== '''Glen Canyon Monthly Operational Call''' == | == '''Glen Canyon Monthly Operational Call''' == | ||
| − | + | The DOI also will conduct monthly Glen Canyon Dam operational coordination meetings or calls with the DOI bureaus (USGS, NPS, FWS, BIA, and Reclamation), WAPA, AZGFD, and representatives from the Basin States and the UCRC. Each DOI bureau will provide updates on the status of resources and dam operations. In addition, WAPA will provide updates on the status of the Basin Fund, projected purchase power prices, and its financial and operational considerations. These meetings or calls are intended to provide an opportunity for participants to share and obtain the most up-to-date information on dam operational considerations and the status of resources (including ecological, cultural, Tribal, recreation, and the Basin Fund). One liaison from each Basin State and from the UCRC will be allowed to participate in the monthly operational coordination meetings or calls. [https://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf] | |
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | The slide decks for these calls can be found to the right on this page under Presentations and Papers. | |
| − | = | + | |- |
| − | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Critical Reservoir Elevations at Powell and Mead</h2> | |
| − | + | |- | |
| − | + | |style="color:#000;"| | |
| − | + | ||
| − | + | [[File:Glen_Canyon_critical_elevations.png|center|400px]] | |
| − | + | ||
| − | + | ||
| − | + | [[File:Mead_critical_elevations.png|center|400px]] | |
| − | + | ||
| − | + | ||
| − | + | [[File:Glen_Canyon_Dam_filling.png|center|400px]] <br> | |
| − | + | The back of Glen Canyon Dam as Lake Powell was filling showing the 8 penstocks on the right and the two river outlet works on the left. | |
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
|- | |- | ||
| Line 151: | Line 134: | ||
*Add release data to Western’s web site and provide periodic reports to the TWG on the operation of Glen Canyon Dam and, | *Add release data to Western’s web site and provide periodic reports to the TWG on the operation of Glen Canyon Dam and, | ||
*Continue efforts to for better coordination between Reclamation and Western regarding the scheduling and operation of Glen Canyon Dam.[https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | *Continue efforts to for better coordination between Reclamation and Western regarding the scheduling and operation of Glen Canyon Dam.[https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | ||
| + | |||
| + | |- | ||
| + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> The Law of the River [https://www.usbr.gov/lc/region/g1000/lawofrvr.html]</h2> | ||
| + | |- | ||
| + | |style="color:#000;"| | ||
| + | |||
| + | The Colorado River is managed and operated under numerous compacts, federal laws, court decisions and decrees, contracts, and regulatory guidelines collectively known as the "Law of the River." This collection of documents apportions the water and regulates the use and management of the Colorado River among the seven basin states and Mexico. Following is a synopsis of the most significant documents: | ||
| + | |||
| + | *[https://www.usbr.gov/lc/region/g1000/pdfiles/crbsalct.pdf The Colorado River Basin Salinity Control Act of 1974] - Authorized desalting and salinity control projects, including the Yuma Desalting Plant, to improve Colorado River quality. | ||
| + | |||
| + | *[https://www.usbr.gov/lc/region/g1000/pdfiles/min242.pdf Minute 242 of the U.S.-Mexico International Boundary and Water Commission of 1973] - Required the U.S. to take actions to reduce the salinity of water being delivered to Mexico at Morelos Dam. | ||
