Difference between revisions of "GCDAMP Planning"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
(14 intermediate revisions by the same user not shown) | |||
Line 22: | Line 22: | ||
|style="width:60%; font-size:120%;"| | |style="width:60%; font-size:120%;"| | ||
− | ==''' | + | =='''GCDAMP Guiding Documents'''== |
The GCDAMP is based on an adaptive environmental assessment and management (AEAM) | The GCDAMP is based on an adaptive environmental assessment and management (AEAM) | ||
approach to natural resources management (Holling, 1978; Walters, 1986), now commonly | approach to natural resources management (Holling, 1978; Walters, 1986), now commonly | ||
Line 48: | Line 48: | ||
----------Strapline immediately below banner----------> | ----------Strapline immediately below banner----------> | ||
{| style="width:100%; height:50px" border=1px solid #ccc; background:#cedff2 | {| style="width:100%; height:50px" border=1px solid #ccc; background:#cedff2 | ||
+ | ! style="width=20%; background:#cedff2;" | [http://gcdamp.com/index.php?title=Long-term_Experimental_and_Management_Plan_(LTEMP) Long-term Experimental and Management Plan (LTEMP)] <br> The LTEMP provides the basis for decisions that identify management actions and experimental options that will provide a framework for adaptively managing Glen Canyon Dam operations over the next 20 years | ||
+ | |||
+ | ! style="width=20%; background:#cedff2;" | [https://pubs.usgs.gov/of/2017/1006/ofr20171006.pdf LTEMP Science Plan] <br> The LTEMP Science Plan describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to DOI, its bureaus, and to the GCDAMP in support of implementation of LTEMP. | ||
+ | |||
! style="width=20%; background:#cedff2;" | [[GCDAMP Strategic Plan]] <br> The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions. | ! style="width=20%; background:#cedff2;" | [[GCDAMP Strategic Plan]] <br> The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions. | ||
Line 63: | Line 67: | ||
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | |class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | ||
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | {|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | ||
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;"> | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;">Guiding Documents</h2> |
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
− | ==''' Vision and Mission ''' == | + | =='''2016 LTEMP ROD'''== |
+ | The DOI will work in consultation with the AMWG to update GCDAMP guiding documents (e.g., GCDAMP strategic plan, vision, mission, and charters) to reflect and be fully consistent with the priorities expressed in the FEIS and in this ROD. The goals and objectives in Section l.4 of the LTEMP FEIS will be carried forward as the goals in the GCDAMP guiding documents. Processes and documents will be evaluated and streamlined or combined as necessary. The DOI, in consultation with the AMWG, will develop monitoring metrics for the goals and objectives using those in Appendix C of the FEIS as a starting point. [https://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf] | ||
+ | |||
+ | ==''' Vision and Mission '''[http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf] == | ||
The combined Vision and Mission statement reads as follows: | The combined Vision and Mission statement reads as follows: | ||
Line 76: | Line 83: | ||
*We do so in keeping with the federal trust responsibilities to Indian tribes, in compliance with applicable federal, state, and tribal laws, including the water delivery obligations of the Law of the River, and with due consideration to the economic value of power resources. | *We do so in keeping with the federal trust responsibilities to Indian tribes, in compliance with applicable federal, state, and tribal laws, including the water delivery obligations of the Law of the River, and with due consideration to the economic value of power resources. | ||
− | *This will be accomplished through our long-term partnership utilizing the best available scientific and other information through an adaptive ecosystem management process. | + | *This will be accomplished through our long-term partnership utilizing the best available scientific and other information through an adaptive ecosystem management process. |
− | ==''' Principles ''' == | + | ==''' Principles ''' [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf]== |
The nine principles of the Glen Canyon Dam Adaptive Management Program are: | The nine principles of the Glen Canyon Dam Adaptive Management Program are: | ||
