annual Project Report]]
*Management Background
+
*Key Monitoring and Research Questions Addressed in this project
+
Proposed Work  <br>
+
*Outline of Monitoring Strategy
+
*Project Elements
+
*Personnel and Collaborations
+
*Deliverables
+
Productivity from Past Work (during FY 13–14)  <br>
+
*Data Products
+
*Completed Publications 
+
*Publications in progress
+
*Presentations at GCDAMP meetings
+
*Presentations at professional meetings
+
References  <br>
+
Budget  <br>
+
  
==Project 4. Connectivity along the fluvial-aeolian-hillslope continuum: Quantifying the relative importance of river-related factors that influence upland geomorphology and archaeological site stability ==
+
|-
Investigators  <br>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [http://gcdamp.com/index.php?title=FY_15-17_GCMRC_Triennial_Budget_and_Work_Plan FY15-17 Triennial Budget and Workplan] Page </h2>
Project Summary  <br>
+
|-
Background  <br>
+
|style="color:#000;"|
*Scientific Background
+
*Management Background
+
*Key Monitoring and Research Questions Addressed in this project
+
Proposed Work  <br>
+
*Project Elements
+
*Personnel and Collaborations
+
*Deliverables
+
Productivity from Past Work (during FY13–14)  <br>
+
*Data Products
+
*Completed Publications 
+
*Publications in progress
+
*Presentations at GCDAMP meetings
+
*Presentations at professional meetings
+
References  <br>
+
Budget  <br>
+
  
==Project 5. Foodbase Monitoring and Research==
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/TWP_rev_14aug01.pdf Triennial Budget and Work Plan -- Fiscal Years 2015-2017]
Investigators  <br>
+
*[[Media:GCMRC Annual Report 2017.pdf| GCMRC FY 2017 Annual Project Report ]]
Project Summary  <br>
+
*[[Media:GCMRC FY16 Annual Report.pdf| GCMRC FY 2016 Annual Project Report ]]
Background  <br>
+
*[[Media:FY15 GCMRC Annual Report.pdf| GCMRC FY 2015 Annual Project Report ]]
*Scientific Background
+
*Management Background
+
*Key Monitoring and Research Questions Addressed
+
*Hypotheses Explaining Aquatic Invertebrate Productivity and Diversity
+
Proposed Work
+
*Project Elements
+
*Personnel and Collaborations
+
*Deliverables
+
Productivity from Past Work (during FY 13–14)
+
*Data Product
+
*Completed Publications
+
*Publications in progress
+
*Presentations at GCDAMP meetings
+
*Presentations at professional meetings
+
References  <br>
+
Budget
+
  
==Project 6. Mainstem Colorado River Humpback Chub Aggregations and Fish Community Dynamics==
+
|-
Investigators  <br>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [http://gcdamp.com/index.php?title=FY12-14_GCMRC_Biannual_Budget_and_Workplan FY13-14 Biannual Budget and Workplan] Page </h2>
Project Summary  <br>
+
|-
Background
+
|style="color:#000;"|
*Scientific Background
+
*Key Monitoring and Research Questions Addressed in this project
+
*Key management goals and objectives addressed in this project
+
Proposed Work
+
*Project Elements
+
*Personnel and Collaborations
+
*Deliverables
+
Productivity from Past Work (during FY 13–14)
+
*Data Products
+
*Publications in progress
+
*Presentations at GCDAMP meetings
+
*Presentations at professional meetings
+
References  <br>
+
Budget
+
  
==Project 7. Population Ecology of Humpback Chub in and around the Little Colorado River==
+
*[https://www.usbr.gov/uc/progact/amp/twg/2013-11-06-twg-meeting/Attach_03d.pdf GCDAMP Biennial Budget and Work Plan--Fiscal Years 2013-14]
Investigators  <br>
+
*[https://www.usbr.gov/uc/progact/amp/twg/2014-01-30-twg-meeting/Attach_09.pdf GCMRC Fiscal Year 2013 Annual Project Report to the GCDAMP]
Project Summary  <br>
+
Background
+
*Scientific Background
+
*Management Background
+
*Key Monitoring and Research Questions Addressed in this project
+
Proposed Work
+
*Project Elements
+
*Personnel and Collaborations
+
*Deliverables
+
Productivity from Past Work (during FY 13–14)
+
*Data Products
+
*Completed Publications
+
*Publications in progress
+
*Presentations at GCDAMP meetings
+
*Presentations at professional meetings
+
References  <br>
+
Budget
+
  