| + | |||
| + | *[https://www.usbr.gov/lc/region/g1000/pdfiles/opcriter.pdf The Criteria for Coordinated Long-Range Operation of Colorado River Reservoirs of 1970 (amended March 21, 2005)] - Provided for the coordinated operation of reservoirs in the upper and lower basins and set conditions for water releases from Lake Powell and Lake Mead. | ||
| + | |||
| + | *[https://www.usbr.gov/lc/region/g1000/pdfiles/crbproj.pdf The Colorado River Basin Project Act of 1968] - This Act authorized construction of a number of water development projects in both the upper and lower basins, including the Central Arizona Project (CAP). It also made the priority of the CAP water supply subordinate to California's apportionment in times of shortage, and directed the Secretary to prepare, in consultation with the Colorado River Basin states, long-range operating criteria for the Colorado River reservoir system. | ||
| + | |||
| + | *[https://www.usbr.gov/lc/region/g1000/pdfiles/supctdec.pdf The Arizona v. California U.S. Supreme Court Decision of 1964] - In 1963, the Supreme Court issued a decision settling a 25-year-old dispute between Arizona and California. The dispute stemmed from Arizona's desire to build the Central Arizona Project so it could use its full Colorado River apportionment. California objected and argued that Arizona's use of water from the Gila River, a Colorado River tributary, constituted use of its Colorado River apportionment, and that it had developed a historical use of some of Arizona's apportionment, which, under the doctrine of prior appropriation, precluded Arizona from developing the project. The Supreme Court rejected California's arguments, ruling that lower basin states have a right to appropriate and use tributary flows before the tributary co-mingles with the Colorado River, and that the doctrine of prior appropriation did not apply to apportionments in the lower basin. In 1964, the Court issued its decree. This decree enjoined the Secretary of the Interior from delivering water outside the framework of apportionments defined by the law and mandated the preparation of annual reports documenting the uses of water in the three lower basin states. In 1979, the Supreme Court issued a [https://www.usbr.gov/lc/region/g1000/pdfiles/scsuppdc.pdf Supplemental Decree] which addressed present perfected rights referred to in the Colorado River Compact and in the Boulder Canyon Project Act. These rights are entitlements essentially established under state law, and have priority over later contract entitlements. | ||
| + | |||
| + | *[https://www.usbr.gov/lc/region/g1000/pdfiles/crspuc.pdf Colorado River Storage Project of 1956] - Provided a comprehensive Upper Basin-wide water resource development plan and authorized the construction of Glen Canyon, Flaming Gorge, Navajo and Curecanti dams for river regulation and power production, as well as several projects for irrigation and other uses. | ||
| + | |||
| + | *[https://www.usbr.gov/lc/region/g1000/pdfiles/ucbsnact.pdf Upper Colorado River Basin Compact of 1948] - Created the Upper Colorado River Commission and apportioned the Upper Basin's 7.5 maf among Colorado (51.75 percent), New Mexico (11.25 percent), Utah (23 percent), and Wyoming (14 percent); the portion of Arizona that lies within the Upper Colorado Basin was also apportioned 50,000 acre-feet annually. | ||
| + | |||
| + | *[https://www.usbr.gov/lc/region/g1000/pdfiles/mextrety.pdf The Mexican Water Treaty of 1944] - Committed 1.5 maf of the river's annual flow to Mexico. | ||
| + | |||
