File list
This special page shows all uploaded files.
First page |
Previous page |
Next page |
Last page |
Date | Name | Thumbnail | Size | User | Description | Versions |
---|---|---|---|---|---|---|
11:07, 5 February 2024 | TWG-ARM-FY22-ModernizingDataTelemetryColoradoRiver.pdf (file) | 7.2 MB | Cellsworth | Modernizing data telemetry efforts for important riparian resources in Grand Canyon | 1 | |
11:04, 5 February 2024 | Columbine ARmtg 20230201 final.pdf (file) | 4 MB | Cellsworth | Channel Response to the 2021 Spring Disturbance Flow in Western Grand Canyon | 1 | |
11:03, 5 February 2024 | ARM salter.pdf (file) | 1.6 MB | Cellsworth | Numerical Modeling of Mud Transport, Storage, and Release on the Colorado River, Arizona | 1 | |
11:01, 5 February 2024 | Wehr-Wrey-Stevens diatoms.pdf (file) | 3.52 MB | Cellsworth | Changes in epiphytic diatoms in the Colorado River downstream of Glen Canyon Dam following reduced flow variation | 1 | |
11:00, 5 February 2024 | GCDAMP wiki poster.pdf (file) | 8.48 MB | Cellsworth | Wiki poster | 1 | |
10:57, 5 February 2024 | BAO Approved-LHansen-Rev Poster.pdf (file) | 1.82 MB | Cellsworth | A Decade of GPP Data in a Changing River | 1 | |
10:54, 5 February 2024 | ARM HBC Growth Poster 2024 V2 final.pdf (file) | 1.61 MB | Cellsworth | Humpback chub growth becomes resource dependent when released from temperature limitation | 1 | |
10:52, 5 February 2024 | ARM2024DSMDEMPoster IP-161668.pdf (file) | 3.38 MB | Cellsworth | Topographic Data from Airborne Image Acquisition of Colorado River Corridor in Grand Canyon National Park and Glen Canyon National Recreation Area: Digital Surface Models for 2002, 2009, 2013 and 2021 and Digital Elevation Model for 2021 | 1 | |
10:28, 5 February 2024 | ARM2024imageryPoster IP-161669.pdf (file) | 6.25 MB | Cellsworth | Four Band Image Mosaic of the Colorado River Corridor Downstream of Glen Canyon Dam in Arizona Derived from the May 2021 Airborne Image Acquisition | 1 | |
10:25, 5 February 2024 | Dean Topping 2024 VegFeedbacks ARM Poster revised loRes.pdf (file) | 10.81 MB | Cellsworth | The Effects of Vegetative Feedbacks on Flood Shape, Sediment Transport, and Geomorphic Change in Dryland Rivers | 1 | |
10:22, 5 February 2024 | CDI Workshop 2023 Poster Thomas SUBMITTED - Copy.pdf (file) | 2.01 MB | Cellsworth | Automating Sensor-to-Cloud Workflows for Riparian Resources in Grand Canyon | 1 | |
10:20, 5 February 2024 | DebrisFlowRisk ARM Poster reviewed2.pdf (file) | 54.75 MB | Cellsworth | Debris flow risk at campsites in Grand Canyon | 1 | |
10:16, 5 February 2024 | Sartain AGU2023 poster ARM.pdf (file) | 2.72 MB | Cellsworth | Assessing geomorphic change for 454 river km of the Colorado River in Grand Canyon, AZ via continuous and high-resolution water surface and bed profiles | 1 | |
10:13, 5 February 2024 | MonitoringPoster 20240119 ForBAO PDF.pdf (file) | 1.96 MB | Cellsworth | Riparian Plant Community Metrics | 1 | |
10:05, 5 February 2024 | Kaplinski Glen canyon flow model poster 20240114.pdf (file) | 3.41 MB | Cellsworth | Hydrodynamic modeling of the Colorado River between Glen Canyon Dam and Lees Ferry, Arizona | 1 | |
10:02, 5 February 2024 | Tango ARM2024 Poster IPDS.pdf (file) | 5.06 MB | Cellsworth | River management influences on archaeological site preservation: Results of more than a decade of monitoring geomorphic change along the Colorado River | 1 | |
11:14, 2 February 2024 | 202401 Information.pdf (file) | 6.59 MB | Cellsworth | 1 | ||
11:12, 2 February 2024 | 202312 Information.pdf (file) | 7.87 MB | Cellsworth | 1 | ||
10:53, 12 January 2024 | Korman et al 2022.pdf (file) | 2.37 MB | Cellsworth | Korman et al. 2023. Drought-related changes in water quality surpass effects of experimental flows on trout growth downstream of Lake Powell reservoir. Can. J. Fish. Aquat. Sci | 1 | |
04:54, 15 December 2023 | 2023 Biowest Razorback Sucker Monitoring Annual Report.pdf (file) | 20.41 MB | Cellsworth | 1 | ||
10:19, 7 December 2023 | LowerMarble2021 2023.png (file) | 127 KB | Cellsworth | 1 | ||
10:18, 7 December 2023 | UpperMarble2021 2023.png (file) | 117 KB | Cellsworth | 1 | ||
10:18, 7 December 2023 | PariaRiver2021 2023.png (file) | 25 KB | Cellsworth | 1 | ||
08:50, 7 December 2023 | 2023SpringHFEhydrograph.png (file) | 105 KB | Cellsworth | 1 | ||