# The goals represent a set of desired outcomes that together will accomplish our vision and achieve the purpose of the Grand Canyon Protection Act. Some of the objectives and actions that fall under these goals may not be the responsibility of the Adaptive Management Program, and may be funded by other sources, but are included here for completeness. | # The goals represent a set of desired outcomes that together will accomplish our vision and achieve the purpose of the Grand Canyon Protection Act. Some of the objectives and actions that fall under these goals may not be the responsibility of the Adaptive Management Program, and may be funded by other sources, but are included here for completeness. | ||
Line 88: | Line 95: | ||
# Because management actions to achieve a goal may benefit one resource or value and adversely affect another, those action alternatives that benefit all resources and values will be pursued first. When this is not possible, actions that have a neutral impact, or as a last resort, actions that minimize negative impacts on other resources, will be pursued consistent with the Glen Canyon Dam Environmental Impact Statement and the Record of Decision. | # Because management actions to achieve a goal may benefit one resource or value and adversely affect another, those action alternatives that benefit all resources and values will be pursued first. When this is not possible, actions that have a neutral impact, or as a last resort, actions that minimize negative impacts on other resources, will be pursued consistent with the Glen Canyon Dam Environmental Impact Statement and the Record of Decision. | ||
# If the target of a management objective proves to be inappropriate, unrealistic, or unattainable, the Adaptive Management Program will reevaluate that target and the methods used to attain it. | # If the target of a management objective proves to be inappropriate, unrealistic, or unattainable, the Adaptive Management Program will reevaluate that target and the methods used to attain it. | ||
− | # Recognizing the diverse perspectives and spiritual values of the stakeholders, the unique aesthetic value of the Grand Canyon will be respected and enhanced. [ | + | # Recognizing the diverse perspectives and spiritual values of the stakeholders, the unique aesthetic value of the Grand Canyon will be respected and enhanced. |
+ | |||
+ | =='''Priorities of the GCDAMP'''== | ||
+ | The GCDAMP priorities are set by the GCPA of 1992, the LTEMP FEIS, and ROD, and related mitigation requirements for endangered species and cultural resources. The GCDAMP priorities include the management and experimental actions; mitigation and environmental commitments; and research and monitoring identified in the L TEMP FEIS and ROD, and these will be the highest priorities for GCDAMP over the term of the LTEMP. [https://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf] | ||
==''' GCDAMP Goals ''' == | ==''' GCDAMP Goals ''' == | ||
Line 110: | Line 120: | ||
# Which [http://gcdamp.com/index.php?title=CULTURAL '''cultural resources'''], including traditional cultural properties, are within the area of potential effect, which should we treat, and how do we best protect them? What is the status and trends of cultural resources and what are the agents of deterioration? | # Which [http://gcdamp.com/index.php?title=CULTURAL '''cultural resources'''], including traditional cultural properties, are within the area of potential effect, which should we treat, and how do we best protect them? What is the status and trends of cultural resources and what are the agents of deterioration? | ||
# What is the best [http://gcdamp.com/index.php?title=GCDAMP_Glen_Canyon_Dam '''flow regime''']? | # What is the best [http://gcdamp.com/index.php?title=GCDAMP_Glen_Canyon_Dam '''flow regime''']? | ||
− | # What is the impact of [http://gcdamp.com/index.php?title=GCDAMP_Sediment '''sediment''']loss and what should we do about it? | + | # What is the impact of [http://gcdamp.com/index.php?title=GCDAMP_Sediment '''sediment'''] loss and what should we do about it? |
# What will happen when a [http://gcdamp.com/index.php?title=TEMPERATURE '''temperature control device'''] is tested or implemented? How should it be operated? Are safeguards needed for management? | # What will happen when a [http://gcdamp.com/index.php?title=TEMPERATURE '''temperature control device'''] is tested or implemented? How should it be operated? Are safeguards needed for management? | ||
Line 127: | Line 137: | ||
|style="color:#000;"| | |style="color:#000;"| | ||
− | *[ | + | *[http://gcdamp.com/index.php?title=Long-term_Experimental_and_Management_Plan_(LTEMP) The Long-term Experimental and Management Plan (LTEMP)] |
+ | *[https://pubs.usgs.gov/of/2017/1006/ofr20171006.pdf LTEMP Science Plan ] | ||
+ | *[http://gcdamp.com/index.php?title=Portal:GCDAMP_DOI_Direction DOI Direction] | ||