| + | *[https://www.usbr.gov/lc/region/g1000/pdfiles/ca7pty.pdf California Seven Party Agreement of 1931] - This agreement helped settle the long-standing conflict between California agricultural and municipal interests over Colorado River water priorities. The seven principal claimants - Palo Verde Irrigation District, Yuma Project, Imperial Irrigation District, Coachella Valley Irrigation District, Metropolitan Water District, and the City and County of San Diego - reached consensus in the amounts of water to be allocated on an annual basis to each entity. Although the agreement did not resolve all priority issues, these regulations were also incorporated in the major California water delivery contracts. | ||
| + | |||
| + | *[https://www.usbr.gov/lc/region/g1000/pdfiles/bcpact.pdf The Boulder Canyon Project Act of 1928] - This act: (1) ratified the 1922 Compact; (2) authorized the construction of Hoover Dam and related irrigation facilities in the lower Basin; (3) apportioned the lower basin's 7.5 maf among the states of Arizona (2.8 maf), California (4.4 maf) and Nevada (0.3 maf); and (4) authorized and directed the Secretary of the Interior to function as the sole contracting authority for Colorado River water use in the lower basin. | ||
| + | |||
| + | *[https://www.usbr.gov/lc/region/g1000/pdfiles/crcompct.pdf The Colorado River Compact of 1922] - The cornerstone of the "Law of the River", this Compact was negotiated by the seven Colorado River Basin states and the federal government in 1922. It defined the relationship between the upper basin states, where most of the river's water supply originates, and the lower basin states, where most of the water demands were developing. At the time, the upper basin states were concerned that plans for Hoover Dam and other water development projects in the lower basin would, under the Western water law doctrine of prior appropriation, deprive them of their ability to use the river's flows in the future. The states could not agree on how the waters of the Colorado River Basin should be allocated among them, so the Secretary of Commerce Herbert Hoover suggested the basin be divided into an upper and lower half, with each basin having the right to develop and use 7.5 million acre-feet (maf) of river water annually. This approach reserved water for future upper basin development and allowed planning and development in the lower basin to proceed. | ||
| + | |||
| + | There are several other laws, contracts and document which are part of the "Law of the River" in addition to these provisions, the federal Endangered Species Act and various Native American water claim settlements both affect the extent to which water developments and diversions can be utilized in the Colorado River Basin. | ||
| + | |||
| + | |- | ||
| + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> How do operations at Glen Canyon Dam fit into operations with other CRSP hydropower units? </h2> | ||
| + | |- | ||
| + | |style="color:#000;"| | ||
| + | |||
| + | Glen Canyon Dam operates in conjunction with the other CRSP facilities to meet the contractual demands of CRSP customers. Glen Canyon is the largest asset in the CRSP portfolio and provides much of the baseload, with some load following, for CRSP customers. Blue Mesa and Morrow Point provides an example of "hydropeaking" with generation only occurring during peak hours. | ||
| + | [[File:CRSP generation v demand.JPG|center|thumb|600px|https://www.usbr.gov/uc/progact/amp/twg/2018-01-25-twg-meeting/AR04.pdf]] | ||
| + | |||
|} | |} | ||
| Line 164: | Line 187: | ||
|style="color:#000;"| | |style="color:#000;"| | ||