==Project 8. Experimental Actions to Increase Abundance and Distribution of Native Fishes in Grand Canyon==
+
|-
Investigators  <br>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY11-12 GCMRC Biannual Budget and Workplan]] Page </h2>
Project Summary  <br>
+
|-
Background
+
|style="color:#000;"|
*Management Background
+
*Key Monitoring and Research Questions Addressed in this Project
+
Proposed Work
+
*Project Elements
+
*Personnel and Collaborations
+
*Deliverables
+
Productivity from Past Work (during FY 13–14)
+
*Data Products
+
*Publications in progress
+
*Presentations at GCDAMP meetings
+
*Presentations at professional meetings
+
References  <br>
+
Budget
+
  
==Project 9. Understanding the Factors Determining Recruitment, Population Size, Growth, and Movement of Rainbow Trout in Glen and Marble Canyons ==
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2011-08-24-amwg-meeting/Attach_10g.pdf Glen Canyon Dam Adaptive Management Program Biennial Budget and Work Plan - Fiscal Years 2011-12]
Investigators  <br>
+
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_05a.pdf Appendix E, FY2011-12 Spreadsheet]
Project Summary  <br>
+
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_05b.pdf GCMRC Proposed Budget PPT]
Background
+
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_05c.pdf John Hamill Memo Including Project Summary Table]
*Scientific Background
+
*Key Monitoring and Research Questions Addressed in this Project
+
Proposed Work- Monitoring and Research Projects
+
*Project Elements- Research
+
*Personnel and Collaborations
+
*Deliverables
+
Productivity from Past Work (during FY 13–14)
+
*Completed Publications
+
*Publications in progress
+
*Presentations at GCDAMP meetings
+
*Presentations at professional meetings
+
References  <br>
+
Budget
+
  
==Project 10. Where does the Glen Canyon Dam rainbow trout tailwater fishery end? - Integrating Fish and Channel Mapping Data below Glen Canyon Dam ==
+
|-
Investigators  <br>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY10 GCMRC Budget and Workplan]] Page </h2>
Project Summary  <br>
+
|-
Background
+
|style="color:#000;"|
*Scientific Background
+
*Management Background
+
*Key Monitoring and Research Questions Addressed in this project
+
Proposed Work
+
*Project Elements
+
*Personnel and Collaborations
+
*Deliverables
+
Productivity from Past Work (during FY 13–14)
+
*Data Products
+
*Completed Publications
+
*Publications in progress
+
*Presentations at GCDAMP meetings
+
*Presentations at professional meetings
+
References    <br>
+
Budget
+
  
==Project 11. Riparian Vegetation Monitoring and Analysis of Riparian Vegetation, Landform Change and Aquatic-Terrestrial linkages to Faunal Communities ==
+
*[https://www.usbr.gov/uc/progact/amp/twg/2009-03-16-twg-meeting/Attach_08b.pdf BAHG FY2010 Preliminary Budget Recommendation to the TWG dated March 6, 2009]
Investigators  <br>
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_05.pdf FY2010 Mid-year Expenditures: 1) FY2010 Bureau of Reclamation Mid-year Expenditures and FY2010 GCMRC Mid-year Expenditures]
Project Summary  <br>
+
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_04b.pdf Process and Approximate Schedule for FY10-11 Recovery Program Work Planning]
Background
+
*Scientific Background
+
*Management Background
+
*Key Monitoring and Research Questions Addressed in this project
+
Proposed Work
+
*Project Elements
+
*Personnel and Collaborations
+
*Deliverables
+
Productivity from Past Work (during FY 13–14)
+
*Data Products
+
*Completed Publications
+
*Publications in progress
+
*Presentations at GCDAMP meetings
+
*Presentations at professional meetings
+
References    <br>
+
Budget
+
  
