Difference between revisions of "GCDAMP Glen Canyon Dam"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
(51 intermediate revisions by the same user not shown) | |||
Line 58: | Line 58: | ||
== '''Glen Canyon Monthly Operational Call''' == | == '''Glen Canyon Monthly Operational Call''' == | ||
− | *[[Media: | + | The DOI also will conduct monthly Glen Canyon Dam operational coordination meetings or calls with the DOI bureaus (USGS, NPS, FWS, BIA, and Reclamation), WAPA, AZGFD, and representatives from the Basin States and the UCRC. Each DOI bureau will provide updates on the status of resources and dam operations. In addition, WAPA will provide updates on the status of the Basin Fund, projected purchase power prices, and its financial and operational considerations. These meetings or calls are intended to provide an opportunity for participants to share and obtain the most up-to-date information on dam operational considerations and the status of resources (including ecological, cultural, Tribal, recreation, and the Basin Fund). One liaison from each Basin State and from the UCRC will be allowed to participate in the monthly operational coordination meetings or calls. [https://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf] |
− | *[[Media: | + | |
− | *[[Media: | + | *[[Media:202411_Information.pdf| November 2024 Operations call]] |
− | *[[Media: | + | *[[Media:202410_Information.pdf| October 2024 Operations call]] |
− | *[[Media: | + | *[[Media:202409_Information.pdf| September 2024 Operations call]] |
− | *[[Media: | + | *[[Media:202408_Information.pdf| August 2024 Operations call]] |
− | *[[Media: | + | *[[Media:202407_Information.pdf| July 2024 Operations call]] |
− | *[[Media: | + | *[[Media:202406_Information.pdf| June 2024 Operations call]] |
− | *[[Media: | + | *[[Media:202405_Information.pdf| May 2024 Operations call]] |
− | *[[Media: | + | *[[Media:202404_Information.pdf| April 2024 Operations call]] |
− | *[[Media: | + | *[[Media:202403_Information.pdf| March 2024 Operations call]] |
− | *[[Media: | + | *[[Media:202402_Information.pdf| February 2024 Operations call]] |
− | *[[Media: | + | *[[Media:202401_Information.pdf| January 2024 Operations call]] |
− | *[[Media: | + | *[[Media:202312_Information.pdf| December 2023 Operations call]] |
− | + | *[[Media:202311_Information.pdf| November 2023 Operations call]] | |
− | + | *[[Media:102023_Information.pdf| October 2023 Operations call]] | |
− | + | ||
− | + | [[Archived Glen Canyon Monthly Operations Call slides]] | |
− | + | ||
− | + | |- | |
− | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> Critical Reservoir Elevations at Powell and Mead</h2> | |
+ | |- | ||
+ | |style="color:#000;"| | ||
+ | |||
+ | [[File:Glen_Canyon_critical_elevations.png|center|600px]] | ||
+ | |||
+ | |||
+ | [[File:Mead_critical_elevations.png|center|600px]] | ||
== '''USBR Monthly/Annual Reports''' == | == '''USBR Monthly/Annual Reports''' == | ||
Line 86: | Line 93: | ||
*[https://www.usbr.gov/uc/water/rsvrs/ops/aop/index.html Annual Operating Plans for Colorado River reservoirs] | *[https://www.usbr.gov/uc/water/rsvrs/ops/aop/index.html Annual Operating Plans for Colorado River reservoirs] | ||
− | == '''Report to Congress Regarding Operations of Glen Canyon Dam'''[https://www.usbr.gov/uc/ | + | == '''Report to Congress Regarding Operations of Glen Canyon Dam'''[https://www.usbr.gov/uc/DocLibrary/reports.html] == |
− | *[https://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2016-2017.pdf | + | *[https://www.usbr.gov/uc/DocLibrary/Reports/GlenCanyonDam/20210500-GlenCanyonDam-ReportCongress-2020-2021-508-UCRO.pdf Report to Congress - Water Year 2020-2021 ] |
+ | *[https://www.usbr.gov/uc/DocLibrary/Reports/GlenCanyonDam/20210400-GlenCanyonDam-ReportCongress-2019-2020-508-UCRO.pdf Report to Congress - Water Year 2019-2020] | ||
+ | *[https://www.usbr.gov/uc/DocLibrary/Reports/GlenCanyonDam/20200600-GlenCanyonDam-ReportCongress-2018-2019-508-UCRO.pdf Report to Congress - Water Year 2018-2019] | ||
+ | *[https://www.usbr.gov/uc/DocLibrary/Reports/GlenCanyonDam/20180800-GlenCanyonDam-ReportCongress-2017-2018-508-UCRO.pdf Report to Congress - Water Year 2017-2018] | ||
+ | *[https://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2016-2017.pdf Report to Congress - Water Year 2016-2017 ] | ||
*[[Media:Years 2015-16 GC Report to Congress FINAL.pdf| 2015-2016 Report to Congress ]] | *[[Media:Years 2015-16 GC Report to Congress FINAL.pdf| 2015-2016 Report to Congress ]] | ||
− | *[ | + | *[https://www.usbr.gov/uc/DocLibrary/Reports/GlenCanyonDam/20150800-GlenCanyonDam-ReportCongress-2014-2015-508-UCRO.pdf 2014-2015 Report to Congress ] |
*[http://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2013-2014.pdf 2013-2014 Report to Congress ] | *[http://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2013-2014.pdf 2013-2014 Report to Congress ] | ||
*[http://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2010-2011.pdf 2010-2011 Report to Congress ] | *[http://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2010-2011.pdf 2010-2011 Report to Congress ] | ||
Line 103: | Line 114: | ||
The Glen Canyon Power Operations Center operators utilize the generation schedule supplied by Western to operate the generating units while giving consideration to efficiency and equipment characteristics. In addition, the generators automatically respond to a “regulation signal” developed and electronically transmitted to the dam by Western for continuous response to power system load and frequency changes. (This is further described later in this paper). [https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | The Glen Canyon Power Operations Center operators utilize the generation schedule supplied by Western to operate the generating units while giving consideration to efficiency and equipment characteristics. In addition, the generators automatically respond to a “regulation signal” developed and electronically transmitted to the dam by Western for continuous response to power system load and frequency changes. (This is further described later in this paper). [https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