| − | *[[Media:2017 Glen Canyon Operating Criteria Signed.pdf| | + | *[https://www.usbr.gov/uc/DocLibrary/Memos/20240326-EstablishmentInterimOperatingGuidanceGlenCanyonDamLowReservoirLevels-TechnicalDecisionMemo-508-TSC.pdf 2024 Glen Canyon Dam Interim Low Elevation Operational Guidance] |
| + | *[[Media:2021_Glen_Canyon_Dam_Interagency_Agreementnwgp_(fully_signed).pd.pdf| 2021 Operating Agreement between Reclamation and WAPA regarding the Operation of Glen Canyon Dam]] | ||
| + | *[[Media:2017 Glen Canyon Operating Criteria Signed.pdf| 2016 Operating Criteria for Glen Canyon Dam]] | ||
*[http://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf 2016 LTEMP Record of Decision (ROD)] | *[http://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf 2016 LTEMP Record of Decision (ROD)] | ||
*[http://ltempeis.anl.gov/documents/final-eis/ 2016 LTEMP EIS Final Draft (FEIS)] | *[http://ltempeis.anl.gov/documents/final-eis/ 2016 LTEMP EIS Final Draft (FEIS)] | ||
| Line 181: | Line 206: | ||
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
| + | |||
| + | '''2026''' | ||
| + | *[[Media:202608_Information.pdf| August 2026 Operations call]] | ||
| + | *[[Media:202607_Information.pdf| July 2026 Operations call]] | ||
| + | *[[Media:202606_Information.pdf| June 2026 Operations call]] | ||
| + | *[[Media:202605_Information.pdf| May 2026 Operations call]] | ||
| + | *[[Media:202604_Information.pdf| April 2026 Operations call]] | ||
| + | *[[Media:202603_Information.pdf| March 2026 Operations call]] | ||
| + | *[[Media:202602_Information.pdf| February 2026 Operations call]] | ||
| + | *[[Media:202601_Information.pdf| January 2026 Operations call]] | ||
| + | |||
| + | '''2025''' | ||
| + | *[[Media:202510_Information.pdf| October 2025 Operations call]] | ||
| + | *[[Media:202509_Information.pdf| September 2025 Operations call]] | ||
| + | *[[Media:202508_Information.pdf| August 2025 Operations call]] | ||
| + | *[[Media:202507_Information.pdf| July 2025 Operations call]] | ||
| + | *[[Media:202506_Information.pdf| June 2025 Operations call]] | ||
| + | *[[Media:202505_Information.pdf| May 2025 Operations call]] | ||
| + | *[[Media:202504_Information.pdf| April 2025 Operations call]] | ||
| + | *[[Media:202503_Information.pdf| March 2025 Operations call]] | ||
| + | *[[Media:202502_Information.pdf| February 2025 Operations call]] | ||
| + | *[[Media:202501_Information.pdf| January 2025 Operations call]] | ||
| + | |||
| + | '''2024''' | ||
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2024-02-29-amwg-meeting/20240229-OperationPlanningUpdates-508-UCRO.pdf Operation Planning Updates ] | ||
| + | *[[Media:202412_Information.pdf| December 2024 Operations call]] | ||
| + | *[[Media:202411_Information.pdf| November 2024 Operations call]] | ||
| + | *[[Media:202410_Information.pdf| October 2024 Operations call]] | ||
| + | *[[Media:202409_Information.pdf| September 2024 Operations call]] | ||
| + | *[[Media:202408_Information.pdf| August 2024 Operations call]] | ||
| + | *[[Media:202407_Information.pdf| July 2024 Operations call]] | ||
| + | *[[Media:202406_Information.pdf| June 2024 Operations call]] | ||
| + | *[[Media:202405_Information.pdf| May 2024 Operations call]] | ||
| + | *[[Media:202404_Information.pdf| April 2024 Operations call]] | ||
| + | *[[Media:202403_Information.pdf| March 2024 Operations call]] | ||
| + | *[[Media:202402_Information.pdf| February 2024 Operations call]] | ||
| + | *[[Media:202401_Information.pdf| January 2024 Operations call]] | ||
'''2023''' | '''2023''' | ||
| − | *[ | + | *[[Media:202312_Information.pdf| December 2023 Operations call]] |
| − | *[ | + | *[[Media:202311_Information.pdf| November 2023 Operations call]] |