==Project 12. Changes in the Distribution and Abundance of Culturally-Important Plants in the Colorado River Ecosystem: A Pilot Study to Explore Relationships between Vegetation Change and Traditional Cultural Values==
+
|-
Investigators    <br>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY09 GCMRC Budget and Workplan]] Page </h2>
Project Summary    <br>
+
|-
Background
+
|style="color:#000;"|
*Scientific Background
+
*DFCs and Key Monitoring and Research Questions Addressed by this project
+
Proposed Work
+
*Project Elements
+
*Personnel and Collaborations
+
*Linkages to other projects
+
*Deliverables
+
References    <br>
+
Budget
+
  
==Project 13. Socioeconomic Monitoring and Research==
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_19.pdf AIF: FY2009 Final Expenditures and USBR Report]
Investigators    <br>
+
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_20.pdf FY2009 Expenditures for USGS]
Project Summary    <br>
+
Background
+
*Scientific Background
+
*Key Monitoring and Research Questions Addressed in this project
+
Proposed Work
+
*Project Elements
+
*Personnel and Collaborations
+
*Deliverables
+
References    <br>
+
Budget
+
  
==Project 14. Geographic Information Systems (GIS) Services and Support ==
+
|-
Investigators    <br>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> [[FY08 GCMRC Budget and Workplan]] Page </h2>
Project Summary    <br>
+
|-
Background
+
|style="color:#000;"|
*Scientific Background
+
*Management Background
+
*Key Monitoring and Research Questions Addressed in this project
+
Proposed Work
+
*Project Elements
+
*Personnel and Collaborations
+
*Deliverables
+
Productivity from Past Work (during FY 13–14)
+
*Data Products
+
*Presentations at GCDAMP meetings
+
*Presentations at professional meetings
+
Budget
+
 
+
==Project 15. Administration==
+
Budget  <br>
+
 
+
==Appendices==
+
Appendix 2-A. Fiscal Year 2015 Funding Recommendation  <br>
+
Appendix 2-B. Fiscal Year 2015 Budget  <br>
+
Appendix 2-C. Fiscal Year 2016 Budget   <br>
+
Appendix 2-D. Fiscal Year 2017 Budget  <br>
+
Appendix 3. Logistics and Schedules of River Trips and Field Work  <br>
+
Appendix 4. TWG Triennial Budget Input FY15–17 Consensus by full TWG on April 9, 2014  <br>
+
  
 
|}
 
|}
Line 370: Line 151:
 
|class="MainPageBG" style="width:45%; border:1px solid #cedff2; background:#f5faff; vertical-align:top;"|
 
|class="MainPageBG" style="width:45%; border:1px solid #cedff2; background:#f5faff; vertical-align:top;"|
 
{| width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;"
 
{| width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;"
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Documents and Links</h2>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Links </h2>
 
|-
 
|-
 
|style="color:#000;"|
 
|style="color:#000;"|
  
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/TWP_rev_14aug01.pdf '''Grand Canyon Monitoring and Research Center Triennial Budget and Work Plan -- Fiscal Years 2015-2017]'''
+
*[http://gcdamp.com/index.php?title=GCDAMP_BAHG_Page Budget AdHoc Group Page]
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/16apr19/documents/TWP_Protocol_Paper.pdf  GCDAMP Triennial Budget Process]
+
*[[GCDAMP Planning]] Page
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/16apr19/documents/Timeline_Table.pdf  Triennial Work Plan Process Timeline]
+
*[https://gcdamp.com/index.php/Portal:GCDAMP_Knowlege_Assessments Annual Reporting and Knowledge Assessment Page]
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/16apr19/documents/Castle_Memo.pdf Memo from Anne Castle to Jack Schmidt (USGS) and Glen Knowles (USBR) Dated May 7, 2014, Subject: GCDAMP Triennial Budget and Work Plan]
+
*[[GCDAMP and NPS River Trips and Field Activities]]
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/16apr19/documents/Streamlined_Process.pdf   Streamlined GCMRC Biennial Work Planning Process]
+
 