*[[Portal:Desired Future Conditions -DFCs| 2012 Desired Future Conditions]] | *[[Portal:Desired Future Conditions -DFCs| 2012 Desired Future Conditions]] | ||
*[[PEP reviews]] | *[[PEP reviews]] | ||
Line 148: | Line 160: | ||
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
+ | |||
+ | '''2022''' | ||
+ | *[[Media:Grand Canyon 2022 Question about AMP 2nd version.docx| 2022 AMWG river trip: Question about AMP]] | ||
+ | *[[Media:Grand Canyon 2022 AMP Vision and Mission fourth version with track changes.docx| 2022 AMWG river trip: Discussions on the AMP Vision and Mission]] | ||
+ | *[[Media:Grand Canyon 2022 Discussion about the TWG and AMWG second version.docx| 2022 AMWG river trip: Discussion about the TWG and AMWG]] | ||
+ | *[[Media:Grand Canyon 2022 Small Mouth Bass second version.docx| 2022 AMWG river trip: Discussions on Grand Canyon Smallmouth Bass]] | ||
+ | |||
+ | '''2021''' | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2021-10-14-twg-meeting/20211014-ExampleMetricsLong-TermExperimentalManagementPlan-Presentation-508-UCRO.pdf Example Metrics for the Long-Term Experimental and Management Plan] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2021-06-17-twg-meeting/20210617-MonitoringMetrics-DraftPlan-508-UCRO.pdf Monitoring Metrics Draft Plan ] | ||
'''2018''' | '''2018''' | ||
− | *[https://www.usbr.gov/uc/ | + | *[https://www.usbr.gov/uc/progact/amp/amwg/2018-08-22-amwg-meeting/Attach_01.pdf GCDAMP Program Goals PPT] |
*[https://www.usbr.gov/uc/rm/amp/twg/mtgs/18apr23/Attach_04.pdf AMWG Desired Future Conditions PPT] | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/18apr23/Attach_04.pdf AMWG Desired Future Conditions PPT] | ||
*[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/18feb14/Attach_04a.pdf AMWG Desired Future Conditions PPT] | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/18feb14/Attach_04a.pdf AMWG Desired Future Conditions PPT] |
Latest revision as of 13:32, 25 September 2024
|
GCDAMP Guiding DocumentsThe GCDAMP is based on an adaptive environmental assessment and management (AEAM) approach to natural resources management (Holling, 1978; Walters, 1986), now commonly called ―adaptive management. The approach assumes that managed natural resources will always change, that scientific understanding of ecosystems is constantly improving, and that natural resource managers need the best available information to make decisions. AEAM unites the strengths of different scientific disciplines to meet the information needs of resource managers. It encourages scientists and managers to work collaboratively to use scientific information in the management process. AEAM consists of two parts—adaptive assessment and adaptive management. Assessment investigates how ecological systems work and evaluates management alternatives to achieve goals. Management involves learning by doing and testing, which may include monitoring system responses to natural changes (passive adaptive management) or deliberate manipulation of key processes (active adaptive management). Adaptive management acknowledges that policies must satisfy social objectives, but policies also need to adapt to both changes in understanding and changes in managed systems. Managers using an AEAM approach learn how a natural system works and how their actions affect the system; this knowledge helps them to perform better in complex and uncertain environments. |
Long-term Experimental and Management Plan (LTEMP) The LTEMP provides the basis for decisions that identify management actions and experimental options that will provide a framework for adaptively managing Glen Canyon Dam operations over the next 20 years |
LTEMP Science Plan The LTEMP Science Plan describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to DOI, its bureaus, and to the GCDAMP in support of implementation of LTEMP. |
GCDAMP Strategic Plan The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions. |
Strategic Science Plan The GCMRC Strategic Science Plan (SSP) identifies general strategies for the next 5 years to provide science information responsive to the goals, management objectives, and priority questions as described in the AMPSP and other planning direction approved by the AMWG. |
Core Monitoring Plan The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources. |
Monitoring and Research Plan The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next 5 years to address some of the strategic science questions associated with AMWG priority questions. |
Triennial Work Plan (TWP) The GCMRC Triennial Work Plan (TWP) identifies the scope, objectives, and budget for monitoring and research activities planned for a 3-year period. When completed, the triennial work plan will be consistent with the MRP. |
---|
|