The GCMRC will use these five priority questions as the primary, but not exclusive, basis for designing the science program. | The GCMRC will use these five priority questions as the primary, but not exclusive, basis for designing the science program. | ||
| − | ==''' | + | ==[https://gcdamp.com/index.php/Portal:Desired_Future_Conditions_-DFCs '''Desired Future Conditions -DFCs''']== |
| − | The | + | The 2011 Desired Future Conditions (DFCs) were intended to be used within the Adaptive Management Program (AMP), including by the Adaptive Management Work Group (AMWG), to help guide the development of recommendations concerning management of Glen Canyon Dam operations and related activities, and dam impacts on Grand Canyon National Park (GCNP) and Glen Canyon National Recreation Area (GCNRA). |
| − | == '''Objectives and Resource Goals of the LTEMP''' [http://ltempeis.anl.gov/documents/final-eis/vol1/Chapter_1-Introduction.pdf (LTEMP FEIS Section 1.4, pages 1-10 to 1-12)]== | + | == '''Objectives and Resource Goals of the 2016 LTEMP''' [http://ltempeis.anl.gov/documents/final-eis/vol1/Chapter_1-Introduction.pdf (LTEMP FEIS Section 1.4, pages 1-10 to 1-12)]== |
| − | Reclamation and NPS developed resource goals considering public input and [http://gcdamp.com/index.php?title=Portal:Desired_Future_Conditions_-DFCs '''Desired Future Conditions (DFCs)'''] previously adopted by the Adaptive Management Work Group (AMWG). The following resource goals were identified: | + | During the LTEMP process, Reclamation and NPS developed resource goals considering public input and [http://gcdamp.com/index.php?title=Portal:Desired_Future_Conditions_-DFCs '''Desired Future Conditions (DFCs)'''] previously adopted by the Adaptive Management Work Group (AMWG). The following resource goals were identified: |
# '''[http://gcdamp.com/index.php?title=CULTURAL Archaeological and Cultural Resources].''' Maintain the integrity of potentially affected NRHP-eligible or listed historic properties in place, where possible, with preservation methods employed on a site-specific basis. | # '''[http://gcdamp.com/index.php?title=CULTURAL Archaeological and Cultural Resources].''' Maintain the integrity of potentially affected NRHP-eligible or listed historic properties in place, where possible, with preservation methods employed on a site-specific basis. | ||
| Line 141: | Line 141: | ||
# '''[http://gcdamp.com/index.php?title=Nonnative_Invasive_Aquatic_Species Nonnative Invasive Species].''' Minimize or reduce the presence and expansion of aquatic nonnative invasive species. | # '''[http://gcdamp.com/index.php?title=Nonnative_Invasive_Aquatic_Species Nonnative Invasive Species].''' Minimize or reduce the presence and expansion of aquatic nonnative invasive species. | ||
# '''[http://gcdamp.com/index.php?title=Riparian_Vegetation Riparian Vegetation].''' Maintain native vegetation and wildlife habitat, in various stages of maturity, such that they are diverse, healthy, productive, self-sustaining, and ecologically appropriate. | # '''[http://gcdamp.com/index.php?title=Riparian_Vegetation Riparian Vegetation].''' Maintain native vegetation and wildlife habitat, in various stages of maturity, such that they are diverse, healthy, productive, self-sustaining, and ecologically appropriate. | ||
| + | |||
| + | =='''2016 LTEMP ROD'''== | ||
| + | The 2016 LTEMP ROD states that DOI will work in consultation with the AMWG to update GCDAMP guiding documents (e.g., GCDAMP strategic plan, vision, mission, and charters) to reflect and be fully consistent with the priorities expressed in the FEIS and in this ROD. The goals and objectives in Section l.4 of the LTEMP FEIS will be carried forward as the goals in the GCDAMP guiding documents. Processes and documents will be evaluated and streamlined or combined as necessary. The DOI, in consultation with the AMWG, will develop monitoring metrics for the goals and objectives using those in Appendix C of the FEIS as a starting point. [https://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf] | ||
|} | |} | ||
| Line 154: | Line 157: | ||
|style="color:#000;"| | |style="color:#000;"| | ||
| − | |||
*[http://gcdamp.com/index.php?title=Long-term_Experimental_and_Management_Plan_(LTEMP) 2016 Long-term Experimental and Management Plan (LTEMP)] | *[http://gcdamp.com/index.php?title=Long-term_Experimental_and_Management_Plan_(LTEMP) 2016 Long-term Experimental and Management Plan (LTEMP)] | ||
| + | *[https://gcdamp.com/index.php/LTEMP_Metrics LTEMP Metrics page] | ||
*[https://pubs.usgs.gov/of/2017/1006/ofr20171006.pdf 2016 LTEMP Science Plan ] | *[https://pubs.usgs.gov/of/2017/1006/ofr20171006.pdf 2016 LTEMP Science Plan ] | ||
| + | *[http://www.riversimulator.org/Resources/NRC/Downstream_NAS_GCDAMP.pdf Downstream- Adaptive Management of Glen Canyon Dam and the Colorado River Ecosystem] | ||
*[https://gcdamp.com/index.php/Core_Monitoring_Plan 2011-2015 Core Monitoring Plan (draft)] | *[https://gcdamp.com/index.php/Core_Monitoring_Plan 2011-2015 Core Monitoring Plan (draft)] | ||