*Back to [[GCDAMP Planning]]
+
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Documents and Direction </h2>
 +
|-
 +
|style="color:#000;"|
 +
 
 +
*[https://www.usbr.gov/uc/progact/amp/twg/2016-10-18-twg-meeting/Attach_09b.pdf TWP Protocol Paper (10-6-2016)]
 +
*[[Media:2020.02.05 - AMWG Approved TWP protocol - Table 1 for 2021-2023 - 508.pdf| TWP Protocol Table 1 update (3-6-2019)]]
 +
*[[Media:AMP Funding Considerations 2017-01-26.pdf| Presentation given by Rod Smith on AMP funding considerations to the AMWG 2017-01-26]]
  
 
|-
 
|-
Line 389: Line 177:
  
 
|-
 
|-
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Papers and Presentations</h2>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Papers and Presentation</h2>
 
|-
 
|-
 
|style="color:#000;"|
 
|style="color:#000;"|
  
'''2015'''
+
'''2023'''
*[https://drive.google.com/file/d/0BwY-Z2c3NTUGTU9xOFhSNmVGZVk/view Overview of Reclamation FY15-17 Budget]
+
*[https://www.usbr.gov/uc/progact/amp/twg/2023-11-08-twg-meeting/20231108-GlenCanyonDamAdaptiveManagementProgramBudgetPriorities-508-UCRO.pdf Glen Canyon Dam Adaptive Management Program Budget Priorities]
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/15jun11/Attach_01.pdf Bureau of Reclamation Overview of FY15-17 Budget]
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2023-08-17-amwg-meeting/20230817-TWGBudgetMotion-508-UCRO.pdf TWG Budget Motion]
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/15may28/Attach_04a.pdf FY2016 Budget and Work Plan]
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2023-08-17-amwg-meeting/20230817-GCDAMPBudgetWorkPlanReclamation-508-UCRO.pdf GCDAMP Budget and Work Plan: Reclamation]
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/15may28/Attach_04b.pdf  Overview of Reclamation FY15-17 Budget]
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2023-08-17-amwg-meeting/20230817-GCMRCFY24GCDAMPBudgetOverview-508-UCRO.pdf GCMRC FY24 GCDAMP Budget Overview]
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/15may28/index.html  GCMRC Budget]
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2023-08-17-amwg-meeting/20230817-FY2024BudgetWorkPlanRecommentationInformation-508-UCRO.pdf FY 2024 Budget and Work Plan Recommendation Information]
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/15apr21/Attach_05a.pdf  Overview of Reclamation Budget for FY2016]
+
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/15feb25/Attach_09a.pdf  FY15-17 Budget, and Overview of Reclamation FY15-17]
+
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/15feb25/index.html  GCMRC Budget Update]'''
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/15apr21/Attach_05b.pdf GCMRC Budget for FY2016 ]'''
+
  