| − | *[ | + | *[[Media:102023_Information.pdf| October 2023 Operations call]] |
| − | *[ | + | *[[Media:September2023_Information.pdf| September 2023 Operations call]] |
| + | *[[Media:August2023_Information.pdf| August 2023 Operations call]] | ||
| + | *[[Media:July2023_Information.pdf| July 2023 Operations call]] | ||
| + | *[[Media:June2023_Information.pdf| June 2023 Operations call]] | ||
| + | *[[Media:May2023_Information.pdf| May 2023 Operations call]] | ||
| + | *[[Media:Apr2023_Information.pdf| April 2023 Operations call]] | ||
| + | *[[Media:Mar2023_Information.pdf| March 2023 Operations call]] | ||
| + | *[[Media:Feb2023_Information.pdf| February 2023 Operations call]] | ||
| + | *[[Media:Jan2023_Information.pdf| January 2023 Operations call]] | ||
'''2022''' | '''2022''' | ||
| − | *[ | + | *[[Media:Dec2022_Information.pdf| December 2022 Operations call]] |
| − | *[ | + | *[[Media:Nov2022_Information.pdf| November 2022 Operations call]] |
| − | *[ | + | *[[Media:Glen_Canyon_Monthly_Operations_Call_OCT_draft.pdf| October 2022 Operations call]] |
| − | *[ | + | *[[Media:Sep2022_Information.pdf| September 2022 Operations call]] |
| − | *[ | + | *[[Media:Aug2022_Information.pdf| August 2022 Operations call]] |
| − | *[ | + | *[[Media:Jul2022_Information.pdf| July 2022 Operations call]] |
| − | *[ | + | *[[Media:Jun2022_Information.pdf| June 2022 Operations call]] |
| + | *[[Media:May2022_Information.pdf| May 2022 Operations call]] | ||
| + | *[[Media:Apr2022 Information.pdf| April 2022 Operations call]] | ||
| + | *[[Media:Mar2022 Information.pdf| March 2022 Operations call]] | ||
| + | *[[Media:Feb2022 Information.pdf| February 2022 Operations call]] | ||
| + | *[[Media:Jan2022 Information.pdf| January 2022 Operations call]] | ||
'''2021''' | '''2021''' | ||
| − | *[ | + | *[[Media:Dec2021 Information.pdf| December 2021 Operations call]] |
| − | *[ | + | *[[Media:Nov2021 Information.pdf| November 2021 Operations call]] |
| − | *[ | + | *[[Media:Oct2021_Information.pdf| October 2021 Operations call]] |
| − | *[ | + | *[[Media:Sept2021_Information.v1.pdf| September 2021 Operations call]] |
| − | *[ | + | *[[Media:Aug2021_Information.pdf| August 2021 Operations call]] |
| + | *[[Media:July2021_Information.pdf| July 2021 Operations call]] | ||
| + | *[[Media:June2021 Information.pdf| June 2021 Operations call]] | ||
| + | *[[Media:May2021 Information.pdf| May 2021 Operations call]] | ||
| + | *[[Media:Apr2021 Information.pdf| April 2021 Operations call]] | ||
| + | *[[Media:Mar2021 Information.v2.pdf| March 2021 Operations call]] | ||
| + | *[[Media:Feb2021_Information.pdf| February 2021 Operations call]] | ||
| + | *[[Media:Jan2021_Information.pdf| January 2021 Operations call]] | ||
'''2020''' | '''2020''' | ||
| − | |||
| − | |||
*[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-7DReviewReportUpdate.pdf Review of the Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead ] | *[https://www.usbr.gov/uc/progact/amp/amwg/2020-08-20-amwg-meeting/20200820-7DReviewReportUpdate.pdf Review of the Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead ] | ||
| − | *[ | + | *[[Media:Dec2020_Information.pdf| December 2020 Operations call]] |
| − | *[ | + | *[[Media:Nov2020_Information.pdf| November 2020 Operations call]] |
| − | *[ | + | *[[Media:Oct2020_Information.v2.pdf| October 2020 Operations call]] |
| + | *[[Media:Sep2020 Information.v2.pdf| September 2020 Operations call]] | ||
| + | *[[Media:Aug2020_Information.pdf| August 2020 Operations call]] | ||
| + | *[[Media:July2020 Information.v2.pdf| July 2020 Operations call]] | ||
| + | *[[Media:June2020_Information.v2.pdf| June 2020 Operations call]] | ||
