File list
This special page shows all uploaded files.
First page |
Previous page |
Next page |
Last page |
| Date | Name | Thumbnail | Size | Description | Versions |
|---|---|---|---|---|---|
| 05:18, 14 October 2026 | WaterUse.png (file) | 189 KB | 1 | ||
| 05:18, 14 October 2026 | Temp Precip Flows.png (file) | 193 KB | 1 | ||
| 10:17, 13 October 2026 | Glen Canyon Fish Escapement Appraisal Report 05.2024 FINAL.pdf (file) | 10.91 MB | 2024 Glen Canyon Dam Fish Escapement Appraisal Study | 1 | |
| 11:47, 8 September 2026 | 2021 Glen Canyon Dam Interagency Agreementnwgp (fully signed).pd.pdf (file) | 267 KB | 1 | ||
| 11:44, 8 September 2026 | 202608 Information.pdf (file) | 13.28 MB | 1 | ||
| 11:43, 8 September 2026 | 202607 Information.pdf (file) | 14.36 MB | 1 | ||
| 10:58, 8 September 2026 | BAO Approved-Tribal MetricsPoster,MAnderson 20260128 1022.pdf (file) | 1.71 MB | 1 | ||
| 10:58, 8 September 2026 | BAO Approved-Hydropower Metrics Poster-MAnderson 20260122 1511.pdf (file) | 1.6 MB | 1 | ||
| 10:57, 8 September 2026 | BAO Approved-Recreation Metrics Poster-MAnderson 20260122.pdf (file) | 887 KB | 1 | ||
| 07:30, 8 September 2026 | Metrics.jpg (file) | 9 KB | 1 | ||
| 07:41, 4 September 2026 | LakeMeadOperations.png (file) | 39 KB | 1 | ||
| 07:41, 4 September 2026 | LakePowellOperations.png (file) | 89 KB | 1 | ||
| 06:17, 4 September 2026 | IMG 4472.JPG (file) | 7.8 MB | The post marking the division of the Upper and Lower Basins at Lees Ferry | 1 | |
| 10:09, 3 September 2026 | Neher 2017 Testing limits temporal stability GC boaters pay values.pdf (file) | 769 KB | Neher et al., 2017, Testing the limits of temporal stability—Willingness to pay values among Grand Canyon whitewater boaters across decades. Water Resource Research | 1 | |
| 07:37, 20 August 2026 | Korman et al 2023 TroutExperimentalFlows.pdf (file) | 2.37 MB | Korman et al. 2023. Drought-related changes in water quality surpass effects of experimental flows on trout growth downstream of Lake Powell reservoir. Can. J. Fish. Aquat. Sci. 80: 424–438 | 1 | |
| 11:44, 19 August 2026 | Figure 4 (1).jpg (file) | 68 KB | Figure 4. Rainbow trout abundance over time at site 1C during the TRGD trips (USGS 2025). | 1 | |
| 11:42, 19 August 2026 | Figure 3 (1).jpg (file) | 72 KB | Figure 3. Estimated June Monthly release volume scenarios for a spring High-Flow Experiment based on the 24-month study in April of 2026. | 1 | |
| 11:40, 19 August 2026 | Figure 2 (1).jpg (file) | 54 KB | Figure 2. Hydrograph and modeled sand mass balance under a potential deferring to a fall 2026 HFE (Option 2). Red shaded areas on Option 2 indicate where previous HFEs were triggered but not implemented. The green shaded area on Option 2 indicates where a potential spring HFE would be implemented in May and June if triggered. Subject to minor revision. | 1 | |
| 11:35, 19 August 2026 | Figure 1 (1).jpg (file) | 40 KB | Figure 1. Hydrograph and modeled sand mass balance for proposed spring 2026 High-Flow Experiment (Option 1-3) Subject to minor revision. | 1 | |
| 09:05, 19 August 2026 | 2025 Fall HFE PI Tech Recomendation.docx (file) | 26 KB | 1 | ||
| 09:05, 19 August 2026 | 2025 Fall HFE Tech Report.docx (file) | 4.63 MB | 1 | ||