'''2014'''
+
'''2022'''
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14oct28/Attach_05a.pdf GCDAMP Biennial Budget Process Approved by the AMWG on 5/6/10]
+
*[https://www.usbr.gov/uc/progact/amp/pdfs/20200205-AMWGApprovedTriennialBudgetWorkPlan2021-2023-508.pdf GCDAMP Triennial Budget and Work Plan Process ]
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/14aug27/Attach_06a.pdf AIF: Proposed FY2015-17 Budget and Work Plan]
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2022-02-10-amwg-meeting/20220210-ReclamationBudgetProcess-508-UCRO.pdf Reclamation Budget Process ]
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/14aug27/Attach_06c.pdf Overview of Reclamation FY15-17 Budget Considerations with proposed Cultural Resources Work Plan]
+
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/14aug27/Attach_06d.pdf Final Draft GCMRC Work Plan and Budget]
+
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/14aug27/Attach_06e.pdf USGS Facilities in Flagstaff ]
+
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/14aug27/Attach_06f.pdf  Final FY2015-17 Budget and Work Plan (approved by the AMWG on August 28, 2014) ]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/TWP_rev_14aug01.pdf Grand Canyon Monitoring and Research Center Triennial Budget and Work Plan -- Fiscal Years 2015-2017]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/Attach_05b.pdf Overview of Reclamation FY15-17 Budget Considerations]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/Attach_05c.pdf Development of the FY15-17 GCMRC Work Plan and Budget]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/Attach_05a.pdf AIF and FY15-17 Triennial Budget and Work Plan]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/Attach_07.pdf Combined PPTs on GCMRC Proposed Projects]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/Attach_08.pdf Comments from AGFD on FY15-17 Budget and Work Plan and GCMRC Response to AGFD]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/TWP_rev_14aug01.pdf FY15-17 Budget and Work Plan revised August 1, 2014]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/14jun24/TWP_PPT_14aug04_jcs.pdf Draft Minutes from TWG WebEx/CC held on August 4, 2014 and GCMRC Budget Presentation]
+
  
'''2013'''
+
'''2016'''
 
+
*[https://www.usbr.gov/uc/progact/amp/twg/2016-10-18-twg-meeting/Attach_09b.pdf GCDAMP Triennial Budget and Work Plan Process Updated October 19, 2016]
'''2012'''
+
*[https://www.usbr.gov/uc/progact/amp/twg/2016-10-18-twg-meeting/Attach_09a.pdf Triennial Work Plan Budget Process]
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/12jun20/Attach_08a.pdf '''Draft FY2013-14 Biennial Budget and Work Plan]'''
+
*[https://www.usbr.gov/uc/progact/amp/amwg/2016-08-24-amwg-meeting/Attach_04.pdf Technical Work Group (TWG) Report: Triennial Budget Process Development]
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/12jun20/Attach_08d.pdf  Overview of Reclamation FY13-14 Budget]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/12jun20/Attach_08e.pdf Science Advisor Review of FY13-14 Budget]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/12jun20/Attach_08b.pdf DOI Response Memo Dated June 15, 2012, and BAHG Updates]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/12jun20/Attach_08c.pdf E-mail Dated June 15, 2012, from Shane Capron, Subj: FY2013-14 Final Budget Preparation Document]
+
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/12jun20/Attach_08i.pdf Final Budget Results and Motions]'''
+
  
 
'''2011'''
 
'''2011'''
 +
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11jan20/Attach_05a.pdf Biennial Budget Process Paper]
 +
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11jan20/Attach_05b.pdf Budget Concerns Developed by TWG Chair]
 +
 +
'''2010'''
 +
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10may06CC/Attach_02b.pdf GCDAMP Biennial Budget Process Paper Approved by the AMWG on May 6, 2010]
 +
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_04a.pdf TWG Biennial Process Paper]
 +
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_04c.pdf GCDAMP Biennial Process Paper Approved by the AMWG on May 6, 2010]
 +
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10jan21/Attach_03a.pdf GCDAMP Biennial Budget Process Paper]
 +
 +
'''2009'''
 +
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09sep29/Attach_13.pdf AIF: Biennial Budget Process Development with Biennial Budget Process, Draft Outline for TWG Review]
 +
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_08f.pdf Memo from Dennis Kuby dated 6/21/09, Subj: Proposed Biennial Budget and Work Plan to Support the GCDAMP in Fiscal Years FY2010-22]
 +
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_08j.pdf Budget Motion and Proposed Amendments]
 +
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_07b.pdf GCMRC Response to Budget Motions from the AMWG Meeting held April 29-30, 2009]
 +
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_11.pdf Biennial Budget Process Discussion Paper]
 +
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09apr29/Attach_08a.pdf Budget Discussion Procedures]
  