| + | *[[Media:May2020_Information.pdf| May 2020 Operations call]] | ||
| + | *[[Media:Apr2020_Information.pdf| April 2020 Operations call]] | ||
| + | *[[Media:Mar2020_Information.pdf| March 2020 Operations call]] | ||
| − | + | |- | |
| − | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> How to Calculate Monthly Volumes </h2> | |
| + | |- | ||
| + | |style="color:#000;"| | ||
| − | + | First: allocate 2.0 MAF to October - December: | |
| − | + | *Divide October, November, and December according to proportions determined by the Contract Rate of Demand (CROD) for power produced at Glen Canyon Dam | |
| − | + | *October receives 642,584 AF or 32.13% of the 2.0 MAF | |
| − | * | + | *November receives 641,532 AF or 32.08% of the 2.0 MAF |
| − | + | *December receives 715,885 AF or 35.79% of the 2.0 MAF | |
| − | * | + | |
| − | * | + | |
| − | + | ||
| − | * | + | |
| − | + | ||
| − | + | Then allocate the remaining annual release according to CROD proportions: | |
| − | * | + | *Jan 12.25% |
| − | * | + | *Feb 10.83% |
| − | * | + | *Mar 11.44% |
| − | * | + | *Apr 10.20% |
| − | * | + | *May 10.15% |
| − | * | + | *Jun 10.65% |
| − | * | + | *Jul 12.02% |
| + | *Aug 12.84% | ||
| + | *Sept 9.63% | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | + | |- | |
| − | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> How to Calculate a Daily Hydrograph </h2> | |
| − | + | |- | |
| − | + | |style="color:#000;"| | |
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | ''' | + | '''Determine the Monthly Volume:''' |
| − | *[https://www.usbr.gov/uc/ | + | *Above or look at the [https://www.usbr.gov/uc/water/crsp/studies/index.html 24-Month Study] |
| − | + | **Example: August, 757,000 AF | |
| − | * | + | |
| − | * | + | |
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | ''' | + | '''Calculate the Daily Fluctuation Factor: ''' |
| − | * | + | *June, July, and August: 10% of the Monthly Volume (in cfs) |
| − | * | + | *All others: 9% of the Monthly Volume (in cfs) |
| − | * | + | **Example: 10% |
| − | + | ||
| − | * | + | |
| − | ''' | + | '''Determine the Allowable Daily Fluctuation (cfs): ''' |
| − | * | + | *Multiply the Monthly Volume by the Daily Fluctuation Factor |
| − | * | + | **Example: 7,570 cfs |
| − | * | + | |
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | ''' | + | '''Determine the Number of Days in the month: <br> |
| − | + | **Example: 31 | |
| − | + | ||
| − | + | ||
| − | + | ||
| − | * | + | |
| − | * | + | |
| − | + | ||
| − | ''' | + | '''Calculate the Daily Volume (acre feet):''' |
| − | * | + | *Divide the Monthly Volume by the Number of Days in the month |
| − | + | **Example: 24,419 AF | |
| − | + | ||
| − | * | + | |
| − | * | + | |
| − | + | ||
| − | + | ||
| − | + | ||
| − | ''' | + | '''Calculate the Mean Daily Discharge (cfs):''' |
| − | * | + | *Multiply the Daily Volume by 43560.000627 |
| + | *Divide by 86400 | ||
| + | **Example: 12,311 cfs | ||
| − | ''' | + | '''Calculate the Base Flow (cfs):''' |
| − | * | + | *Divide the Allowable Daily Fluctuation by 2 |
| + | *Subtract this number from the Mean Daily Discharge | ||
| + | **Example: 8,526 cfs | ||
| − | ''' | + | '''Calculate the Peak Flow (cfs):''' |
| − | * | + | *Divide the Allowable Daily Fluctuation by 2 |
| + | *Add this number from the Mean Daily Discharge | ||
| + | **Example: 16,096 cfs | ||
| − | ''' | + | '''Calculate the number of Hours on Peak:''' |
| − | * | + | *Takes some sort of solver program (GTMax) to construct a hydrograph that maximizes the number of hours on peak with the available Daily Volume |
| + | **10 hours | ||
| + | |||
