File list
This special page shows all uploaded files.
First page |
Previous page |
Next page |
Last page |
Date | Name | Thumbnail | Size | User | Description | Versions |
---|---|---|---|---|---|---|
11:20, 5 February 2024 | DebrisFlowRisk ARM Poster reviewed2.pdf (file) | 54.75 MB | Cellsworth | Debris flow risk at campsites in Grand Canyon | 1 | |
10:35, 27 October 2014 | Final render (new).mp4 (file) | 47.82 MB | Jdabrowski | 1 | ||
12:43, 15 June 2015 | As Lake Mead Dries Up, Engineers Dig Deep For Water NBC Nightly News.mp4 (file) | 36.7 MB | Jthiriot | 1 | ||
10:29, 14 November 2017 | BarrettCliff May15.m4a (file) | 34.59 MB | Cellsworth | Cliff Barrett Administrative History interview 2017 | 1 | |
05:54, 15 December 2023 | 2023 Biowest Razorback Sucker Monitoring Annual Report.pdf (file) | 20.41 MB | Cellsworth | 1 | ||
07:05, 15 August 2014 | Quaggas Pipe 2013.mp4 (file) | 16.31 MB | Vkartha | Video showing how quickly Quaggas grow - Courtesy Salt River Project | 1 | |
08:55, 11 July 2016 | Zuni2015ColoradoRiverMonitoringReport.pdf (file) | 16.21 MB | 140.217.10.10 | 1 | ||
11:13, 24 October 2016 | Zuni2015ColoradoRiverMonitoringReport (1).pdf (file) | 16.21 MB | 140.217.10.10 | 2015 Tribal Monitoring Report | 1 | |
11:14, 24 October 2016 | Zuni2015ColoradoRiverMonitoringReport (2).pdf (file) | 16.21 MB | 140.217.10.10 | 1 | ||
10:49, 20 October 2021 | 2021SDF routing.png (file) | Error creating thumbnail: File with dimensions greater than 12.5 MP |
15.24 MB | Cellsworth | 1 | |
05:00, 27 March 2017 | ZuniColoradoRiverMonitoringTrip 2016 FinalReport 24March2017.pdf (file) | 14.98 MB | 140.217.10.10 | 2016 Zuni river monitoring report | 1 | |
11:56, 10 September 2021 | IMG 5182.JPG (file) | 13.13 MB | Cellsworth | 1 | ||
05:21, 11 March 2014 | Locations and Geography- Training course- DRAFT Print.pdf (file) | 12.76 MB | Jthiriot | Online Training Course- DRAFT Locations and Geography | 1 | |
12:05, 10 September 2021 | IMG 5221.JPG (file) | 12.73 MB | Cellsworth | 1 | ||
11:00, 9 May 2014 | 2014 4 TWG budget overview-GCMRC.PDF (file) | 12.66 MB | Jthiriot | GCMRC-2014 Budget | 1 | |
12:05, 21 September 2022 | Sep2022 Information.pdf (file) | 12.33 MB | Cellsworth | 1 | ||
08:20, 22 September 2017 | CRI LGC 15 FINAL.docx (file) | 12.09 MB | Cellsworth | Razorback Sucker Xyrauchen texanus Research and Monitoring in the Colorado River Inflow Area of Lake Mead and the Lower Grand Canyon, Arizona and Nevada 2015 FINAL ANNUAL REPORT | 1 | |
12:08, 10 September 2021 | IMG 5206.JPG (file) | 11.8 MB | Cellsworth | 1 | ||
07:06, 13 May 2014 | SO12 Stewart.pdf (file) | 11.75 MB | 159.87.24.2 | Arizona Game and Fish Wildlife Views article titled "A Changing Grand Canyon: Can high flows help?" Published October 2012. | 1 | |
07:51, 30 August 2022 | Aug2022 Information.pdf (file) | 11.55 MB | Cellsworth | 1 | ||
06:41, 30 May 2017 | IMG 6808.JPG (file) | 11.53 MB | Cellsworth | Screen between the upper and lower sloughs | 1 | |
11:08, 10 September 2021 | IMG 4891.JPG (file) | 11.44 MB | Cellsworth | 1 | ||
07:28, 28 February 2014 | 140228 Van Haverbeke et al 2013.PDF (file) | 11.34 MB | Jthiriot | Hello Linda et al, I thought I'd distribute our 2013 annual report entitled "Mark Recapture and Fish Monitoring Activities in the Little Colorado River in Grand Canyon from 2000-2013" As the title suggests, this represents a synthesis of work from the | 1 | |
04:24, 10 July 2013 | 130701 USFW LT monitoring of an endangered fish- Dynamics 082012-JFWM-071.PDF (file) | 11.34 MB | Jthiriot | 1 | ||
11:36, 19 May 2016 | Kennedy 2016 HydropowerEPT.pdf (file) | 11.31 MB | Cellsworth | 1 | ||
07:22, 19 May 2016 | 2009 BOR GCDforebayFish.pdf (file) | 11.24 MB | Cellsworth | Fish surveys in the Glen Canyon Dam forebay | 1 | |