 
|-
 
|-
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Other Stuff</h2>
+
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Funding the Glen Canyon Dam Adaptive Management Program </h2>
 
|-
 
|-
 
|style="color:#000;"|
 
|style="color:#000;"|
  
*Experimental fund: Monitoring and Research Plan page 8: In 2003, the GCDAMP established a fund to pay for experimental research projects so that they can be conducted without financially impacting other aspects of the science program. The current balance of the experimental fund at the end of the FY2007 is anticipated to be approximately $900,000. An additional $500,000 will be set aside by the GCMRC annually in an account at Reclamation to fund the BHBF tests and other research related to experimental efforts.1 Deposits to the experimental account will cease when the balance reaches $2.5 million.
+
The GCDAMP activities that are eligible for funding from power revenues are those actions related to dam operations or the mitigation of dam operations within the CRE. These will be funded in compliance with Section 204 of Public Law (PL) 106-377. Appropriated funds or other sources of funding may also be used for GCDAMP activities as specified in Section 1808 of the GCPA and Section 204 of PL 106-377. [https://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf]
 +
 
 +
[[Media:PLAW-106publ377 (Sec204-AMP cap).pdf| PUBLIC LAW 106–377—APPENDIX B 114 STAT. 1441A–68-69: "The Cap Language" ]]<br>
 +
SEC. 204. <br>
 +
'''(a) IN GENERAL.''' For fiscal year 2001 and each
 +
fiscal year thereafter, the Secretary of the Interior shall continue
 +
funding, from power revenues, the activities of the Glen Canyon
 +
Dam Adaptive Management Program as authorized by section 1807
 +
of the Grand Canyon Protection Act of 1992 (106 Stat. 4672),
 +
at not more than $7,850,000 (October 2000 price level), adjusted
 +
in subsequent years to reflect changes in the Consumer Price Index
 +
for All Urban Consumers published by the Bureau of Labor Statistics
 +
of the Department of Labor.<br>
 +
'''(b) VOLUNTARY CONTRIBUTIONS.''' Nothing in this section precludes
 +
the use of voluntary financial contributions (except power
 +
revenues) to the Adaptive Management Program that may be
 +
authorized by law.<br>
 +
'''(c) ACTIVITIES TO BE FUNDED.''' The activities to be funded
 +
as provided under subsection (a) include activities required to meet
 +
the requirements of section 1802(a) and subsections (a) and (b)
 +
of section 1805 of the Grand Canyon Protection Act of 1992 (106
 +
Stat. 4672), including the requirements of the Biological Opinion
 +
on the Operation of Glen Canyon Dam and activities required
 +
by the Programmatic Agreement on Cultural and Historic Properties,
 +
to the extent that the requirements and activities are consistent
 +
with the Grand Canyon Protection Act of 1992 (106 Stat.
 +
4672).<br>
 +
'''(d) ADDITIONAL FUNDING.''' To the extent that funding under
 +
subsection (a) is insufficient to pay the costs of the monitoring
 +
and research and other activities of the Glen Canyon Dam Adaptive
 +
Management Program, the Secretary of the Interior may use funding
 +
from other sources, including funds appropriated for that purpose.
 +
All such appropriated funds shall be nonreimbursable and
 +
nonreturnable.<br>
 +
 
 +
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Experimental Fund </h2>
 +
|-
 +
|style="color:#000;"|
 +
 
 +
In 2003, the GCDAMP established a fund to pay for experimental research projects so that they can be conducted without financially impacting other aspects of the science program. The current balance of the experimental fund at the end of the FY2007 is anticipated to be approximately $900,000. An additional $500,000 will be set aside by the GCMRC annually in an account at Reclamation to fund the BHBF tests and other research related to experimental efforts. Deposits to the experimental account will cease when the balance reaches $2.5 million.[http://gcdamp.com/index.php?title=Monitoring_and_Research_Plan Monitoring and Research Plan, page 8]
 +
 