*[https://gcdamp.com/index.php/Strategic_Science_Plan 2007-2011 Strategic Science Plan] | *[https://gcdamp.com/index.php/Strategic_Science_Plan 2007-2011 Strategic Science Plan] | ||
| Line 185: | Line 189: | ||
'''2025''' | '''2025''' | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
*[https://www.usbr.gov/uc/progact/amp/twg/2024-10-30-twg-meeting/20241030-GlenCanyonDamAdaptiveManagementProgramGuidingDocuments-508-AMWQD.pdf Glen Canyon Dam Adaptive Management Program Guiding Documents] | *[https://www.usbr.gov/uc/progact/amp/twg/2024-10-30-twg-meeting/20241030-GlenCanyonDamAdaptiveManagementProgramGuidingDocuments-508-AMWQD.pdf Glen Canyon Dam Adaptive Management Program Guiding Documents] | ||
| Line 197: | Line 196: | ||
*[[Media:Grand Canyon 2022 Discussion about the TWG and AMWG second version.docx| 2022 AMWG river trip: Discussion about the TWG and AMWG]] | *[[Media:Grand Canyon 2022 Discussion about the TWG and AMWG second version.docx| 2022 AMWG river trip: Discussion about the TWG and AMWG]] | ||
*[[Media:Grand Canyon 2022 Small Mouth Bass second version.docx| 2022 AMWG river trip: Discussions on Grand Canyon Smallmouth Bass]] | *[[Media:Grand Canyon 2022 Small Mouth Bass second version.docx| 2022 AMWG river trip: Discussions on Grand Canyon Smallmouth Bass]] | ||
| − | |||
| − | |||
| − | |||
| − | |||
'''2018''' | '''2018''' | ||
| Line 224: | Line 219: | ||
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_17.pdf AIF: Scientific Controls in Adaptive Management and PPT] | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_17.pdf AIF: Scientific Controls in Adaptive Management and PPT] | ||
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10jan21/Attach_08.pdf Evaluating Criteria Guiding Transition of Science Activities to Management Actions in Adaptive Management Programs PPT] | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10jan21/Attach_08.pdf Evaluating Criteria Guiding Transition of Science Activities to Management Actions in Adaptive Management Programs PPT] | ||
| + | |||
| + | '''2008''' | ||
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2008-05-22-amwg-meeting/Attach_16.pdf USGS Workshop on Scientific Aspects of a Long-Term Experimental Plan for Glen Canyon Dam, April 10–11, 2007, Flagstaff, Arizona] | ||
|- | |- | ||
Latest revision as of 14:52, 17 September 2026
|
|
GCDAMP Planning and Guiding DocumentsThe GCDAMP is based on an adaptive environmental assessment and management (AEAM) approach to natural resources management (Holling, 1978; Walters, 1986), now commonly called ―adaptive management. The approach assumes that managed natural resources will always change, that scientific understanding of ecosystems is constantly improving, and that natural resource managers need the best available information to make decisions. AEAM unites the strengths of different scientific disciplines to meet the information needs of resource managers. It encourages scientists and managers to work collaboratively to use scientific information in the management process. AEAM consists of two parts—adaptive assessment and adaptive management. Assessment investigates how ecological systems work and evaluates management alternatives to achieve goals. Management involves learning by doing and testing, which may include monitoring system responses to natural changes (passive adaptive management) or deliberate manipulation of key processes (active adaptive management). Adaptive management acknowledges that policies must satisfy social objectives, but policies also need to adapt to both changes in understanding and changes in managed systems. Managers using an AEAM approach learn how a natural system works and how their actions affect the system; this knowledge helps them to perform better in complex and uncertain environments. |
| Long-term Experimental and Management Plan (LTEMP) The LTEMP provides the basis for decisions that identify management actions and experimental options that will provide a framework for adaptively managing Glen Canyon Dam operations over the next 20 years (2016-2036) |
LTEMP Science Plan The LTEMP Science Plan describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to DOI, its bureaus, and to the GCDAMP in support of implementation of LTEMP. |
GCDAMP Strategic Plan The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions. |
Strategic Science Plan The GCMRC Strategic Science Plan (SSP) identifies general strategies for the next 5 years to provide science information responsive to the goals, management objectives, and priority questions as described in the AMPSP and other planning direction approved by the AMWG. |
Monitoring and Research Plan The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next 5 years to address some of the strategic science questions associated with AMWG priority questions. |
Core Monitoring Plan The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources. |
Triennial Work Plan (TWP) The GCMRC Triennial Work Plan (TWP) identifies the scope, objectives, and budget for monitoring and research activities planned for a 3-year period. When completed, the triennial work plan will be consistent with the MRP. |
|---|
|