08:39, 7 December 2023 | Fig3.png (file) | 49 KB | Cellsworth | Figure 3. Mass balance in Marble Canyon predicted by the Sand Routing Model (Wright et al. 2010) with a 1-year accounting window and a 72-hour HFE in April with a maximum magnitude of 39,500 cfs. | 1 | |
08:37, 7 December 2023 | Fig2.png (file) | 49 KB | Cellsworth | Figure 2. Marble Canyon Sand Mass Balance showing effects of high monthly volumes resulting from balancing for a 9.0 maf or higher Water Year. | 1 | |
08:32, 7 December 2023 | Fig1.png (file) | 36 KB | Cellsworth | Figure 1: Upper Marble Canyon Mass Balance since 2021. Most of the sand supplied in 2021 and 2022 is still in Upper Marble Canyon. | 1 | |
08:17, 7 December 2023 | 3 Spring 2023 Memorandum SIR.pdf (file) | 318 KB | Cellsworth | Reevaluation of the 2016 Long-term Experimental and Management Plan Final Environmental Impact Statement (LTEMP FEIS) and Record of Decision (ROD) for the 2023 Spring Flow Experiment (2023 April Experiment) | 1 | |
08:14, 7 December 2023 | 2 Final Technical Report and Recommendation Regarding a Spring Flow Experiment at Glen Canyon Dam, April 2023 (1).pdf (file) | 1.06 MB | Cellsworth | Final Technical Report and Recommendation Regarding a High Flow Experiment (HFE) at Glen Canyon Dam, April 2023 | 1 | |
06:57, 7 December 2023 | 1 Spring 2023 HFE - Decision Memo.pdf (file) | 298 KB | Cellsworth | Notification of Decision to Implement a Spring Flow Experiment at Glen Canyon Dam - Spring 2023 HFE - Decision Memo | 1 | |
04:56, 27 November 2023 | 202311 Information.pdf (file) | 7.02 MB | Cellsworth | 1 | ||
05:36, 18 October 2023 | 102023 Information.pdf (file) | 6.88 MB | 136.226.6.194 | 1 | ||
07:10, 2 October 2023 | September2023 Information.pdf (file) | 7.41 MB | Cellsworth | 1 | ||
09:42, 11 September 2023 | Glen Canyon Monthly Operations Call OCT draft.pdf (file) | 5.82 MB | Cellsworth | 1 | ||
09:36, 11 September 2023 | August2023 Information.pdf (file) | 11.07 MB | Cellsworth | 1 | ||
09:36, 11 September 2023 | July2023 Information.pdf (file) | 7.42 MB | Cellsworth | 1 | ||
09:35, 11 September 2023 | June2023 Information.pdf (file) | 4.75 MB | Cellsworth | 1 | ||
09:34, 11 September 2023 | May2023 Information.pdf (file) | 6.21 MB | Cellsworth | 1 | ||
09:34, 11 September 2023 | Apr2023 Information.pdf (file) | 5.07 MB | Cellsworth | 1 | ||
04:45, 29 August 2023 | MidgeCaddisCatch 2012to2022.PNG (file) | 249 KB | Cellsworth | 1 | ||
04:25, 29 August 2023 | Kennedy JuneTWG for BAO.pdf (file) | 5.28 MB | Cellsworth | Foodbase update | 1 | |
04:16, 29 August 2023 | 1100 TWGQnA bugflow 20230615.pdf (file) | 1.41 MB | Cellsworth | Bugflows Q&A | 1 | |
10:28, 30 June 2023 | Dibble Yackulic 2023 Assessement potential recovery CO pikeminnonw GrandCanyon.pdf (file) | 9.69 MB | Cellsworth | Dibble KL, Yackulic CB, Bestgen KR, Gido K, Tildon Jones M, McKinstry MC, 75 Osmundson DB, Ryden D, Schelly RC 2023. Assessment of potential recovery viability for 76 Colorado Pikeminnow Ptychocheilus lucius in the Colorado River in Grand Canyon. Journal of 77 Fish and Wildlife Management 14(1):xx-xx; e1944-687X. https://doi.org/10.3996/JFWM-22-031 | 1 | |
10:07, 27 June 2023 | WaterBalance.PNG (file) | 13 KB | Cellsworth | 1 | ||
10:06, 27 June 2023 | Pool-water-balance (1).gif (file) | Error creating thumbnail: convert: memory allocation failed `/tmp/transform_d9bbd9722e7c-1.gif' @ error/quantize.c/QuantizeImage/2653. convert: memory allocation failed `/tmp/transform_d9bbd9722e7c-1.gif' @ error/gif.c/WriteGIFImage/1693. Error code: 1 |
269 KB | Cellsworth | xx | 1 |
10:00, 27 June 2023 | Pool-water-balance.gif (file) | Error creating thumbnail: convert: memory allocation failed `/tmp/transform_f3fac976a9c7-1.gif' @ error/quantize.c/QuantizeImage/2653. convert: memory allocation failed `/tmp/transform_f3fac976a9c7-1.gif' @ error/gif.c/WriteGIFImage/1693. Error code: 1 |
269 KB | Cellsworth | 1 | |
09:19, 4 May 2023 | BasinFund.PNG (file) | 505 KB | Cellsworth | 1 | ||
05:56, 7 April 2023 | Mar2023 Information (1).pdf (file) | 7.41 MB | Cellsworth | 1 | ||
05:45, 31 March 2023 | Mar2023 Information.pdf (file) | 7.41 MB | Cellsworth | 1 | ||
09:16, 22 February 2023 | Feb2023 Information.pdf (file) | 7.46 MB | Cellsworth | 1 |
First page |
Previous page |
Next page |
Last page |