 +
If the funds allocated to the Experimental Management Fund are not needed in
 +
a given year, at the end of the year, they will be transferred to the Native Fish
 +
Conservation Contingency Fund (Reclamation project C.6); some year-end
 +
experimental management funds may also be allocated to the Contingency
 +
Fund for NHPA Section 106 Compliance (Reclamation project D.10). [https://www.usbr.gov/uc/progact/amp/amwg/2017-09-20-amwg-meeting/Attach_04e.pdf]
 +
 
 +
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_08h.pdf GCDAMP Status of Experimental Funds FY2008-12]
 +
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09jun22/Attach_07e.pdf GCDAMP Status of Experimental Funds - FY2008-12]
 +
 
 +
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Native Fish Conservation Contingency Fund </h2>
 +
|-
 +
|style="color:#000;"|
 +
 
 +
“The goal of this budget item is to ensure that funds are
 +
available for native fish conservation actions or nonnative
 +
fish control the event this conservation action is needed for
 +
endangered humpback chub…”[https://www.usbr.gov/uc/progact/amp/amwg/2017-09-20-amwg-meeting/Attach_04e.pdf]
 +
*Projected balance at end of FY 17: ~$1,400,000 [https://www.usbr.gov/uc/progact/amp/amwg/2017-09-20-amwg-meeting/Attach_04e.pdf]
 +
 
 +
|-
 +
! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> New USGS Flagstaff Science Building and Overhead Projection </h2>
 +
|-
 +
|style="color:#000;"|
  
 +
*Occupancy agreement between USGS, City of Flagstaff, and GSA signed in April 2019
 +
*Occupancy start of FY2021 at earliest, overhead may increase some during planning and construction
 +
*FY2020 overhead on GCDAMP funds: Current projection ~16%, pass-through rate = 3.0%
 +
*Overhead on GCDAMP funds to ~26% upon occupancy [https://www.usbr.gov/uc/progact/amp/amwg/2019-05-22-amwg-meeting/20190522-FiscalYear2020ProposedBudget-Presentation-508-UCRO.pdf]
  
 
|}
 
|}

Latest revision as of 13:27, 25 September 2024


FY25-27TWP.png

GCDAMP Budget and Work Plan


The goal of the Triennial Budget and Workplan (TWP) is to reduce the effort expended on the budget process while improving the effectiveness of the Grand Canyon Monitoring and Research Center (GCMRC), Technical Work Group (TWG), and AMWG. The GCDAMP will develop a TWP the first year of the process. Then, in the second year the GCDAMP would implement the year-two budget and make relatively minor corrections primarily related to changes in CPI and needs at GCMRC and the Bureau of Reclamation. In the third year the GCDAMP would consider minor changes to the year three budget to allow for changes in projects or potential important new starts not envisioned during the development of the triennial budget.

The major components of the TWP would include:

  • Three-year budget spreadsheets, work plans, and hydrographs,
  • Modifications of the year-three budget based on specific criteria,
  • Fiscal reporting, including expenditures for the previous fiscal year (mid-year and end end-of year reports),
  • Project progress reports, including an annual reporting meeting in January, and
  • Utilization of the Budget Ad Hoc Group (BAHG) to interface with Reclamation and GCMRC in developing a draft TWP, and to help the TWG develop budget recommendations for AMWG consideration.
GCDAMP Strategic Plan
The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions.
LTEMP Science Plan
The LTEMP Science Plan describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to DOI, its bureaus, and to the GCDAMP in support of implementation of LTEMP.
Core Monitoring Plan
The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources.
Monitoring and Research Plan
The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next 5 years to address some of the strategic science questions associated with AMWG priority questions.
Budget and Work Plan
The GCMRC Triennial Work Plan (TWP) identifies the scope, objectives, and budget for monitoring and research activities planned for a 3-year period. When completed, the TWP will be consistent with the MRP.

