Difference between revisions of "GCDAMP BAHG Page"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
Line 77: | Line 77: | ||
Upcoming Meetings:<br> | Upcoming Meetings:<br> | ||
*(Th) July 6, 10a - 12n MDT: Review process, general overview, BOR work plan and budget | *(Th) July 6, 10a - 12n MDT: Review process, general overview, BOR work plan and budget | ||
− | *(Th) July 13, 10a - 12n MDT: SAP comments on GCMRC work plan (and BOR if available), Projects A, B, and J | + | *(Th) July 13, 10a - 12n MDT: SAP comments on GCMRC work plan (and BOR if available), Projects A (Streamflow, Water Quality, and Sediment Transport), B (Sandbar and Sediment Storage), and J (Socioeconomic) |
− | *(Th) July 20, 10a - 12n MDT: Projects E, F, and G | + | *(Th) July 20, 10a - 12n MDT: Projects E (Nutrients and Temperature), F (Aquatic Invertebrate Ecology), and G (Humpback Chub) |
− | *(Th) July 27, 10a - 12n MDT: Projects H, I, K, and L | + | *(Th) July 27, 10a - 12n MDT: Projects H (Trout), I (Non-natives), K (Geospatial Science), and L (Overflight) |
− | *(Th) Aug 3, 10a - 12n MDT: Projects C, D, and M | + | *(Th) Aug 3, 10a - 12n MDT: Projects C (Riparian Vegetation), D (Vegetation Management for Dunefields, Terraces, and Archaeological Sites), and M (Administration) |
|- | |- | ||
Line 99: | Line 99: | ||
*July 1: Draft full workplan (Second Draft) to Sound Science and BAHG / TWG, DOI, Tribes | *July 1: Draft full workplan (Second Draft) to Sound Science and BAHG / TWG, DOI, Tribes | ||
*July 6: Review process, general overview, BOR work plan and budget | *July 6: Review process, general overview, BOR work plan and budget | ||
− | *July 13: | + | *July 13: Science Advisers comments on GCMRC work plan (and BOR if available), GCMRC review Projects A (Streamflow, Water Quality, and Sediment Transport), B (Sandbar and Sediment Storage), and J (Socioeconomic) |
− | *July 20: GCMRC review Projects E, F, and G | + | *July 20: GCMRC review Projects Projects E (Nutrients and Temperature), F (Aquatic Invertebrate Ecology), and G (Humpback Chub) |
− | *July 27: GCMRC review Projects H, I, K, and L | + | *July 27: GCMRC review Projects Projects H (Trout), I (Non-natives), K (Geospatial Science), and L (Overflight) |
− | *August 3: GCMRC review Projects C, D, and M | + | *August 3: GCMRC review Projects Projects C (Riparian Vegetation), D (Vegetation Management for Dunefields, Terraces, and Archaeological Sites), and M (Administration) |
− | *August ??: BAHG | + | *August 3??: BAHG call to discuss Second Draft |
+ | *August ??: BAHG written comments due to GCMRC / Reclamation | ||
*August ??: BAHG and Sound Science meeting (conference call) to review Science Advisers comments | *August ??: BAHG and Sound Science meeting (conference call) to review Science Advisers comments | ||
− | |||
− | |||
*August 18: Draft (Third / Final Draft) to TWG | *August 18: Draft (Third / Final Draft) to TWG | ||
+ | *August 24??: BAHG call to discuss Third Draft?? | ||
*August ??: GCMRC and Reclamation provide a final draft TWP to the AMWG for their review. | *August ??: GCMRC and Reclamation provide a final draft TWP to the AMWG for their review. | ||
*August 30-31: TWG meeting at GCMRC (Flagstaff) to discuss and approve budget | *August 30-31: TWG meeting at GCMRC (Flagstaff) to discuss and approve budget |
Revision as of 14:26, 17 July 2017
|
The Budget Ad Hoc Group PageLatest ChargeThe Budget Ad Hoc (BAHG) will develop an annual budget recommendation (biennial) for TWG utilizing input from the CRAHG, GCMRC, and BOR. This is to include an initial budget recommendation during the spring TWG meeting and a final recommendation during the summer TWG meeting. The BAHG should also draft an update to Appendix H in the Strategic Plan which describes the current budget process. Originally established November 12, 2003. Re-established June 22, 2009. |
Background Information | Budget Page | USBR Link to TWG Ad-Hocs and Membership |
---|
|