| + | '''Calculate the timing of Hours on Peak:''' | ||
| + | *Takes some sort of optimization program (GTMax) that schedules releases when electrical power has the most value | ||
| + | |||
| + | |- | ||
| + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> What are the minimum monthly volumes while still staying within the ROD daily minimum releases of 5,000 and 8,000 cfs? </h2> | ||
| + | |- | ||
| + | |style="color:#000;"| | ||
| + | |||
| + | {| class="sortable wikitable" style="text-align:center;" | ||
| + | |- | ||
| + | !Month | ||
| + | !Minimum Monthly Volume (af) | ||
| + | |||
| + | |- | ||
| + | |January||400,950|| | ||
| + | |- | ||
| + | |February||362,149|| | ||
| + | |- | ||
| + | |March||400,950|| | ||
| + | |- | ||
| + | |April||388,017|| | ||
| + | |- | ||
| + | |May||400,950|| | ||
| + | |- | ||
| + | |June||388,017|| | ||
| + | |- | ||
| + | |July||400,950|| | ||
| + | |- | ||
| + | |August||400,950|| | ||
| + | |- | ||
| + | |September||388,017|| | ||
| + | |- | ||
| + | |October||400,950|| | ||
| + | |- | ||
| + | |November||388,017|| | ||
| + | |- | ||
| + | |December||400,950|| | ||
| + | |- | ||
| + | |'''Total'''||'''4,720,868'''|| | ||
| + | |||
| + | |} | ||
|- | |- | ||
| Line 340: | Line 438: | ||
==How much water can be released at Glen Canyon Dam?== | ==How much water can be released at Glen Canyon Dam?== | ||
| − | * 8 generators = 4,000 cfs each = 32,000 cfs | + | * 8 generators = 4,000 cfs each = 32,000 cfs |
* 4 bypass tubes = 3,750 cfs each = 15,000 cfs | * 4 bypass tubes = 3,750 cfs each = 15,000 cfs | ||
| − | * 2 spillways = up to 208,000 cfs [http://www.usbr.gov/lc/region/g4000/AOP2014/AOP14_2nd_Consultation_PPT.pdf] | + | * 2 spillways = up to 208,000 cfs [http://www.usbr.gov/lc/region/g4000/AOP2014/AOP14_2nd_Consultation_PPT.pdf] <br> |
| + | As reservoir elevations decline, lower pressure (head) pushes less water through the penstocks and bypass tubes. | ||
==Critical water elevations== | ==Critical water elevations== | ||
| Line 355: | Line 454: | ||
==How fast do water and waves flow down the Grand Canyon?== | ==How fast do water and waves flow down the Grand Canyon?== | ||
*[https://pubs.usgs.gov/fs/FS-168-97/pdf/fs-168-97.pdf The Colorado River in Grand Canyon: How Fast Does It Flow?] | *[https://pubs.usgs.gov/fs/FS-168-97/pdf/fs-168-97.pdf The Colorado River in Grand Canyon: How Fast Does It Flow?] | ||
| − | Discharge waves move downstream faster than the water. For example, in May 1991, the discharge waves produced by rapidly changing dam releases moved through the canyon in about 1 2/3 days, whereas the water took about 4 1/3 days to travel the 235 miles from Lees Ferry to Gneiss Canyon. | + | Discharge waves move downstream faster than the water. For example, in May 1991, the discharge waves produced by rapidly changing dam releases moved through the canyon in about 1 2/3 days, whereas the water took about 4 1/3 days to travel the 235 miles from Lees Ferry to Gneiss Canyon (RM 235.7). |
*[https://rrfw.org/RaftingGrandCanyon/Tide_Tables?fbclid=IwAR3EArfvBzN5J6oVGVb353fPC-C4Ngo174-7yvcFDssm2PL9Y9qfMp5HiC8 Tide Tables] | *[https://rrfw.org/RaftingGrandCanyon/Tide_Tables?fbclid=IwAR3EArfvBzN5J6oVGVb353fPC-C4Ngo174-7yvcFDssm2PL9Y9qfMp5HiC8 Tide Tables] | ||
Latest revision as of 16:50, 8 September 2026
|
Operations of Glen Canyon DamThe LTEMP Record of Decision (ROD) on the operation of Glen Canyon Dam was signed on December 15, 2016. It changed operations at Glen Canyon from the 1996 ROD that implemented the MLFF flow regime.
Maximum non-experimental flows:
Daily range:
Ramp rates:
|
| Current Status |
Current Operations | Inflow Forecasts and Model Projections |
|---|
|
|