Triennial Budget and Workplans

FY25-27 Triennial Budget and Workplan Page


FY24 Budget and Workplan

FY21-23 Triennial Budget and Workplan Page

FY18-20 Triennial Budget and Workplan Page

FY15-17 Triennial Budget and Workplan Page

FY13-14 Biannual Budget and Workplan Page

FY11-12 GCMRC Biannual Budget and Workplan Page

FY10 GCMRC Budget and Workplan Page

FY09 GCMRC Budget and Workplan Page

FY08 GCMRC Budget and Workplan Page


Links

Documents and Direction

Science Questions and Information Needs

Papers and Presentation

2023

2022

2016

2011

2010

2009

Funding the Glen Canyon Dam Adaptive Management Program

The GCDAMP activities that are eligible for funding from power revenues are those actions related to dam operations or the mitigation of dam operations within the CRE. These will be funded in compliance with Section 204 of Public Law (PL) 106-377. Appropriated funds or other sources of funding may also be used for GCDAMP activities as specified in Section 1808 of the GCPA and Section 204 of PL 106-377. [1]

PUBLIC LAW 106–377—APPENDIX B 114 STAT. 1441A–68-69: "The Cap Language"
SEC. 204.
(a) IN GENERAL. For fiscal year 2001 and each fiscal year thereafter, the Secretary of the Interior shall continue funding, from power revenues, the activities of the Glen Canyon Dam Adaptive Management Program as authorized by section 1807 of the Grand Canyon Protection Act of 1992 (106 Stat. 4672), at not more than $7,850,000 (October 2000 price level), adjusted in subsequent years to reflect changes in the Consumer Price Index for All Urban Consumers published by the Bureau of Labor Statistics of the Department of Labor.
(b) VOLUNTARY CONTRIBUTIONS. Nothing in this section precludes the use of voluntary financial contributions (except power revenues) to the Adaptive Management Program that may be authorized by law.
(c) ACTIVITIES TO BE FUNDED. The activities to be funded as provided under subsection (a) include activities required to meet the requirements of section 1802(a) and subsections (a) and (b) of section 1805 of the Grand Canyon Protection Act of 1992 (106 Stat. 4672), including the requirements of the Biological Opinion on the Operation of Glen Canyon Dam and activities required by the Programmatic Agreement on Cultural and Historic Properties, to the extent that the requirements and activities are consistent with the Grand Canyon Protection Act of 1992 (106 Stat. 4672).
(d) ADDITIONAL FUNDING. To the extent that funding under subsection (a) is insufficient to pay the costs of the monitoring and research and other activities of the Glen Canyon Dam Adaptive Management Program, the Secretary of the Interior may use funding from other sources, including funds appropriated for that purpose. All such appropriated funds shall be nonreimbursable and nonreturnable.

Experimental Fund

In 2003, the GCDAMP established a fund to pay for experimental research projects so that they can be conducted without financially impacting other aspects of the science program. The current balance of the experimental fund at the end of the FY2007 is anticipated to be approximately $900,000. An additional $500,000 will be set aside by the GCMRC annually in an account at Reclamation to fund the BHBF tests and other research related to experimental efforts. Deposits to the experimental account will cease when the balance reaches $2.5 million.Monitoring and Research Plan, page 8

If the funds allocated to the Experimental Management Fund are not needed in a given year, at the end of the year, they will be transferred to the Native Fish Conservation Contingency Fund (Reclamation project C.6); some year-end experimental management funds may also be allocated to the Contingency Fund for NHPA Section 106 Compliance (Reclamation project D.10). [2]

Native Fish Conservation Contingency Fund

“The goal of this budget item is to ensure that funds are available for native fish conservation actions or nonnative fish control the event this conservation action is needed for endangered humpback chub…”[3]

  • Projected balance at end of FY 17: ~$1,400,000 [4]

New USGS Flagstaff Science Building and Overhead Projection

  • Occupancy agreement between USGS, City of Flagstaff, and GSA signed in April 2019
  • Occupancy start of FY2021 at earliest, overhead may increase some during planning and construction
  • FY2020 overhead on GCDAMP funds: Current projection ~16%, pass-through rate = 3.0%
  • Overhead on GCDAMP funds to ~26% upon occupancy [5]