Line 139: | Line 141: | ||
It was the invocation of emergency exception criteria on April 1st, 1998 which piqued the interest of some AMWG members in Reclamation and Western’s interpretation of the ROD.[https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | It was the invocation of emergency exception criteria on April 1st, 1998 which piqued the interest of some AMWG members in Reclamation and Western’s interpretation of the ROD.[https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
Line 179: | Line 164: | ||
*Add release data to Western’s web site and provide periodic reports to the TWG on the operation of Glen Canyon Dam and, | *Add release data to Western’s web site and provide periodic reports to the TWG on the operation of Glen Canyon Dam and, | ||
*Continue efforts to for better coordination between Reclamation and Western regarding the scheduling and operation of Glen Canyon Dam.[https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | *Continue efforts to for better coordination between Reclamation and Western regarding the scheduling and operation of Glen Canyon Dam.[https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | ||
+ | |||
+ | |||
+ | [[File:Glen_Canyon_Dam_filling.png|center|600px]] <br> | ||
+ | The back of Glen Canyon Dam as Lake Powell was filling showing the 8 penstocks on the right and the two river outlet works on the left. | ||
|} | |} | ||
Line 192: | Line 181: | ||
|style="color:#000;"| | |style="color:#000;"| | ||
+ | *[https://www.usbr.gov/uc/DocLibrary/Memos/20240326-EstablishmentInterimOperatingGuidanceGlenCanyonDamLowReservoirLevels-TechnicalDecisionMemo-508-TSC.pdf Glen Canyon Dam Interim Low Elevation Operational Guidance] | ||
*[[Media:2017 Glen Canyon Operating Criteria Signed.pdf| 2017 Operating Criteria for Glen Canyon Dam]] | *[[Media:2017 Glen Canyon Operating Criteria Signed.pdf| 2017 Operating Criteria for Glen Canyon Dam]] | ||
*[http://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf 2016 LTEMP Record of Decision (ROD)] | *[http://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf 2016 LTEMP Record of Decision (ROD)] | ||
Line 209: | Line 199: | ||
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
+ | |||
+ | '''2024''' | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2024-05-15-amwg-meeting/20240515-BasinHydrologyOperations-508-UCRO.pdf Basin Hydrology and Operations ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2024-02-29-amwg-meeting/20240229-OperationPlanningUpdates-508-UCRO.pdf Operation Planning Updates ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2024-02-29-amwg-meeting/20240229-BasinHydrologyOperations-508-UCRO.pdf Basin Hydrology and Operations ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2024-01-25-twg-meeting/20240125-TWGMeeting-BasinHydrologyOperations-508-UCRO.pdf Basin Hydrology and Operations ] | ||
+ | |||
+ | '''2023''' | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2023-11-08-twg-meeting/20231108-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations and Water Quality] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2023-08-17-amwg-meeting/20230817-BasinHydrologyOperations-508-UCRO.pdf Basin Hydrology and Operations] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2023-06-15-twg-meeting/20230615-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations, and Water Quality] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2023-04-13-twg-meeting/20230413-BasinHydrologyOperations-508-UCRO.pdf Basin Hydrology and Operations] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2023-02-16-amwg-meeting/20230216-GlenCanyonDamOperationsUpperBasinHydrologyWaterQuality-508-UCRO.pdf Glen Canyon Dam Operations and Upper Basin Hydrology and Water Quality] | ||
+ | |||
+ | '''2022''' | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2022-10-13-twg-meeting/20221013-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations and Water Quality ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2022-08-18-amwg-meeting/20220818-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations and Water Quality ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2022-06-16-twg-meeting/20220616-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations and Water Quality ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2022-05-18-amwg-meeting/20220518-BasinHydrologyOperations-508-UCRO.pdf Basin Hydrology and Operations ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2022-04-13-twg-meeting/20220413-BasinHydrologyOperationsWaterQuality-Presentation-508-UCRO.pdf Basin Hydrology, Operations, and Water Quality ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2022-02-10-amwg-meeting/20220210-BasinHydrologyWaterQualityOperations-508-UCRO.pdf Basin Hydrology, Water Quality, and Operations ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2022-01-13-twg-meeting/20220113-TWGMeeting-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations and Water Quality ] | ||
'''2021''' | '''2021''' |
Latest revision as of 17:04, 20 November 2024
|
Operations of Glen Canyon DamThe LTEMP Record of Decision (ROD) on the operation of Glen Canyon Dam was signed on December 15, 2016. It changed operations at Glen Canyon from the 1996 ROD that implemented the MLFF flow regime.
Maximum non-experimental flows:
Daily range:
Ramp rates:
|
Current Status |
Current Operations | Inflow Forecasts and Model Projections |
---|
|
|