| 08:54, 19 August 2026 | Spring 2025 HFE Recommendation and Technical Memo 4 7 2025 DRAFT.docx (file) | 4.11 MB | 1 | ||
| 12:05, 12 August 2026 | 2026 Spring HFE Tech Report.pdf (file) | 1.29 MB | 1 | ||
| 12:03, 12 August 2026 | 2026 Spring HFE Tech Report.docx (file) | 4.42 MB | 1 | ||
| 11:56, 12 August 2026 | 2026 Summer LTEMP SEIS Technical Report.pdf (file) | 2.72 MB | 2026 Cool Mix tech team report | 1 | |
| 11:46, 12 August 2026 | 2026 Cool Mix Flow Decision for Glen Canyon Dam.pdf (file) | 112 KB | INFO - 2026 Cool Mix Flow Decision for Glen Canyon Dam | 1 | |
| 10:22, 18 June 2026 | 202606 Information.pdf (file) | 12.56 MB | 1 | ||
| 10:17, 18 June 2026 | 202605 Information.pdf (file) | 11.7 MB | 1 | ||
| 10:17, 18 June 2026 | 202604 Information.pdf (file) | 13.14 MB | 1 | ||
| 04:46, 18 June 2026 | 2026 Humpback Chub, Nonnative Invasive Species, and Other Native Fish Knowledge Workshop Summary.pdf (file) | 603 KB | 1 | ||
| 12:05, 17 June 2026 | Donovan etal 2026 Timing uncertainty opportunity cost ecosys mod CR.pdf (file) | 2.49 MB | Donovan, P., Bair, L.S., Reimer, M.N., Springborn, M.R., and Yackulic, C.B., 2026, Timing, uncertainty, and opportunity cost—Lessons for ecosystem modification on the Colorado river: Journal of Environmental Economics and Management | 1 | |
| 04:51, 12 June 2026 | BAO Approved POSTER Dzul IP-186132 HBC Metrics 2025 v3,1-28-2026.pdf (file) | 1.17 MB | 1 | ||
| 07:49, 4 May 2026 | Kelly Burke.png (file) | 367 KB | 1 | ||
| 06:40, 8 April 2026 | RiverAsTeacher.jpg (file) | 109 KB | 1 | ||
| 10:26, 23 March 2026 | 202602 Information.pdf (file) | 12.5 MB | 1 | ||
| 10:25, 23 March 2026 | 202603 Information.pdf (file) | 11.21 MB | 1 | ||
| 05:26, 10 March 2026 | USGS GCMRC Status of LTEMP Metrics Report Dec11 2025-508Comp.pdf (file) | 9.63 MB | 1 | ||
| 11:53, 6 March 2026 | Goal 11 Riparian Vegetation.jpg (file) | 479 KB | 1 | ||
| 11:47, 6 March 2026 | Goal 2 Natural Processes Metrics.jpg (file) | 481 KB | 1 | ||
| 11:15, 6 March 2026 | NaturalProcessesMetricsPoster reconciled.pdf (file) | 2.17 MB | 1 | ||
| 05:53, 27 February 2026 | 1996 GCPA nonreimbursability early ltr.pdf (file) | 2.43 MB | 1996 Letter: Financial Aspects of the Grand Canyon Protection Act - Nonreimbursablity Letter | 1 | |
| 10:26, 11 February 2026 | 1992 Shelby et al.pdf (file) | 858 KB | Shelby et al. 1992. Effects of Streamflows on River Trips on the Colorado River in Grand Canyon, Arizona. Rivers. Volume 3, Number 3. Pages 191-201 | 1 | |
| 06:09, 11 February 2026 | 2025ARM HydropowerPoster 20250122.pdf (file) | 0 bytes | 1 | ||
| 11:56, 23 January 2026 | 202601 Information.pdf (file) | 11.04 MB | 1 | ||
| 07:38, 21 January 2026 | December 2025 TWG Meeting Summary.docx (file) | 31 KB | 1 | ||
| 07:30, 21 January 2026 | GCDAMP Hydropower Workshop Summary Final.docx (file) | 74 KB | 1 | ||
| 07:40, 29 December 2025 | 2024 smb edna.png (file) | 279 KB | 1 | ||
| 06:44, 9 December 2025 | TWP FY2025-27 BOR GCMRC Final 10.25.2024.pdf (file) | 20.12 MB | 1 | ||
| 04:33, 3 November 2025 | Figure 1.jpg (file) | 61 KB | 2025 Fall High Flow Experiment | 1 | |
| 04:33, 3 November 2025 | Figure 2.jpg (file) | 84 KB | 2025 Fall High Flow Experiment | 1 |
First page |
Previous page |
Next page |
Last page |