10:57, 5 January 2021 | GCMRC FY20 ANNUAL REPORT-Final 12.18.2020.pdf (file) | 11.2 MB | Cellsworth | Fiscal Year 2020 Annual Project Report to the Glen Canyon Dam Adaptive Management Program | 1 | |
10:03, 4 January 2018 | CRI LGC 2017 Final.pdf (file) | 11.19 MB | 140.217.10.80 | BioWest-Razorback Sucker 2017 Final Report | 1 | |
10:28, 22 June 2022 | Jun2022 Information.pdf (file) | 11.09 MB | Cellsworth | 1 | ||
12:12, 10 September 2021 | IMG 5262.JPG (file) | 11.07 MB | Cellsworth | 1 | ||
10:36, 11 September 2023 | August2023 Information.pdf (file) | 11.07 MB | Cellsworth | 1 | ||
09:06, 28 March 2013 | Jennifer's Western Water 111512 NV Measures for Drought (Compatibility Mode).pdf (file) | 11 MB | 1 | |||
11:12, 10 September 2021 | IMG 4958.JPG (file) | 10.9 MB | Cellsworth | 1 | ||
11:25, 5 February 2024 | Dean Topping 2024 VegFeedbacks ARM Poster revised loRes.pdf (file) | 10.81 MB | Cellsworth | The Effects of Vegetative Feedbacks on Flood Shape, Sediment Transport, and Geomorphic Change in Dryland Rivers | 1 | |
06:56, 4 January 2022 | GCMRC ANNUAL REPORT FY2021-FINAL 508.pdf (file) | 10.47 MB | Cellsworth | GCMRC FY21 Annual Project Report | 1 | |
05:01, 6 February 2024 | 20240125-AnnualReportingMeeting-ProceedingsFiscalYear2023-508-UCRO.pdf (file) | 10.33 MB | Cellsworth | Proceedings of the Fiscal Year 2023Annual Reporting Meeting to the Glen Canyon Dam Adaptive Management Program | 1 | |
11:49, 10 September 2021 | IMG 5128.JPG (file) | 10.28 MB | Cellsworth | 1 | ||
12:12, 2 June 2022 | May2022 Information.pdf (file) | 9.99 MB | Cellsworth | 1 | ||
06:35, 27 November 2019 | Welsh1995.pdf (file) | 9.85 MB | Cellsworth | Welsh, M.P., Bishop, R.C., Phillips, M.L., and Baumgartner, R.M., 1995, GCES non-use values final study summary report--Glen Canyon Dam, Colorado River storage project: Madison, Wis., prepared for Glen Canyon Environmental Studies, 54 p. | 1 | |
08:08, 17 April 2024 | 202404 Information.pdf (file) | 9.83 MB | 136.226.6.197 | 1 | ||
12:14, 10 September 2021 | IMG 5281.JPG (file) | 9.79 MB | Cellsworth | 1 | ||
11:28, 30 June 2023 | Dibble Yackulic 2023 Assessement potential recovery CO pikeminnonw GrandCanyon.pdf (file) | 9.69 MB | Cellsworth | Dibble KL, Yackulic CB, Bestgen KR, Gido K, Tildon Jones M, McKinstry MC, 75 Osmundson DB, Ryden D, Schelly RC 2023. Assessment of potential recovery viability for 76 Colorado Pikeminnow Ptychocheilus lucius in the Colorado River in Grand Canyon. Journal of 77 Fish and Wildlife Management 14(1):xx-xx; e1944-687X. https://doi.org/10.3996/JFWM-22-031 | 1 | |
06:36, 14 November 2022 | GCMRC TWP2021-23 December2 2020 ApprovedBySecretary.pdf (file) | 9.63 MB | Cellsworth | 1 | ||
11:37, 10 September 2021 | IMG 5099.JPG (file) | 9.48 MB | Cellsworth | 1 | ||
08:30, 31 December 2018 | 2018 RBS CRI LGC.pdf (file) | 9.44 MB | Cellsworth | Razorback Sucker Xyrauchen texanus Research and Monitoring in the Colorado River Inflow Area of Lake Mead and the Lower Grand Canyon, Arizona and Nevada 2018 FINAL ANNUAL REPORT | 1 | |
05:51, 2 May 2022 | Mar2022 Information.pdf (file) | 9.4 MB | Cellsworth | 1 | ||
11:20, 10 September 2021 | IMG 4980.JPG (file) | 9.32 MB | Cellsworth | 1 | ||
12:19, 10 September 2021 | IMG 5310.JPG (file) | 8.93 MB | Cellsworth | 1 | ||
05:44, 4 November 2016 | CottonwoodTree.JPG (file) | 8.81 MB | Cellsworth | Cottonwood tree | 1 | |
12:36, 9 August 2016 | Sankey 2016 TamariskRemoteSensing.pdf (file) | 8.8 MB | Cellsworth | Sankey, T.T., Sankey, J.B., Horne, R., Bedford, A., 2016, Remote Sensing of Tamarisk Biomass, Insect Herbivory, and Defoliation: Novel Methods in the Grand Canyon Region, Arizona: Photogrammetric Engineering and Remote Sensing 82(8), pp. 645-652 | 1 |
First page |
Previous page |
Next page |
Last page |